lastID = -297192
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
20-Day Design Build to Save $50 Million Worth of Equipment
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 13:05:07 Adam Phillips
  • 2022-05-06 13:05:06 Adam Phillips
  • 2020-01-31 18:44:47 Administrator
  • 2020-01-31 18:44:46 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
20-Day Design Build to Save $50 Million Worth of Equipment

20-Day Design Build to Save $50 Million Worth of Equipment

20-Day Design Build to Save $50 Million Worth of Equipment

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
20-Day Design Build to Save $50 Million Worth of Equipment
Abstract
To prevent the flooding and loss of 50 million worth of equipment in an underground nickel mine, a new effluent water treatment plant (EWTP) was design, procured, built, and commissioned in 20-days. The mine's interim tailings storage facility which was storing the dewatering water was full, and the mine was unable to meet its discharge permit without the construction of the EWTP. The EWTP targeted the removal of total suspended solids, radium, ammonia, and total dissolved solids from the water stored in the interim tailings storage facility. It was designed as an integrated membrane filtration plant with microfiltration and reverse osmosis membrane systems. Through great team work from the mine staff, the design engineer, contractors, and equipment suppliers, the EWTP was completed and met permit limits within the extremely tight timeline.
To prevent the flooding and loss of 50 million worth of equipment in an underground nickel mine, a new effluent water treatment plant (EWTP) was design, procured, built, and commissioned in 20-days. The mine's interim tailings storage facility which was storing the dewatering water was full, and the mine was unable to meet its discharge permit without the construction of the EWTP. The EWTP...
Author(s)
Steve J. TamburiniSamuel J. Billin
SourceProceedings of the Water Environment Federation
SubjectSession 79: Advances in Physical-Chemical Treatment of Industrial Wastewater
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2010
ISSN1938-6478
SICI1938-6478(20100101)2010:11L.5752;1-
DOI10.2175/193864710798193626
Volume / Issue2010 / 11
Content sourceWEFTEC
First / last page(s)5752 - 5763
Copyright2010
Word count141
Subject keywordsDesign buildmicrofiltrationreverse osmosismine dewatering treatment

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to '20-Day Design Build to Save $50 Million Worth of Equipment'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
20-Day Design Build to Save $50 Million Worth of Equipment
Pricing
Non-member price: $11.50
Member price:
-297192
Get access
-297192
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to '20-Day Design Build to Save $50 Million Worth of Equipment'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
20-Day Design Build to Save $50 Million Worth of Equipment
Abstract
To prevent the flooding and loss of 50 million worth of equipment in an underground nickel mine, a new effluent water treatment plant (EWTP) was design, procured, built, and commissioned in 20-days. The mine's interim tailings storage facility which was storing the dewatering water was full, and the mine was unable to meet its discharge permit without the construction of the EWTP. The EWTP targeted the removal of total suspended solids, radium, ammonia, and total dissolved solids from the water stored in the interim tailings storage facility. It was designed as an integrated membrane filtration plant with microfiltration and reverse osmosis membrane systems. Through great team work from the mine staff, the design engineer, contractors, and equipment suppliers, the EWTP was completed and met permit limits within the extremely tight timeline.
To prevent the flooding and loss of 50 million worth of equipment in an underground nickel mine, a new effluent water treatment plant (EWTP) was design, procured, built, and commissioned in 20-days. The mine's interim tailings storage facility which was storing the dewatering water was full, and the mine was unable to meet its discharge permit without the construction of the EWTP. The EWTP...
Author(s)
Steve J. TamburiniSamuel J. Billin
SourceProceedings of the Water Environment Federation
SubjectSession 79: Advances in Physical-Chemical Treatment of Industrial Wastewater
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2010
ISSN1938-6478
SICI1938-6478(20100101)2010:11L.5752;1-
DOI10.2175/193864710798193626
Volume / Issue2010 / 11
Content sourceWEFTEC
First / last page(s)5752 - 5763
Copyright2010
Word count141
Subject keywordsDesign buildmicrofiltrationreverse osmosismine dewatering treatment

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Steve J. Tamburini# Samuel J. Billin. 20-Day Design Build to Save $50 Million Worth of Equipment. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 30 Jun. 2025. <https://www.accesswater.org?id=-297192CITANCHOR>.
Steve J. Tamburini# Samuel J. Billin. 20-Day Design Build to Save $50 Million Worth of Equipment. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 30, 2025. https://www.accesswater.org/?id=-297192CITANCHOR.
Steve J. Tamburini# Samuel J. Billin
20-Day Design Build to Save $50 Million Worth of Equipment
Access Water
Water Environment Federation
December 22, 2018
June 30, 2025
https://www.accesswater.org/?id=-297192CITANCHOR