lastID = -291843
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
DOING MORE WITH LESS - UNLOCKING CAPACITY
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-01-31 22:10:54 Administrator
  • 2020-01-31 22:10:53 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
DOING MORE WITH LESS - UNLOCKING CAPACITY

DOING MORE WITH LESS - UNLOCKING CAPACITY

DOING MORE WITH LESS - UNLOCKING CAPACITY

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
DOING MORE WITH LESS - UNLOCKING CAPACITY
Abstract
After almost fifty years of service, the City of Ukiah's Wastewater Treatment Plant (WWTP) began to show indications it was operating at capacity. Engineering planning and design work began in December 2002 to replace the now dated technology of the original facilities and rehabilitate and expand the rest of the WWTP to meet current and future discharge requirements. Finding ways to increase process capacity until the new facilities are completed became of paramount importance.A study was completed in 2003 to determine the WWTP's process capacity. The results of this study verified that the WWTP was at capacity and was primarily limited by its process capacity, particularly soluble BOD removal capacity. Following the plant capacity analysis, a brainstorming session was held to discuss methods to increase capacity in the interim until WWTP improvements could be completed to increase capacity. Chemically enhanced primary treatment (CEPT) with ferric chloride and polymer additions near the influent of the aerated grit tanks showed the most promise with an increase in BOD removal of 15 percent to 20 percent. Another method that is helping the WWTP meet its permit limits is the use of the AWT facility during the period from May 15th to September 30th when the WWTP can only discharge to three evaporation/percolation ponds.As a result of the study and brainstorming session, procedural and operational changes were made that increased the plant's interim capacity. The additional capacity has allowed the Ukiah City Council to lift the restrictions on the sale of new sewer connections and avoid future restrictions and moratoriums until the WWTP improvements are completed in October 2008.
After almost fifty years of service, the City of Ukiah's Wastewater Treatment Plant (WWTP) began to show indications it was operating at capacity. Engineering planning and design work began in December 2002 to replace the now dated technology of the original facilities and rehabilitate and expand the rest of the WWTP to meet current and future discharge requirements. Finding ways to increase...
Author(s)
Ann BurckJerry GallTimothy R. BanyaiEric J. Wahlberg
SourceProceedings of the Water Environment Federation
SubjectSession 45: Small Community & Natural Treatment Systems: Small Community System Upgrades and Management
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:12L.3742;1-
DOI10.2175/193864705783866298
Volume / Issue2005 / 12
Content sourceWEFTEC
First / last page(s)3742 - 3758
Copyright2005
Word count272

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'DOING MORE WITH LESS - UNLOCKING CAPACITY'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
DOING MORE WITH LESS - UNLOCKING CAPACITY
Pricing
Non-member price: $11.50
Member price:
-291843
Get access
-291843
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'DOING MORE WITH LESS - UNLOCKING CAPACITY'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
DOING MORE WITH LESS - UNLOCKING CAPACITY
Abstract
After almost fifty years of service, the City of Ukiah's Wastewater Treatment Plant (WWTP) began to show indications it was operating at capacity. Engineering planning and design work began in December 2002 to replace the now dated technology of the original facilities and rehabilitate and expand the rest of the WWTP to meet current and future discharge requirements. Finding ways to increase process capacity until the new facilities are completed became of paramount importance.A study was completed in 2003 to determine the WWTP's process capacity. The results of this study verified that the WWTP was at capacity and was primarily limited by its process capacity, particularly soluble BOD removal capacity. Following the plant capacity analysis, a brainstorming session was held to discuss methods to increase capacity in the interim until WWTP improvements could be completed to increase capacity. Chemically enhanced primary treatment (CEPT) with ferric chloride and polymer additions near the influent of the aerated grit tanks showed the most promise with an increase in BOD removal of 15 percent to 20 percent. Another method that is helping the WWTP meet its permit limits is the use of the AWT facility during the period from May 15th to September 30th when the WWTP can only discharge to three evaporation/percolation ponds.As a result of the study and brainstorming session, procedural and operational changes were made that increased the plant's interim capacity. The additional capacity has allowed the Ukiah City Council to lift the restrictions on the sale of new sewer connections and avoid future restrictions and moratoriums until the WWTP improvements are completed in October 2008.
After almost fifty years of service, the City of Ukiah's Wastewater Treatment Plant (WWTP) began to show indications it was operating at capacity. Engineering planning and design work began in December 2002 to replace the now dated technology of the original facilities and rehabilitate and expand the rest of the WWTP to meet current and future discharge requirements. Finding ways to increase...
Author(s)
Ann BurckJerry GallTimothy R. BanyaiEric J. Wahlberg
SourceProceedings of the Water Environment Federation
SubjectSession 45: Small Community & Natural Treatment Systems: Small Community System Upgrades and Management
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:12L.3742;1-
DOI10.2175/193864705783866298
Volume / Issue2005 / 12
Content sourceWEFTEC
First / last page(s)3742 - 3758
Copyright2005
Word count272

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Ann Burck# Jerry Gall# Timothy R. Banyai# Eric J. Wahlberg. DOING MORE WITH LESS - UNLOCKING CAPACITY. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 1 Oct. 2025. <https://www.accesswater.org?id=-291843CITANCHOR>.
Ann Burck# Jerry Gall# Timothy R. Banyai# Eric J. Wahlberg. DOING MORE WITH LESS - UNLOCKING CAPACITY. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed October 1, 2025. https://www.accesswater.org/?id=-291843CITANCHOR.
Ann Burck# Jerry Gall# Timothy R. Banyai# Eric J. Wahlberg
DOING MORE WITH LESS - UNLOCKING CAPACITY
Access Water
Water Environment Federation
December 22, 2018
October 1, 2025
https://www.accesswater.org/?id=-291843CITANCHOR