lastID = -294853
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Predicting Potential Groundwater Impacts on a Deep Tunnel CSO Control Project
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-02-01 03:09:46 Administrator
  • 2020-02-01 03:09:45 Administrator
  • 2020-02-01 03:09:44 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Predicting Potential Groundwater Impacts on a Deep Tunnel CSO Control Project

Predicting Potential Groundwater Impacts on a Deep Tunnel CSO Control Project

Predicting Potential Groundwater Impacts on a Deep Tunnel CSO Control Project

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Predicting Potential Groundwater Impacts on a Deep Tunnel CSO Control Project
Abstract
Underground tunnel conveyance systems are a practical solution for storing large volumes of combined sewer overflow (CSO) with limited surface disruption during construction. Careful consideration during the evaluation and preliminary design phase of the project can help to mitigate risk and potential pitfalls during detailed design and construction. Early planning in the preliminary design phases can reap great project rewards, cost less, and lower risk during construction. This paper presents the principal groundwater protection elements for the development and constructability considerations of a CSO storage and conveyance tunnel project. Information presented includes the evaluation of the geology and hydrogeology of the tunnel alignment corridor, construction considerations, project considerations, geotechnical exploration program, risk management strategies, and modeled conclusions to protect a City's groundwater supply.
Underground tunnel conveyance systems are a practical solution for storing large volumes of combined sewer overflow (CSO) with limited surface disruption during construction. Careful consideration during the evaluation and preliminary design phase of the project can help to mitigate risk and potential pitfalls during detailed design and construction. Early planning in the preliminary design phases...
Author(s)
J. TrypusB. MasbaumJ. OakleyK. Hahn
SourceProceedings of the Water Environment Federation
SubjectSession 74: Groundwater: Contemporary Issues in Contaminants, Remediation, Recharge, and Regulation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:10L.5756;1-
DOI10.2175/193864708788807547
Volume / Issue2008 / 10
Content sourceWEFTEC
First / last page(s)5756 - 5761
Copyright2008
Word count134

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Predicting Potential Groundwater Impacts on a Deep Tunnel CSO Control Project'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Predicting Potential Groundwater Impacts on a Deep Tunnel CSO Control Project
Pricing
Non-member price: $11.50
Member price:
-294853
Get access
-294853
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Predicting Potential Groundwater Impacts on a Deep Tunnel CSO Control Project'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Predicting Potential Groundwater Impacts on a Deep Tunnel CSO Control Project
Abstract
Underground tunnel conveyance systems are a practical solution for storing large volumes of combined sewer overflow (CSO) with limited surface disruption during construction. Careful consideration during the evaluation and preliminary design phase of the project can help to mitigate risk and potential pitfalls during detailed design and construction. Early planning in the preliminary design phases can reap great project rewards, cost less, and lower risk during construction. This paper presents the principal groundwater protection elements for the development and constructability considerations of a CSO storage and conveyance tunnel project. Information presented includes the evaluation of the geology and hydrogeology of the tunnel alignment corridor, construction considerations, project considerations, geotechnical exploration program, risk management strategies, and modeled conclusions to protect a City's groundwater supply.
Underground tunnel conveyance systems are a practical solution for storing large volumes of combined sewer overflow (CSO) with limited surface disruption during construction. Careful consideration during the evaluation and preliminary design phase of the project can help to mitigate risk and potential pitfalls during detailed design and construction. Early planning in the preliminary design phases...
Author(s)
J. TrypusB. MasbaumJ. OakleyK. Hahn
SourceProceedings of the Water Environment Federation
SubjectSession 74: Groundwater: Contemporary Issues in Contaminants, Remediation, Recharge, and Regulation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:10L.5756;1-
DOI10.2175/193864708788807547
Volume / Issue2008 / 10
Content sourceWEFTEC
First / last page(s)5756 - 5761
Copyright2008
Word count134

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
J. Trypus# B. Masbaum# J. Oakley# K. Hahn. Predicting Potential Groundwater Impacts on a Deep Tunnel CSO Control Project. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 29 Sep. 2025. <https://www.accesswater.org?id=-294853CITANCHOR>.
J. Trypus# B. Masbaum# J. Oakley# K. Hahn. Predicting Potential Groundwater Impacts on a Deep Tunnel CSO Control Project. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed September 29, 2025. https://www.accesswater.org/?id=-294853CITANCHOR.
J. Trypus# B. Masbaum# J. Oakley# K. Hahn
Predicting Potential Groundwater Impacts on a Deep Tunnel CSO Control Project
Access Water
Water Environment Federation
December 22, 2018
September 29, 2025
https://www.accesswater.org/?id=-294853CITANCHOR