lastID = -295678
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Loading icon
Description: Access Water
Context Menu
Description: Book cover
ALCOSAN – Ravine Street Stream Removal Program
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 20:14:37 Adam Phillips
  • 2022-05-04 20:14:36 Adam Phillips
  • 2020-03-26 22:09:01 Adam Phillips
  • 2020-03-26 22:09:00 Adam Phillips
  • 2020-01-31 19:25:40 Administrator
  • 2020-01-31 19:25:39 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
ALCOSAN – Ravine Street Stream Removal Program

ALCOSAN – Ravine Street Stream Removal Program

ALCOSAN – Ravine Street Stream Removal Program

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
ALCOSAN – Ravine Street Stream Removal Program
Abstract
The Allegheny County Sanitary Authority (ALCOSAN) is committed to reducing extraneous sources of stormwater that enter their interceptor system and subsequently are conveyed to the treatment plant. The entry of large quantities of stormwater contributes to combined sewer overflows (CSO's), hydraulic overloading, sediment buildup and increased treatment costs. One major source of stormwater inflow to the system occurs where natural streams have been intercepted by municipal combined sewer systems and subsequently conveyed to the ALCOSAN interceptor system. In most cases, these direct stream connections were built in an era prior to the establishment of ALCOSAN, when municipal sewer systems simply discharged to the rivers and streams. When ALCOSAN built the sewage treatment plant and interceptor sewer system in the 1950's, these stream inflow points were often distant from rivers and creeks, and therefore they were either unknown or difficult if not impossible to remove. The CSO diversion structures enabled the ALCOSAN interceptor system to take sanitary sewer flow during dry weather periods while allowing the drastically greater wet weather flow to simply overflow through flap gates.As the regulations for CSO's have changed and become much more stringent since the construction of the ALCOSAN system, it has become necessary to seriously re-evaluate the locations where streams enter the combined sewer system and determine the feasibility of removing them and conveying them to a waterway.This paper details the process of performing a feasibility study for removal of a direct stream connection to a municipal combined sewer system that flows into the ALCOSAN system. When the original scope of work was developed, it seemed to be a relatively simple problem to approach in that a single location had been identified where the stream entered the sewer system. Despite the availability of many sources of sewer system data, one of the most interesting discoveries was just how many discrepancies there were with regards to the existing system configuration. For example, as the system was investigated, a major highway drainage system was found to be connected to the combined sewer system, yet not shown on any maps. Ultimately, the scope of the feasibility study virtually doubled in magnitude simply due to the findings from the intense field reconnaissance work.Throughout the development of the alternatives, the complexities of intercepting the flows and conveying them though a densely populated urban community seemed to grow with each subsequent level of design detail. Ultimately, a viable alternative was developed that fulfilled the need to remove the two major sources of stream and storm water inflow to the system and convey them to the river. However, the complexity of the developed alternative was startling in comparison to the apparent simplicity of the original plan to intercept a single stream input source and convey it to the river.
The Allegheny County Sanitary Authority (ALCOSAN) is committed to reducing extraneous sources of stormwater that enter their interceptor system and subsequently are conveyed to the treatment plant. The entry of large quantities of stormwater contributes to combined sewer overflows (CSO's), hydraulic overloading, sediment buildup and increased treatment costs. One major source of stormwater inflow...
Author(s)
David W. TroianosBradley G. DudaJan Oliver
SourceProceedings of the Water Environment Federation
SubjectSession 10: The Next Step of CSO Management
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:5L.752;1-
DOI10.2175/193864708788812947
Volume / Issue2008 / 5
Content sourceCollection Systems Conference
First / last page(s)752 - 765
Copyright2008
Word count464

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'ALCOSAN – Ravine Street Stream Removal Program'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
ALCOSAN – Ravine Street Stream Removal Program
Pricing
Non-member price: $11.50
Member price:
-295678
Get access
-295678
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'ALCOSAN – Ravine Street Stream Removal Program'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
ALCOSAN – Ravine Street Stream Removal Program
Abstract
The Allegheny County Sanitary Authority (ALCOSAN) is committed to reducing extraneous sources of stormwater that enter their interceptor system and subsequently are conveyed to the treatment plant. The entry of large quantities of stormwater contributes to combined sewer overflows (CSO's), hydraulic overloading, sediment buildup and increased treatment costs. One major source of stormwater inflow to the system occurs where natural streams have been intercepted by municipal combined sewer systems and subsequently conveyed to the ALCOSAN interceptor system. In most cases, these direct stream connections were built in an era prior to the establishment of ALCOSAN, when municipal sewer systems simply discharged to the rivers and streams. When ALCOSAN built the sewage treatment plant and interceptor sewer system in the 1950's, these stream inflow points were often distant from rivers and creeks, and therefore they were either unknown or difficult if not impossible to remove. The CSO diversion structures enabled the ALCOSAN interceptor system to take sanitary sewer flow during dry weather periods while allowing the drastically greater wet weather flow to simply overflow through flap gates.As the regulations for CSO's have changed and become much more stringent since the construction of the ALCOSAN system, it has become necessary to seriously re-evaluate the locations where streams enter the combined sewer system and determine the feasibility of removing them and conveying them to a waterway.This paper details the process of performing a feasibility study for removal of a direct stream connection to a municipal combined sewer system that flows into the ALCOSAN system. When the original scope of work was developed, it seemed to be a relatively simple problem to approach in that a single location had been identified where the stream entered the sewer system. Despite the availability of many sources of sewer system data, one of the most interesting discoveries was just how many discrepancies there were with regards to the existing system configuration. For example, as the system was investigated, a major highway drainage system was found to be connected to the combined sewer system, yet not shown on any maps. Ultimately, the scope of the feasibility study virtually doubled in magnitude simply due to the findings from the intense field reconnaissance work.Throughout the development of the alternatives, the complexities of intercepting the flows and conveying them though a densely populated urban community seemed to grow with each subsequent level of design detail. Ultimately, a viable alternative was developed that fulfilled the need to remove the two major sources of stream and storm water inflow to the system and convey them to the river. However, the complexity of the developed alternative was startling in comparison to the apparent simplicity of the original plan to intercept a single stream input source and convey it to the river.
The Allegheny County Sanitary Authority (ALCOSAN) is committed to reducing extraneous sources of stormwater that enter their interceptor system and subsequently are conveyed to the treatment plant. The entry of large quantities of stormwater contributes to combined sewer overflows (CSO's), hydraulic overloading, sediment buildup and increased treatment costs. One major source of stormwater inflow...
Author(s)
David W. TroianosBradley G. DudaJan Oliver
SourceProceedings of the Water Environment Federation
SubjectSession 10: The Next Step of CSO Management
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:5L.752;1-
DOI10.2175/193864708788812947
Volume / Issue2008 / 5
Content sourceCollection Systems Conference
First / last page(s)752 - 765
Copyright2008
Word count464

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2026 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
David W. Troianos# Bradley G. Duda# Jan Oliver. ALCOSAN – Ravine Street Stream Removal Program. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 2 Apr. 2026. <https://www.accesswater.org?id=-295678CITANCHOR>.
David W. Troianos# Bradley G. Duda# Jan Oliver. ALCOSAN – Ravine Street Stream Removal Program. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed April 2, 2026. https://www.accesswater.org/?id=-295678CITANCHOR.
David W. Troianos# Bradley G. Duda# Jan Oliver
ALCOSAN – Ravine Street Stream Removal Program
Access Water
Water Environment Federation
December 22, 2018
April 2, 2026
https://www.accesswater.org/?id=-295678CITANCHOR