lastID = -280660
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: W12-Proceedings
Economic Evaluation of Power Factor Improvement: A Case Study for a Water Treatment Plant
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-03-31 00:59:56 Adam Phillips
  • 2020-03-31 00:59:55 Adam Phillips
  • 2020-01-31 22:15:28 Administrator
  • 2020-01-31 22:15:27 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: W12-Proceedings
Economic Evaluation of Power Factor Improvement: A Case Study for a Water Treatment Plant

Economic Evaluation of Power Factor Improvement: A Case Study for a Water Treatment Plant

Economic Evaluation of Power Factor Improvement: A Case Study for a Water Treatment Plant

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: W12-Proceedings
Economic Evaluation of Power Factor Improvement: A Case Study for a Water Treatment Plant
Abstract
Poor power factor in an industrial plant can lead to low energy efficiency, unacceptable voltage regulation, larger equipment size, and potential damage to plant equipment when not corrected properly. The most common and inexpensive way to correct power factor in an industrial application is by supplying reactive power with a capacitor bank. However, other application issues must be considered when capacitance is added to the system. This paper takes a fresh look at an old application, focusing on the potential issues with power factor improvement capacitors, available power factor correction methods, and design considerations for implementing these technologies in today's modern power systems.
Poor power factor in an industrial plant can lead to low energy efficiency, unacceptable voltage regulation, larger equipment size, and potential damage to plant equipment when not corrected properly. The most common and inexpensive way to correct power factor in an industrial application is by supplying reactive power with a capacitor bank. However, other application issues must be considered...
Author(s)
Christopher A. HegerP.K. SenAnthony Morroni
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2012
ISSN1938-6478
DOI10.2175/193864712811741322
Volume / Issue2012 / 16
Content sourceWEFTEC
Copyright2012
Word count117

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Economic Evaluation of Power Factor Improvement: A Case Study for a Water Treatment Plant'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: W12-Proceedings
Economic Evaluation of Power Factor Improvement: A Case Study for a Water Treatment Plant
Pricing
Non-member price: $11.50
Member price:
-280660
Get access
-280660
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Economic Evaluation of Power Factor Improvement: A Case Study for a Water Treatment Plant'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: W12-Proceedings
Economic Evaluation of Power Factor Improvement: A Case Study for a Water Treatment Plant
Abstract
Poor power factor in an industrial plant can lead to low energy efficiency, unacceptable voltage regulation, larger equipment size, and potential damage to plant equipment when not corrected properly. The most common and inexpensive way to correct power factor in an industrial application is by supplying reactive power with a capacitor bank. However, other application issues must be considered when capacitance is added to the system. This paper takes a fresh look at an old application, focusing on the potential issues with power factor improvement capacitors, available power factor correction methods, and design considerations for implementing these technologies in today's modern power systems.
Poor power factor in an industrial plant can lead to low energy efficiency, unacceptable voltage regulation, larger equipment size, and potential damage to plant equipment when not corrected properly. The most common and inexpensive way to correct power factor in an industrial application is by supplying reactive power with a capacitor bank. However, other application issues must be considered...
Author(s)
Christopher A. HegerP.K. SenAnthony Morroni
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2012
ISSN1938-6478
DOI10.2175/193864712811741322
Volume / Issue2012 / 16
Content sourceWEFTEC
Copyright2012
Word count117

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Christopher A. Heger# P.K. Sen# Anthony Morroni. Economic Evaluation of Power Factor Improvement: A Case Study for a Water Treatment Plant. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 8 Jun. 2025. <https://www.accesswater.org?id=-280660CITANCHOR>.
Christopher A. Heger# P.K. Sen# Anthony Morroni. Economic Evaluation of Power Factor Improvement: A Case Study for a Water Treatment Plant. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 8, 2025. https://www.accesswater.org/?id=-280660CITANCHOR.
Christopher A. Heger# P.K. Sen# Anthony Morroni
Economic Evaluation of Power Factor Improvement: A Case Study for a Water Treatment Plant
Access Water
Water Environment Federation
December 22, 2018
June 8, 2025
https://www.accesswater.org/?id=-280660CITANCHOR