lastID = -295668
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Loading icon
Description: Access Water
Context Menu
Description: Book cover
ALCOSAN Overflow Control Facility Full-Scale Demonstration Project
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 20:14:39 Adam Phillips
  • 2022-05-04 20:14:38 Adam Phillips
  • 2020-03-26 22:09:18 Adam Phillips
  • 2020-03-26 22:09:17 Adam Phillips
  • 2020-01-31 19:25:42 Administrator
  • 2020-01-31 19:25:41 Administrator
  • 2020-01-31 19:25:40 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
ALCOSAN Overflow Control Facility Full-Scale Demonstration Project

ALCOSAN Overflow Control Facility Full-Scale Demonstration Project

ALCOSAN Overflow Control Facility Full-Scale Demonstration Project

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
ALCOSAN Overflow Control Facility Full-Scale Demonstration Project
Abstract
The Allegheny County Sanitary Authority (ALCOSAN) provides wastewater collection and treatment for the Greater Pittsburgh area. ALCOSAN owns and operates about 90 miles of interceptors that convey sewage from combined and separate sewer systems that are owned and operated by surrounding municipalities. Collected flows are treated at ALCOSAN's wastewater treatment plant (WWTP) located on Pittsburgh's north side. Over 300 regulator structures provide relief of the collection system during periods of wet weather, when flows tributary to the system exceed the conveyance and treatment capacity. Excess flow is discharged via CSO and SSO structures to three major rivers and their tributaries.In April 1999, ALCOSAN completed preparation of a wet weather concept plan as a step towards compliance with the National CSO Control Policy. In June 2007, ALCOSAN completed negotiation of a federal Consent Decree which sets forth a series of planning, design, and construction requirements which must be completed in accordance with an extensive schedule of interim milestones. The Consent Decree was officially entered into court on January 23, 2008. In anticipation of these consent decree requirements, ALCOSAN began the implementation of a full-scale demonstration project involving two end-of-pipe CSO treatment facilities in November, 2005. The information gained from implementation and demonstration testing of these two facilities, which are consistent with the CSO control approach established in the April 1999 wet weather concept plan, is intended to help to shape the planning and implementation of region-wide CSO controls under the Consent Decree.The process of selecting an appropriate overflow control technology for both demonstration projects followed a detailed and objective planning process. A total of six technology options were sized and developed as part of the process of evaluating and comparing alternatives. Each technology was sized for a range of peak flow rate and/or overflow volume corresponding to zero, one, two, four, or seven untreated overflows in an average rainfall year.This paper presents the process followed to size, develop, evaluate, and compare each site, technology, and sizing option considered for both the Allegheny and Monongahela River overflow control facility demonstration projects. The process starts with model development, then proceeds to the field sampling program, development of alternatives and evaluation of alternatives. The paper concludes with current project status and lessons learned.
The Allegheny County Sanitary Authority (ALCOSAN) provides wastewater collection and treatment for the Greater Pittsburgh area. ALCOSAN owns and operates about 90 miles of interceptors that convey sewage from combined and separate sewer systems that are owned and operated by surrounding municipalities. Collected flows are treated at ALCOSAN's wastewater treatment plant (WWTP) located on...
Author(s)
Gregory R. HeathJames R. BowserDaniel Lockard
SourceProceedings of the Water Environment Federation
SubjectSession 8: Examining the Pittsburgh Area Under a Microscope
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:5L.598;1-
DOI10.2175/193864708788812424
Volume / Issue2008 / 5
Content sourceCollection Systems Conference
First / last page(s)598 - 624
Copyright2008
Word count376

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'ALCOSAN Overflow Control Facility Full-Scale Demonstration Project'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
ALCOSAN Overflow Control Facility Full-Scale Demonstration Project
Pricing
Non-member price: $11.50
Member price:
-295668
Get access
-295668
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'ALCOSAN Overflow Control Facility Full-Scale Demonstration Project'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
ALCOSAN Overflow Control Facility Full-Scale Demonstration Project
Abstract
The Allegheny County Sanitary Authority (ALCOSAN) provides wastewater collection and treatment for the Greater Pittsburgh area. ALCOSAN owns and operates about 90 miles of interceptors that convey sewage from combined and separate sewer systems that are owned and operated by surrounding municipalities. Collected flows are treated at ALCOSAN's wastewater treatment plant (WWTP) located on Pittsburgh's north side. Over 300 regulator structures provide relief of the collection system during periods of wet weather, when flows tributary to the system exceed the conveyance and treatment capacity. Excess flow is discharged via CSO and SSO structures to three major rivers and their tributaries.In April 1999, ALCOSAN completed preparation of a wet weather concept plan as a step towards compliance with the National CSO Control Policy. In June 2007, ALCOSAN completed negotiation of a federal Consent Decree which sets forth a series of planning, design, and construction requirements which must be completed in accordance with an extensive schedule of interim milestones. The Consent Decree was officially entered into court on January 23, 2008. In anticipation of these consent decree requirements, ALCOSAN began the implementation of a full-scale demonstration project involving two end-of-pipe CSO treatment facilities in November, 2005. The information gained from implementation and demonstration testing of these two facilities, which are consistent with the CSO control approach established in the April 1999 wet weather concept plan, is intended to help to shape the planning and implementation of region-wide CSO controls under the Consent Decree.The process of selecting an appropriate overflow control technology for both demonstration projects followed a detailed and objective planning process. A total of six technology options were sized and developed as part of the process of evaluating and comparing alternatives. Each technology was sized for a range of peak flow rate and/or overflow volume corresponding to zero, one, two, four, or seven untreated overflows in an average rainfall year.This paper presents the process followed to size, develop, evaluate, and compare each site, technology, and sizing option considered for both the Allegheny and Monongahela River overflow control facility demonstration projects. The process starts with model development, then proceeds to the field sampling program, development of alternatives and evaluation of alternatives. The paper concludes with current project status and lessons learned.
The Allegheny County Sanitary Authority (ALCOSAN) provides wastewater collection and treatment for the Greater Pittsburgh area. ALCOSAN owns and operates about 90 miles of interceptors that convey sewage from combined and separate sewer systems that are owned and operated by surrounding municipalities. Collected flows are treated at ALCOSAN's wastewater treatment plant (WWTP) located on...
Author(s)
Gregory R. HeathJames R. BowserDaniel Lockard
SourceProceedings of the Water Environment Federation
SubjectSession 8: Examining the Pittsburgh Area Under a Microscope
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:5L.598;1-
DOI10.2175/193864708788812424
Volume / Issue2008 / 5
Content sourceCollection Systems Conference
First / last page(s)598 - 624
Copyright2008
Word count376

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2026 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Gregory R. Heath# James R. Bowser# Daniel Lockard. ALCOSAN Overflow Control Facility Full-Scale Demonstration Project. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 2 Apr. 2026. <https://www.accesswater.org?id=-295668CITANCHOR>.
Gregory R. Heath# James R. Bowser# Daniel Lockard. ALCOSAN Overflow Control Facility Full-Scale Demonstration Project. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed April 2, 2026. https://www.accesswater.org/?id=-295668CITANCHOR.
Gregory R. Heath# James R. Bowser# Daniel Lockard
ALCOSAN Overflow Control Facility Full-Scale Demonstration Project
Access Water
Water Environment Federation
December 22, 2018
April 2, 2026
https://www.accesswater.org/?id=-295668CITANCHOR