lastID = -287430
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Loading icon
Description: Access Water
Context Menu
Description: Book cover
DETERMINATION OF THE IMPACT OF REHABILITATION OF DIFFERENT COMPONENTS OF THE SEWER SYSTEM ON I/I REDUCTION
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:20:32 Adam Phillips
  • 2022-05-04 21:20:31 Adam Phillips
  • 2020-03-26 22:19:24 Adam Phillips
  • 2020-03-26 22:19:23 Adam Phillips
  • 2020-01-31 21:50:27 Administrator
  • 2020-01-31 21:50:26 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
DETERMINATION OF THE IMPACT OF REHABILITATION OF DIFFERENT COMPONENTS OF THE SEWER SYSTEM ON I/I REDUCTION

DETERMINATION OF THE IMPACT OF REHABILITATION OF DIFFERENT COMPONENTS OF THE SEWER SYSTEM ON I/I REDUCTION

DETERMINATION OF THE IMPACT OF REHABILITATION OF DIFFERENT COMPONENTS OF THE SEWER SYSTEM ON I/I REDUCTION

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
DETERMINATION OF THE IMPACT OF REHABILITATION OF DIFFERENT COMPONENTS OF THE SEWER SYSTEM ON I/I REDUCTION
Abstract
The LOTT Wastewater Partnership is undertaking a program to reduce infiltration/inflow in the tributary area of the Partnership's wastewater treatment plant in Olympia, Washington. The purposes of this program are to both reduce peak flows to avoid overflows in the conveyance system, and to reduce flows at the treatment plant to delay capacity upgrades.Rehabilitation of two basins in the City of Olympia offered the opportunity to determine the relative effectiveness of rehabilitating different components of the sewer system. Conflicting information suggests that effective reduction in I/I requires that private building sewers in a basin be rehabilitated—usually an unattractive option due to the difficulties of working on private property. In order to determine the relative effectiveness of rehabilitating public sewers within the public right-of-way and/or private building sewers, demonstration projects were initiated in these two basins. These demonstration projects included the following approaches:Rehabilitation of the public sewers and the portion of the building sewers within the public right-of-way (the lower laterals).After monitoring of flows to determine effectiveness of the above approach, selected upper laterals (building sewer from the property line to the building) in the same basin were replaced. Upper laterals were selected based on smoke testing results and mini-cam surveys made during the earlier work.Rehabilitation of only the upper building laterals in a different basin.These demonstration projects allow direct comparison of the effectiveness of rehabilitation of the upper lateral vs. the public sewer and lower laterals. In addition, the total removal that can be achieved when the entire system is rehabilitated is available.Using the techniques described in the paper, it was found that the first treatment (rehabilitation of sewers in the public right-of-way) reduced annual I/I volumes by 80 percent, but reduced peak hourly flows expected once in 10 years by only 17 percent. The presentation discusses the construction projects, the analysis techniques, results and costs for each treatment option.
The LOTT Wastewater Partnership is undertaking a program to reduce infiltration/inflow in the tributary area of the Partnership's wastewater treatment plant in Olympia, Washington. The purposes of this program are to both reduce peak flows to avoid overflows in the conveyance system, and to reduce flows at the treatment plant to delay capacity upgrades.Rehabilitation of two basins in the City of...
Author(s)
M. Steve MerrillMatt DavisAndy LukasBrian Topolski
SourceProceedings of the Water Environment Federation
SubjectSession 6 - SSO Issues
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2000
ISSN1938-6478
SICI1938-6478(20000101)2000:4L.250;1-
DOI10.2175/193864700785140962
Volume / Issue2000 / 4
Content sourceCollection Systems Conference
First / last page(s)250 - 269
Copyright2000
Word count331

