lastID = -277847
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Loading icon
Description: Access Water
Context Menu
Description: Fully Structural Renewal of 39-inch PCCP Water Transmission Main with...
Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining™ and HDPE
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-02-23 14:08:58 Adam Phillips
  • 2020-02-23 14:08:57 Adam Phillips
  • 2020-01-31 23:25:14 Administrator
  • 2020-01-31 23:25:13 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Fully Structural Renewal of 39-inch PCCP Water Transmission Main with...
Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining™ and HDPE

Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining™ and HDPE

Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining™ and HDPE

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Fully Structural Renewal of 39-inch PCCP Water Transmission Main with...
Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining™ and HDPE
Abstract
Gulf Coast Water Authority (GCWA) and the City of League City, Texas were faced with the need to renew a critical 39-inch PCCP water transmission main. The 39-inch PCCP water main, owned by GCWA and operated by League City, required replacement of approximately 6,800 feet along Calder Road.ARKK Engineers, a Houston based consulting firm, evaluated numerous rehabilitation and replacement methods in which Swagelining™ was selected.This paper will outline the design phase and selection process as traditional slip lining was considered including an alternate for a compressive tight fitting HDPE pipe. The design criteria required a fully structural solution capable of 125 psi operating pressure. The Swagelining™ process was selected over slip lining due to the additional flow capacity and the contract was awarded to Murphy Pipeline Contractors.This paper will also outline the construction phase, including the Swagelining™ process, the pipe installations performed by Murphy Pipelines, and the challenges associated with the installation of a 1000mm (39.4 inch OD) DR 17 HDPE pipe. The 2.32-inch wall thickness pipe was pulled through a single swage die in four pulls ranging from 1,250 feet to 2,100 feet in length.The Calder Road Project represents the largest diameter, fully structural pipe installed to date in North America utilizing the Swagelining™ technology. The utilization of this technology with HDPE pipe allowed the owner to meet all design parameters and increase the flow capacity. Swagelining™ offers a solution for pressure pipe renewal that is unique in today’s trenchless pressure pipe market as it meets both internal and external loading requirements.
Gulf Coast Water Authority (GCWA) and the City of League City, Texas were faced with the need to renew a critical 39-inch PCCP water transmission main. The 39-inch PCCP water main, owned by GCWA and operated by League City, required replacement of approximately 6,800 feet along Calder Road.
Author(s)
Todd GrafenauerTom Hayes
SourceProceedings of the Water Environment Federation
SubjectResearch Article
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2015
ISSN1938-6478
DOI10.2175/193864715819541387
Volume / Issue2015 / 12
Content sourceWEFTEC
Copyright2015
Word count270

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining™ and HDPE'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Fully Structural Renewal of 39-inch PCCP Water Transmission Main with...
Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining™ and HDPE
Pricing
Non-member price: $11.50
Member price:
-277847
Get access
-277847
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining™ and HDPE'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Fully Structural Renewal of 39-inch PCCP Water Transmission Main with...
Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining™ and HDPE
Abstract
Gulf Coast Water Authority (GCWA) and the City of League City, Texas were faced with the need to renew a critical 39-inch PCCP water transmission main. The 39-inch PCCP water main, owned by GCWA and operated by League City, required replacement of approximately 6,800 feet along Calder Road.ARKK Engineers, a Houston based consulting firm, evaluated numerous rehabilitation and replacement methods in which Swagelining™ was selected.This paper will outline the design phase and selection process as traditional slip lining was considered including an alternate for a compressive tight fitting HDPE pipe. The design criteria required a fully structural solution capable of 125 psi operating pressure. The Swagelining™ process was selected over slip lining due to the additional flow capacity and the contract was awarded to Murphy Pipeline Contractors.This paper will also outline the construction phase, including the Swagelining™ process, the pipe installations performed by Murphy Pipelines, and the challenges associated with the installation of a 1000mm (39.4 inch OD) DR 17 HDPE pipe. The 2.32-inch wall thickness pipe was pulled through a single swage die in four pulls ranging from 1,250 feet to 2,100 feet in length.The Calder Road Project represents the largest diameter, fully structural pipe installed to date in North America utilizing the Swagelining™ technology. The utilization of this technology with HDPE pipe allowed the owner to meet all design parameters and increase the flow capacity. Swagelining™ offers a solution for pressure pipe renewal that is unique in today’s trenchless pressure pipe market as it meets both internal and external loading requirements.
Gulf Coast Water Authority (GCWA) and the City of League City, Texas were faced with the need to renew a critical 39-inch PCCP water transmission main. The 39-inch PCCP water main, owned by GCWA and operated by League City, required replacement of approximately 6,800 feet along Calder Road.
Author(s)
Todd GrafenauerTom Hayes
SourceProceedings of the Water Environment Federation
SubjectResearch Article
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2015
ISSN1938-6478
DOI10.2175/193864715819541387
Volume / Issue2015 / 12
Content sourceWEFTEC
Copyright2015
Word count270

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2026 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Todd Grafenauer# Tom Hayes. Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining™ and HDPE. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 2 Apr. 2026. <https://www.accesswater.org?id=-277847CITANCHOR>.
Todd Grafenauer# Tom Hayes. Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining™ and HDPE. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed April 2, 2026. https://www.accesswater.org/?id=-277847CITANCHOR.
Todd Grafenauer# Tom Hayes
Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining™ and HDPE
Access Water
Water Environment Federation
December 22, 2018
April 2, 2026
https://www.accesswater.org/?id=-277847CITANCHOR