lastID = -279735
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Loading icon
Description: Access Water
Context Menu
Description: A Trenchless Approach to Lift Station Elimination
A Trenchless Approach to Lift Station Elimination
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 20:13:43 Adam Phillips
  • 2022-05-04 20:13:42 Adam Phillips
  • 2020-03-30 22:59:59 Adam Phillips
  • 2020-03-30 22:59:58 Adam Phillips
  • 2020-03-27 15:41:20 Katherine Saltzman
  • 2020-03-27 15:41:19 Katherine Saltzman
  • 2020-03-26 22:42:03 Adam Phillips
  • 2020-03-26 22:42:02 Adam Phillips
  • 2020-02-23 13:18:29 Adam Phillips
  • 2020-01-31 19:05:11 Administrator
  • 2020-01-31 19:05:10 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: A Trenchless Approach to Lift Station Elimination
A Trenchless Approach to Lift Station Elimination

A Trenchless Approach to Lift Station Elimination

A Trenchless Approach to Lift Station Elimination

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: A Trenchless Approach to Lift Station Elimination
A Trenchless Approach to Lift Station Elimination
Abstract
Initially in 2004, the City of Garland, Texas, approached Freese and Nichols, Inc. (FNI), about decommissioning a small lift station that was becoming a maintenance problem for the City staff. The City did not want to expend effort or funds into rehabilitating or replacing the lift station; it has preferred to eliminate lift stations, if possible, throughout the City. FNI conducted a study of the lift station service area, the gravity collection system in proximity of the lift station, and the topography of the immediate area surrounding the lift station site. The results of the study determined that it would require trench cuts in excess of 50-feet to install a gravity line by opencut methods to the downstream system, and at the time the trenchless technology was not advanced enough to install a gravity wastewater line at grade for the lengths required for connecting to the existing collection system. FNI recommended to rehabilitate or replace the lift station due to the excessive expense and risk involved in attempting to run a new gravity line to eliminate the lift station. The City opted to wait, and attempted to maintain the existing lift station.Fast forward to 2014. The City of Garland contacted FNI to reinvestigate the same lift station and collection system. After 10 more years of use and maintenance, the lift station was even more of a problem for the City maintenance staff. FNI reviewed the 2004 study and determined that improvements in trenchless technology capabilities made it feasible to install a new gravity line at grade. The new line would enable the City to eliminate the lift station and connect the existing collection system to the service area of the existing lift station. This project would require over 3,500 feet of pipe to be installed by trenchless methods on a grade of approximately 0.01 ft./ft. grade. The project was successfully installed and was put in service in the Spring of 2016 as designed.Now that trenchless technologies are making it more feasible to eliminate lift stations, this paper will give utility owners a greater understanding of what trenchless installation entails and what to consider when making that decision. The paper will show the audience how the City of Garland team researched, designed and constructed the project. It will describe the installation options that the project team explored, the precautions they took during design, and the measures they implemented to minimize risks. The paper will also discuss construction issues and challenges that trenchless projects may encounter, as well as lessons learned and other guidance for utility owners.
Initially in 2004, the City of Garland, Texas, approached Freese and Nichols, Inc. (FNI), about decommissioning a small lift station that was becoming a maintenance problem for the City staff. The City did not want to expend effort or funds into rehabilitating or replacing the lift station; it has preferred to eliminate lift stations, if possible, throughout the City. FNI conducted a study of the...
Author(s)
Scott MaughnDaniel HuffinesLindy Higginbotham
SourceProceedings of the Water Environment Federation
SubjectResearch Article
Document typeConference Paper
PublisherWater Environment Federation
Print publication date May, 2017
ISSN1938-6478
DOI10.2175/193864717821494907
Volume / Issue2017 / 2
Content sourceCollection Systems Conference
Copyright2017
Word count434

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'A Trenchless Approach to Lift Station Elimination'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: A Trenchless Approach to Lift Station Elimination
A Trenchless Approach to Lift Station Elimination
Pricing
Non-member price: $11.50
Member price:
-279735
Get access
-279735
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'A Trenchless Approach to Lift Station Elimination'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: A Trenchless Approach to Lift Station Elimination
A Trenchless Approach to Lift Station Elimination
Abstract
Initially in 2004, the City of Garland, Texas, approached Freese and Nichols, Inc. (FNI), about decommissioning a small lift station that was becoming a maintenance problem for the City staff. The City did not want to expend effort or funds into rehabilitating or replacing the lift station; it has preferred to eliminate lift stations, if possible, throughout the City. FNI conducted a study of the lift station service area, the gravity collection system in proximity of the lift station, and the topography of the immediate area surrounding the lift station site. The results of the study determined that it would require trench cuts in excess of 50-feet to install a gravity line by opencut methods to the downstream system, and at the time the trenchless technology was not advanced enough to install a gravity wastewater line at grade for the lengths required for connecting to the existing collection system. FNI recommended to rehabilitate or replace the lift station due to the excessive expense and risk involved in attempting to run a new gravity line to eliminate the lift station. The City opted to wait, and attempted to maintain the existing lift station.Fast forward to 2014. The City of Garland contacted FNI to reinvestigate the same lift station and collection system. After 10 more years of use and maintenance, the lift station was even more of a problem for the City maintenance staff. FNI reviewed the 2004 study and determined that improvements in trenchless technology capabilities made it feasible to install a new gravity line at grade. The new line would enable the City to eliminate the lift station and connect the existing collection system to the service area of the existing lift station. This project would require over 3,500 feet of pipe to be installed by trenchless methods on a grade of approximately 0.01 ft./ft. grade. The project was successfully installed and was put in service in the Spring of 2016 as designed.Now that trenchless technologies are making it more feasible to eliminate lift stations, this paper will give utility owners a greater understanding of what trenchless installation entails and what to consider when making that decision. The paper will show the audience how the City of Garland team researched, designed and constructed the project. It will describe the installation options that the project team explored, the precautions they took during design, and the measures they implemented to minimize risks. The paper will also discuss construction issues and challenges that trenchless projects may encounter, as well as lessons learned and other guidance for utility owners.
Initially in 2004, the City of Garland, Texas, approached Freese and Nichols, Inc. (FNI), about decommissioning a small lift station that was becoming a maintenance problem for the City staff. The City did not want to expend effort or funds into rehabilitating or replacing the lift station; it has preferred to eliminate lift stations, if possible, throughout the City. FNI conducted a study of the...
Author(s)
Scott MaughnDaniel HuffinesLindy Higginbotham
SourceProceedings of the Water Environment Federation
SubjectResearch Article
Document typeConference Paper
PublisherWater Environment Federation
Print publication date May, 2017
ISSN1938-6478
DOI10.2175/193864717821494907
Volume / Issue2017 / 2
Content sourceCollection Systems Conference
Copyright2017
Word count434

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2026 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Scott Maughn# Daniel Huffines# Lindy Higginbotham. A Trenchless Approach to Lift Station Elimination. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 21 Apr. 2026. <https://www.accesswater.org?id=-279735CITANCHOR>.
Scott Maughn# Daniel Huffines# Lindy Higginbotham. A Trenchless Approach to Lift Station Elimination. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed April 21, 2026. https://www.accesswater.org/?id=-279735CITANCHOR.
Scott Maughn# Daniel Huffines# Lindy Higginbotham
A Trenchless Approach to Lift Station Elimination
Access Water
Water Environment Federation
December 22, 2018
April 21, 2026
https://www.accesswater.org/?id=-279735CITANCHOR