lastID = -10033657
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Maximizing the Benefits of Standardized Green Infrastructure During and Post Construction
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2023-08-16 08:15:16 Adam Phillips
  • 2022-05-06 15:06:04 Adam Phillips
  • 2022-05-06 15:06:03 Adam Phillips
  • 2021-02-04 15:39:34 Andrea Cale
  • 2021-02-04 15:39:33 Andrea Cale
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Maximizing the Benefits of Standardized Green Infrastructure During and Post Construction

Maximizing the Benefits of Standardized Green Infrastructure During and Post Construction

Maximizing the Benefits of Standardized Green Infrastructure During and Post Construction

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Maximizing the Benefits of Standardized Green Infrastructure During and Post Construction
Abstract
Like many utilities and municipalities faced with the challenge of implementing and maintaining hundreds of green infrastructure (GI) facilities, DC Water has made significant inroads towards streamlining and standardizing its GI designs and permitting process. In the District of Columbia, District agencies had been designing and constructing GI with custom, site-specific designs. These facilities came with high design and construction costs, inefficiencies, and inconsistent designs/aesthetics, especially across the various agencies. A significant portion of the project cost for relatively small and low-cost GI facilities is often related to the design. Additionally, because DC Water sits outside the District government, GI costs are further increased due to the need to work with agencies to permit each custom-designed facility and rehabilitate surrounding portions of roadways and alleys once construction is complete. There exists significant opportunity to reduce costs through improved agency coordination and through standard design and construction. This paper explores lessons learned and innovative solutions when DC Water, in collaboration with District agencies, developed a standard design process for permeable alleyways using GIS and standard construction details.
Like many utilities and municipalities faced with the challenge of implementing and maintaining hundreds of green infrastructure (GI) facilities, DC Water has made significant inroads towards streamlining and standardizing its GI designs and permitting process. In the District of Columbia, District agencies had been designing and constructing GI with custom, site-specific designs. These facilities came with high design and construction costs, inefficiencies, and inconsistent designs/aesthetics, especially across the various agencies. A significant portion of the project cost for relatively small and low-cost GI facilities is often related to the design. Additionally, because DC Water sits outside the District government, GI costs are further increased due to the need to work with agencies to permit each custom-designed facility and rehabilitate surrounding portions of roadways and alleys once construction is complete. There exists significant opportunity to reduce costs through improved agency coordination and through standard design and construction. This paper explores lessons learned and innovative solutions when DC Water, in collaboration with District agencies, developed a standard design process for permeable alleyways using GIS and standard construction details.
Author(s)
Eric LienhardSeth Charde
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Mar 2020
ISSN1938-6478
DOI10.2175/193864718825157616
Volume / Issue
Content sourceNational Stormwater Symposium
Copyright2020
Word count12
Subject keywordsPerformance of Post-Construction Control Measures

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Maximizing the Benefits of Standardized Green Infrastructure During and Post Construction'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Maximizing the Benefits of Standardized Green Infrastructure During and Post Construction
Pricing
Non-member price: $11.50
Member price:
-10033657
Get access
-10033657
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Maximizing the Benefits of Standardized Green Infrastructure During and Post Construction'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Maximizing the Benefits of Standardized Green Infrastructure During and Post Construction
Abstract
Like many utilities and municipalities faced with the challenge of implementing and maintaining hundreds of green infrastructure (GI) facilities, DC Water has made significant inroads towards streamlining and standardizing its GI designs and permitting process. In the District of Columbia, District agencies had been designing and constructing GI with custom, site-specific designs. These facilities came with high design and construction costs, inefficiencies, and inconsistent designs/aesthetics, especially across the various agencies. A significant portion of the project cost for relatively small and low-cost GI facilities is often related to the design. Additionally, because DC Water sits outside the District government, GI costs are further increased due to the need to work with agencies to permit each custom-designed facility and rehabilitate surrounding portions of roadways and alleys once construction is complete. There exists significant opportunity to reduce costs through improved agency coordination and through standard design and construction. This paper explores lessons learned and innovative solutions when DC Water, in collaboration with District agencies, developed a standard design process for permeable alleyways using GIS and standard construction details.
Like many utilities and municipalities faced with the challenge of implementing and maintaining hundreds of green infrastructure (GI) facilities, DC Water has made significant inroads towards streamlining and standardizing its GI designs and permitting process. In the District of Columbia, District agencies had been designing and constructing GI with custom, site-specific designs. These facilities came with high design and construction costs, inefficiencies, and inconsistent designs/aesthetics, especially across the various agencies. A significant portion of the project cost for relatively small and low-cost GI facilities is often related to the design. Additionally, because DC Water sits outside the District government, GI costs are further increased due to the need to work with agencies to permit each custom-designed facility and rehabilitate surrounding portions of roadways and alleys once construction is complete. There exists significant opportunity to reduce costs through improved agency coordination and through standard design and construction. This paper explores lessons learned and innovative solutions when DC Water, in collaboration with District agencies, developed a standard design process for permeable alleyways using GIS and standard construction details.
Author(s)
Eric LienhardSeth Charde
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Mar 2020
ISSN1938-6478
DOI10.2175/193864718825157616
Volume / Issue
Content sourceNational Stormwater Symposium
Copyright2020
Word count12
Subject keywordsPerformance of Post-Construction Control Measures

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Eric Lienhard#Seth Charde. Maximizing the Benefits of Standardized Green Infrastructure During and Post Construction. Water Environment Federation, 2021. Web. 22 Sep. 2025. <https://www.accesswater.org?id=-10033657CITANCHOR>.
Eric Lienhard#Seth Charde. Maximizing the Benefits of Standardized Green Infrastructure During and Post Construction. Water Environment Federation, 2021. Accessed September 22, 2025. https://www.accesswater.org/?id=-10033657CITANCHOR.
Eric Lienhard#Seth Charde
Maximizing the Benefits of Standardized Green Infrastructure During and Post Construction
Access Water
Water Environment Federation
February 4, 2021
September 22, 2025
https://www.accesswater.org/?id=-10033657CITANCHOR