Description: Small Project Big Savings
The existing collection system has approximately 29 km (18 mi) of pipeline, 210 manholes, and 3 lift stations to pump wastewater from different sections of the valley to the treatment facility.
PublisherWater Environment Federation
Word count350
Description: Small Project Big Savings
The downturn in the economy in 2008 delayed the anticipated development so the flows did not increase at the time of startup. The facility had a more difficult time with treatment due to the flows being below minimum design. This problem continued through 2011. Another challenge that MVWTP faced was that it takes a long time for wastewater to reach the treatment facility due to a large...
PublisherWater Environment Federation
Word count446
Description: Small Project Big Savings
MVWTP took an idea from treatment facilities in Las Vegas that also have a stringent phosphorus limit. The four larger wastewater facilities that operate within Clark County use biological phosphorus removal (Bio-P) followed by chemical polishing to meet stringent phosphorus limits. To meet this stringent limit by Bio-P, a large carbon source is required. These facilities have developed their own...
PublisherWater Environment Federation
Word count396
Description: Small Project Big Savings
MVWTP slowly reduced how much supplemental carbon it added over 3 months and subsequently generated a soluble carbon source. Microorganisms take a certain amount of time to acclimate to the change in their food source. Figure 3 (below) illustrates the effluent TN concentrations before and after the optimization of carbon source production. The figure shows that it took few months for TN effluent...
PublisherWater Environment Federation
Word count280
Small Project Big Savings