lastID = -278410
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Improving the Delivery Process of Water and Wastewater Treatment Plant Public Projects through the use of IPD Principles: A Case Study
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 20:11:05 Adam Phillips
  • 2022-05-06 20:11:04 Adam Phillips
  • 2020-03-31 07:22:30 Adam Phillips
  • 2020-03-31 07:22:29 Adam Phillips
  • 2020-03-27 02:42:07 Adam Phillips
  • 2020-02-23 14:16:04 Adam Phillips
  • 2020-02-23 14:16:03 Adam Phillips
  • 2020-02-01 00:19:44 Administrator
  • 2020-02-01 00:19:43 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Improving the Delivery Process of Water and Wastewater Treatment Plant Public Projects through the use of IPD Principles: A Case Study

Improving the Delivery Process of Water and Wastewater Treatment Plant Public Projects through the use of IPD Principles: A Case Study

Improving the Delivery Process of Water and Wastewater Treatment Plant Public Projects through the use of IPD Principles: A Case Study

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Improving the Delivery Process of Water and Wastewater Treatment Plant Public Projects through the use of IPD Principles: A Case Study
Abstract
The complex nature of the processes performed by water and wastewater treatment facilities render the planning, design, and construction management of such facilities rather complicated tasks that require specialized expertise. Existing data shows that nine out of every ten such projects in North America incur as much as 24% cost overruns, and between forty and fifty percent of them are behind schedule. The currently used project delivery methods of such public projects must therefore be reassessed to find ways to alleviate these chronic shortcomings. Data for several water and wastewater projects delivered using the traditional Design-Bid-Build (DBB) delivery method is collected from water utilities in South Florida. The collected data is used to compute key performance indicators (KPIs) of these projects. A selected array of Integrated Project Delivery (IPD) principles, that can be readily implemented to public projects without violating established policies for publicly-owned projects, are implemented in two case study projects, and their respective performance is measured using the same KPIs. The KPIs obtained are compared using performance metric formulae. The data analysis shows enhancements in the performance of the delivery of public water and wastewater construction projects through the implementation of certain aspects of IPD. It is recommended for water and wastewater owners, designers, builders, and operators to have a clear mission and vision to implement more IPD principles to the traditional delivery of public projects. This will allow for faster, smoother, and cheaper installation of such facilities. Governments should also find ways to incorporate certain IPD principles into public water and wastewater projects’ bidding and contractual policies and guidelines.
The complex nature of the processes performed by water and wastewater treatment facilities render the planning, design, and construction management of such facilities rather complicated tasks that require specialized expertise. Existing data shows that nine out of every ten such projects in North America incur as much as 24% cost overruns, and between forty and fifty percent of them are behind...
Author(s)
Caesar Abi ShdidElie Andary
SourceProceedings of the Water Environment Federation
SubjectResearch Article
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Feb, 2015
ISSN1938-6478
DOI10.2175/193864715819557461
Volume / Issue2015 / 4
Content sourceUtility Management Conference
Copyright2015
Word count283

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Improving the Delivery Process of Water and Wastewater Treatment Plant Public Projects through the use of IPD Principles: A Case Study'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Improving the Delivery Process of Water and Wastewater Treatment Plant Public Projects through the use of IPD Principles: A Case Study
Pricing
Non-member price: $11.50
Member price:
-278410
Get access
-278410
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Improving the Delivery Process of Water and Wastewater Treatment Plant Public Projects through the use of IPD Principles: A Case Study'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Improving the Delivery Process of Water and Wastewater Treatment Plant Public Projects through the use of IPD Principles: A Case Study
Abstract
The complex nature of the processes performed by water and wastewater treatment facilities render the planning, design, and construction management of such facilities rather complicated tasks that require specialized expertise. Existing data shows that nine out of every ten such projects in North America incur as much as 24% cost overruns, and between forty and fifty percent of them are behind schedule. The currently used project delivery methods of such public projects must therefore be reassessed to find ways to alleviate these chronic shortcomings. Data for several water and wastewater projects delivered using the traditional Design-Bid-Build (DBB) delivery method is collected from water utilities in South Florida. The collected data is used to compute key performance indicators (KPIs) of these projects. A selected array of Integrated Project Delivery (IPD) principles, that can be readily implemented to public projects without violating established policies for publicly-owned projects, are implemented in two case study projects, and their respective performance is measured using the same KPIs. The KPIs obtained are compared using performance metric formulae. The data analysis shows enhancements in the performance of the delivery of public water and wastewater construction projects through the implementation of certain aspects of IPD. It is recommended for water and wastewater owners, designers, builders, and operators to have a clear mission and vision to implement more IPD principles to the traditional delivery of public projects. This will allow for faster, smoother, and cheaper installation of such facilities. Governments should also find ways to incorporate certain IPD principles into public water and wastewater projects’ bidding and contractual policies and guidelines.
The complex nature of the processes performed by water and wastewater treatment facilities render the planning, design, and construction management of such facilities rather complicated tasks that require specialized expertise. Existing data shows that nine out of every ten such projects in North America incur as much as 24% cost overruns, and between forty and fifty percent of them are behind...
Author(s)
Caesar Abi ShdidElie Andary
SourceProceedings of the Water Environment Federation
SubjectResearch Article
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Feb, 2015
ISSN1938-6478
DOI10.2175/193864715819557461
Volume / Issue2015 / 4
Content sourceUtility Management Conference
Copyright2015
Word count283

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Caesar Abi Shdid# Elie Andary. Improving the Delivery Process of Water and Wastewater Treatment Plant Public Projects through the use of IPD Principles: A Case Study. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 12 Jul. 2025. <https://www.accesswater.org?id=-278410CITANCHOR>.
Caesar Abi Shdid# Elie Andary. Improving the Delivery Process of Water and Wastewater Treatment Plant Public Projects through the use of IPD Principles: A Case Study. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed July 12, 2025. https://www.accesswater.org/?id=-278410CITANCHOR.
Caesar Abi Shdid# Elie Andary
Improving the Delivery Process of Water and Wastewater Treatment Plant Public Projects through the use of IPD Principles: A Case Study
Access Water
Water Environment Federation
December 22, 2018
July 12, 2025
https://www.accesswater.org/?id=-278410CITANCHOR