Access Water | Reimagining Dugway Brook through Community-Driven Solutions
lastID = -10117287
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: CSSW25 proceedings
Reimagining Dugway Brook through Community-Driven Solutions
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2025-07-14 05:48:16 Adam Phillips Continuous release
  • 2025-07-10 16:35:10 Adam Phillips
  • 2025-07-10 10:17:50 Adam Phillips
  • 2025-07-10 07:11:04 Adam Phillips
  • 2025-07-09 16:12:12 Adam Phillips
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: CSSW25 proceedings
Reimagining Dugway Brook through Community-Driven Solutions

Reimagining Dugway Brook through Community-Driven Solutions

Reimagining Dugway Brook through Community-Driven Solutions

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: CSSW25 proceedings
Reimagining Dugway Brook through Community-Driven Solutions
Abstract
The Dugway Brook stream restoration study set out to determine the feasibility of creating habitat and reducing flooding in the Glenville neighborhood of Cleveland. The study focused on creating conceptual designs for resilient stormwater infrastructure, using nature-based solutions that reflected the desires of the community. Engaging the Glenville community was a cornerstone of the feasibility study, as the focus area was Glenview Park, centrally located within the neighborhood and heavily trafficked by residents of all ages. Collaboration with residents and stakeholders was essential to understand the community's identity and needs. Engagement events intended to foster a sense of ownership by community members and ensured that solutions reflected their aspirations. The Glenville neighborhood is a historically disadvantaged area, and it is no secret that underserved communities bear the burden of insufficient and outdated infrastructure. The project aimed to use habitat creation and improved flood conditions to address the disproportionate impacts of stormwater issues on underserved communities. Equitable stormwater solutions proposed in the study included: - Nature-Based Approaches: The project incorporated nature-based solutions, such as stream restoration, wetland creation, and green infrastructure to manage stormwater in a sustainable and equitable manner, while promoting habitat creation in an urban area. - Inclusive Design: The project design reflects the input received from various community groups, ensuring that the final proposed plans meet the diverse needs of the residents and reflect the community's identity. - Accessibility: Enhancements to Glenview Park, such as improved walkways, seating, signage, and lighting, are designed to be accessible to residents of all ages, including those with disabilities. Two alternatives were studied to determine their feasibility technically (to create habitat and reduce stormwater flooding), financially, (can they be afforded and funded), and socially (meeting the community's needs). Proposed solutions were vetted to ensure that the proposed elements benefit the community, including: - Habitat Creation: The improvements will create new habitats for wildlife, enhancing biodiversity and ecological health. - Flood Risk Reduction: The project aims to reduce flood risk in the Glenville neighborhood, which has historically been impacted by flooding during wet weather events. - Enhanced Public Spaces: The improvements to Glenview Park will provide residents with a safer, more enjoyable, and more accessible public space. - Community Resilience: The project fosters a true sense of ownership and promotes community resilience. Purpose This presentation will share our approach to community engagement in a feasibility study, discussing strategies implemented, themes revealed, how solutions can reflect a community, and challenges and lessons learned throughout the process. Various engagement strategies were executed to promote partnership with the public: - Workshops and Dialogues: Workshops and dialogues were conducted with various community groups, including students, senior citizens, park users, and residents. Sessions were approached through a two-way lens: to educate residents about their local infrastructure and to hear their insights, concerns, and desires. Partnerships with local council people were leveraged to diversify the information sharing approach, utilizing newsletters, emails, and web pages. - Onsite Engagement: Project team members engaged directly with residents in Glenview Park to discuss the study and gather real-time feedback. These conversations were not pre-planned and were meant to foster more organic conversations with regular park users. - Public Meetings: Public meetings were held to present the proposed plans and gather additional feedback. These served as a forum for addressing concerns and discussing the project's benefits. Meetings were coordinated with project partners, like community development corporations (CDCs), council people, and the local utility to maximize community gatherings already scheduled. - Online Survey: An online survey was used to reach a broader audience and gather feedback from residents unable to attend in-person events. Although the intention was to increase accessibility, responses were minimal. The abovementioned strategies proved more successful and engaging. The community engagement efforts revealed several themes: - The need for basic amenities, like restrooms, lighting, benches, trees, trash receptacles, and additional walking paths. - A desire for the park to reflect the community's identity and promote equitable access & prioritizing the creation of a dedicated sports field for junior football. - An interest in restoring Dugway Brook and creating stream and wetland features & provided the enhancements do not occupy the entirety of the park and create opportunities for users to interact with the water and other natural assets. Benefits of this Presentation The Dugway Brook stream restoration project offers an example of how to approach community engagement to ensure equitable design of resilient infrastructure. Lessons learned and best practices will be shared with the greater water community through this presentation, including: - Scalable Solutions: The project's use of nature-based stormwater management techniques provides a model that can be scaled and adapted to other urban areas facing similar challenges. This presentation will discuss the challenge of identifying scalable solutions within a physically limited space that reflect the community. - Community Engagement Best Practices: The project's comprehensive community engagement strategy serves as a valuable case study for involving the public in infrastructure projects and ensuring that solutions are equitable and community focused. This presentation will discuss the challenges that accompanied engaging project partners, stakeholders, and residents, and best practices for ensuring participation and accountability. Status of the Study At the time of this submittal, the Feasibility Study Report and supporting conceptual designs for the Dugway Brook stream restoration project have been completed. Community and stakeholder keenness, as well as funding procurement, will drive the decision to move the study forward to a detailed design. Concluding Thoughts The Dugway Brook stream restoration project provides a model for how community engagement can drive the successful planning and future implementation of resilient and equitable stormwater solutions. This study was successful not only because of identifying technically feasible stormwater solutions in Glenview Park, but also because those solutions reflected the voices of the community. This approach to infrastructure design creates more resilient and equitable communities, where access to quality infrastructure is prioritized and community identity is reflected. This presentation will provide valuable insight and best practices for the water industry, highlighting the importance of inclusive and sustainable infrastructure development that creates a future of equitable communities.
This paper was presented at the WEF/WEAT Collection Systems and Stormwater Conference, July 15-18, 2025.
Presentation time
11:15:00
11:45:00
Session time
08:30:00
11:45:00
SessionEngaging Communities for Smarter Water Management
Session number11
Session locationGeorge R. Brown Convention Center, Houston, Texas, USA
TopicCommunity Engagement, Equity, Stream Assessment/Restoration
TopicCommunity Engagement, Equity, Stream Assessment/Restoration
Author(s)
Gutz, AJ
Author(s)A. Gutz1
Author affiliation(s)Wade Trim, 1
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jul 2025
DOI10.2175/193864718825159844
Volume / Issue
Content sourceCollection Systems and Stormwater Conference
Copyright2025
Word count7