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'DETERMINATION OF THE IMPACT OF REHABILITATION OF DIFFERENT COMPONENTS OF THE SEWER SYSTEM ON I/I REDUCTION'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
DETERMINATION OF THE IMPACT OF REHABILITATION OF DIFFERENT COMPONENTS OF THE SEWER SYSTEM ON I/I REDUCTION
Pricing
Non-member price: $11.50
Member price:
-287430
Get access
-287430
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'DETERMINATION OF THE IMPACT OF REHABILITATION OF DIFFERENT COMPONENTS OF THE SEWER SYSTEM ON I/I REDUCTION'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
DETERMINATION OF THE IMPACT OF REHABILITATION OF DIFFERENT COMPONENTS OF THE SEWER SYSTEM ON I/I REDUCTION
Abstract
The LOTT Wastewater Partnership is undertaking a program to reduce infiltration/inflow in the tributary area of the Partnership's wastewater treatment plant in Olympia, Washington. The purposes of this program are to both reduce peak flows to avoid overflows in the conveyance system, and to reduce flows at the treatment plant to delay capacity upgrades.Rehabilitation of two basins in the City of Olympia offered the opportunity to determine the relative effectiveness of rehabilitating different components of the sewer system. Conflicting information suggests that effective reduction in I/I requires that private building sewers in a basin be rehabilitated—usually an unattractive option due to the difficulties of working on private property. In order to determine the relative effectiveness of rehabilitating public sewers within the public right-of-way and/or private building sewers, demonstration projects were initiated in these two basins. These demonstration projects included the following approaches:Rehabilitation of the public sewers and the portion of the building sewers within the public right-of-way (the lower laterals).After monitoring of flows to determine effectiveness of the above approach, selected upper laterals (building sewer from the property line to the building) in the same basin were replaced. Upper laterals were selected based on smoke testing results and mini-cam surveys made during the earlier work.Rehabilitation of only the upper building laterals in a different basin.These demonstration projects allow direct comparison of the effectiveness of rehabilitation of the upper lateral vs. the public sewer and lower laterals. In addition, the total removal that can be achieved when the entire system is rehabilitated is available.Using the techniques described in the paper, it was found that the first treatment (rehabilitation of sewers in the public right-of-way) reduced annual I/I volumes by 80 percent, but reduced peak hourly flows expected once in 10 years by only 17 percent. The presentation discusses the construction projects, the analysis techniques, results and costs for each treatment option.
The LOTT Wastewater Partnership is undertaking a program to reduce infiltration/inflow in the tributary area of the Partnership's wastewater treatment plant in Olympia, Washington. The purposes of this program are to both reduce peak flows to avoid overflows in the conveyance system, and to reduce flows at the treatment plant to delay capacity upgrades.Rehabilitation of two basins in the City of...
Author(s)
M. Steve MerrillMatt DavisAndy LukasBrian Topolski
SourceProceedings of the Water Environment Federation
SubjectSession 6 - SSO Issues
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2000
ISSN1938-6478
SICI1938-6478(20000101)2000:4L.250;1-
DOI10.2175/193864700785140962
Volume / Issue2000 / 4
Content sourceCollection Systems Conference
First / last page(s)250 - 269
Copyright2000
Word count331

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2025 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
M. Steve Merrill# Matt Davis# Andy Lukas# Brian Topolski. DETERMINATION OF THE IMPACT OF REHABILITATION OF DIFFERENT COMPONENTS OF THE SEWER SYSTEM ON I/I REDUCTION. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 28 Jan. 2026. <https://www.accesswater.org?id=-287430CITANCHOR>.
M. Steve Merrill# Matt Davis# Andy Lukas# Brian Topolski. DETERMINATION OF THE IMPACT OF REHABILITATION OF DIFFERENT COMPONENTS OF THE SEWER SYSTEM ON I/I REDUCTION. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed January 28, 2026. https://www.accesswater.org/?id=-287430CITANCHOR.
M. Steve Merrill# Matt Davis# Andy Lukas# Brian Topolski
DETERMINATION OF THE IMPACT OF REHABILITATION OF DIFFERENT COMPONENTS OF THE SEWER SYSTEM ON I/I REDUCTION
Access Water
Water Environment Federation
December 22, 2018
January 28, 2026
https://www.accesswater.org/?id=-287430CITANCHOR