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Reimagining Dugway Brook through Community-Driven Solutions'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: CSSW25 proceedings
Reimagining Dugway Brook through Community-Driven Solutions
Pricing
Non-member price: $11.50
Member price:
-10117287
Get access
-10117287
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Reimagining Dugway Brook through Community-Driven Solutions'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: CSSW25 proceedings
Reimagining Dugway Brook through Community-Driven Solutions
Abstract
The Dugway Brook stream restoration study set out to determine the feasibility of creating habitat and reducing flooding in the Glenville neighborhood of Cleveland. The study focused on creating conceptual designs for resilient stormwater infrastructure, using nature-based solutions that reflected the desires of the community. Engaging the Glenville community was a cornerstone of the feasibility study, as the focus area was Glenview Park, centrally located within the neighborhood and heavily trafficked by residents of all ages. Collaboration with residents and stakeholders was essential to understand the community's identity and needs. Engagement events intended to foster a sense of ownership by community members and ensured that solutions reflected their aspirations. The Glenville neighborhood is a historically disadvantaged area, and it is no secret that underserved communities bear the burden of insufficient and outdated infrastructure. The project aimed to use habitat creation and improved flood conditions to address the disproportionate impacts of stormwater issues on underserved communities. Equitable stormwater solutions proposed in the study included: - Nature-Based Approaches: The project incorporated nature-based solutions, such as stream restoration, wetland creation, and green infrastructure to manage stormwater in a sustainable and equitable manner, while promoting habitat creation in an urban area. - Inclusive Design: The project design reflects the input received from various community groups, ensuring that the final proposed plans meet the diverse needs of the residents and reflect the community's identity. - Accessibility: Enhancements to Glenview Park, such as improved walkways, seating, signage, and lighting, are designed to be accessible to residents of all ages, including those with disabilities. Two alternatives were studied to determine their feasibility technically (to create habitat and reduce stormwater flooding), financially, (can they be afforded and funded), and socially (meeting the community's needs). Proposed solutions were vetted to ensure that the proposed elements benefit the community, including: - Habitat Creation: The improvements will create new habitats for wildlife, enhancing biodiversity and ecological health. - Flood Risk Reduction: The project aims to reduce flood risk in the Glenville neighborhood, which has historically been impacted by flooding during wet weather events. - Enhanced Public Spaces: The improvements to Glenview Park will provide residents with a safer, more enjoyable, and more accessible public space. - Community Resilience: The project fosters a true sense of ownership and promotes community resilience. Purpose This presentation will share our approach to community engagement in a feasibility study, discussing strategies implemented, themes revealed, how solutions can reflect a community, and challenges and lessons learned throughout the process. Various engagement strategies were executed to promote partnership with the public: - Workshops and Dialogues: Workshops and dialogues were conducted with various community groups, including students, senior citizens, park users, and residents. Sessions were approached through a two-way lens: to educate residents about their local infrastructure and to hear their insights, concerns, and desires. Partnerships with local council people were leveraged to diversify the information sharing approach, utilizing newsletters, emails, and web pages. - Onsite Engagement: Project team members engaged directly with residents in Glenview Park to discuss the study and gather real-time feedback. These conversations were not pre-planned and were meant to foster more organic conversations with regular park users. - Public Meetings: Public meetings were held to present the proposed plans and gather additional feedback. These served as a forum for addressing concerns and discussing the project's benefits. Meetings were coordinated with project partners, like community development corporations (CDCs), council people, and the local utility to maximize community gatherings already scheduled. - Online Survey: An online survey was used to reach a broader audience and gather feedback from residents unable to attend in-person events. Although the intention was to increase accessibility, responses were minimal. The abovementioned strategies proved more successful and engaging. The community engagement efforts revealed several themes: - The need for basic amenities, like restrooms, lighting, benches, trees, trash receptacles, and additional walking paths. - A desire for the park to reflect the community's identity and promote equitable access & prioritizing the creation of a dedicated sports field for junior football. - An interest in restoring Dugway Brook and creating stream and wetland features & provided the enhancements do not occupy the entirety of the park and create opportunities for users to interact with the water and other natural assets. Benefits of this Presentation The Dugway Brook stream restoration project offers an example of how to approach community engagement to ensure equitable design of resilient infrastructure. Lessons learned and best practices will be shared with the greater water community through this presentation, including: - Scalable Solutions: The project's use of nature-based stormwater management techniques provides a model that can be scaled and adapted to other urban areas facing similar challenges. This presentation will discuss the challenge of identifying scalable solutions within a physically limited space that reflect the community. - Community Engagement Best Practices: The project's comprehensive community engagement strategy serves as a valuable case study for involving the public in infrastructure projects and ensuring that solutions are equitable and community focused. This presentation will discuss the challenges that accompanied engaging project partners, stakeholders, and residents, and best practices for ensuring participation and accountability. Status of the Study At the time of this submittal, the Feasibility Study Report and supporting conceptual designs for the Dugway Brook stream restoration project have been completed. Community and stakeholder keenness, as well as funding procurement, will drive the decision to move the study forward to a detailed design. Concluding Thoughts The Dugway Brook stream restoration project provides a model for how community engagement can drive the successful planning and future implementation of resilient and equitable stormwater solutions. This study was successful not only because of identifying technically feasible stormwater solutions in Glenview Park, but also because those solutions reflected the voices of the community. This approach to infrastructure design creates more resilient and equitable communities, where access to quality infrastructure is prioritized and community identity is reflected. This presentation will provide valuable insight and best practices for the water industry, highlighting the importance of inclusive and sustainable infrastructure development that creates a future of equitable communities.
This paper was presented at the WEF/WEAT Collection Systems and Stormwater Conference, July 15-18, 2025.
Presentation time
11:15:00
11:45:00
Session time
08:30:00
11:45:00
SessionEngaging Communities for Smarter Water Management
Session number11
Session locationGeorge R. Brown Convention Center, Houston, Texas, USA
TopicCommunity Engagement, Equity, Stream Assessment/Restoration
TopicCommunity Engagement, Equity, Stream Assessment/Restoration
Author(s)
Gutz, AJ
Author(s)A. Gutz1
Author affiliation(s)Wade Trim, 1
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jul 2025
DOI10.2175/193864718825159844
Volume / Issue
Content sourceCollection Systems and Stormwater Conference
Copyright2025
Word count7

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Gutz, AJ. Reimagining Dugway Brook through Community-Driven Solutions. Water Environment Federation, 2025. Web. 16 Jul. 2025. <https://www.accesswater.org?id=-10117287CITANCHOR>.
Gutz, AJ. Reimagining Dugway Brook through Community-Driven Solutions. Water Environment Federation, 2025. Accessed July 16, 2025. https://www.accesswater.org/?id=-10117287CITANCHOR.
Gutz, AJ
Reimagining Dugway Brook through Community-Driven Solutions
Access Water
Water Environment Federation
July 17, 2025
July 16, 2025
https://www.accesswater.org/?id=-10117287CITANCHOR