Lessons Learned Through Bidding, Award and the First Year of Construction of a 54-inch Sewer in Environmentally Sensitive Area
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-03-31 01:04:29 Adam Phillips
  • 2020-03-31 01:04:28 Adam Phillips
  • 2020-02-01 00:59:22 Administrator
  • 2020-02-01 00:59:21 Administrator
  • 2020-02-01 00:59:20 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: W12-Proceedings
Lessons Learned Through Bidding, Award and the First Year of Construction of a 54-inch Sewer in Environmentally Sensitive Area

Lessons Learned Through Bidding, Award and the First Year of Construction of a 54-inch Sewer in Environmentally Sensitive Area

Lessons Learned Through Bidding, Award and the First Year of Construction of a 54-inch Sewer in Environmentally Sensitive Area

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: W12-Proceedings
Lessons Learned Through Bidding, Award and the First Year of Construction of a 54-inch Sewer in Environmentally Sensitive Area
Abstract
On the Santa Ana River Interceptor (SARI) Replacement Project Mainline Contract, the bids received were significantly lower than the engineer's estimated construction cost. Information will be provided to help you estimate similar projects based on current economic conditions. In addition, a bid irregularity was identified which required special approval from the elected officials which otherwise would have cost the agency over $3M. Obtaining elected official approval was a significant process to complete analysis, make recommendation, review potential legal liabilities, and make public meeting presentations to obtain their approval. Attendees will learn from our experience of specific “do's and don'ts” when going through the process of obtaining elected official approval to waive a bid irregularity.Upon implementation of construction, the contractor submitted a value engineering suggestion to save the project over $1M. The recommended design change was to eliminate one of the deep tunnel shafts and allow the microtunnel to be installed on a horizontal curve. Although horizontal curve alignments are common overseas, only one planned horizontal curve microtunnel project has been successfully completed in the United States. The presentation will cover some of the more significant details of the cost saving request, including items added to help reduce the owner's risk of implementing a curved tunnel installation (longer drive length) and joint deflection.
On the Santa Ana River Interceptor (SARI) Replacement Project Mainline Contract, the bids received were significantly lower than the engineer's estimated construction cost. Information will be provided to help you estimate similar projects based on current economic conditions. In addition, a bid irregularity was identified which required special approval from the elected officials which otherwise...
Author(s)
Steven Agor
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2012
ISSN1938-6478
DOI10.2175/193864712811710281
Volume / Issue2012 / 9
Content sourceWEFTEC
Copyright2012
Word count232

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Lessons Learned Through Bidding, Award and the First Year of Construction of a 54-inch Sewer in Environmentally Sensitive Area'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: W12-Proceedings
Lessons Learned Through Bidding, Award and the First Year of Construction of a 54-inch Sewer in Environmentally Sensitive Area
Pricing
Non-member price: $11.50
Member price:
-281184
Get access
-281184
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Lessons Learned Through Bidding, Award and the First Year of Construction of a 54-inch Sewer in Environmentally Sensitive Area'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: W12-Proceedings
Lessons Learned Through Bidding, Award and the First Year of Construction of a 54-inch Sewer in Environmentally Sensitive Area
Abstract
On the Santa Ana River Interceptor (SARI) Replacement Project Mainline Contract, the bids received were significantly lower than the engineer's estimated construction cost. Information will be provided to help you estimate similar projects based on current economic conditions. In addition, a bid irregularity was identified which required special approval from the elected officials which otherwise would have cost the agency over $3M. Obtaining elected official approval was a significant process to complete analysis, make recommendation, review potential legal liabilities, and make public meeting presentations to obtain their approval. Attendees will learn from our experience of specific “do's and don'ts” when going through the process of obtaining elected official approval to waive a bid irregularity.Upon implementation of construction, the contractor submitted a value engineering suggestion to save the project over $1M. The recommended design change was to eliminate one of the deep tunnel shafts and allow the microtunnel to be installed on a horizontal curve. Although horizontal curve alignments are common overseas, only one planned horizontal curve microtunnel project has been successfully completed in the United States. The presentation will cover some of the more significant details of the cost saving request, including items added to help reduce the owner's risk of implementing a curved tunnel installation (longer drive length) and joint deflection.
On the Santa Ana River Interceptor (SARI) Replacement Project Mainline Contract, the bids received were significantly lower than the engineer's estimated construction cost. Information will be provided to help you estimate similar projects based on current economic conditions. In addition, a bid irregularity was identified which required special approval from the elected officials which otherwise...
Author(s)
Steven Agor
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2012
ISSN1938-6478
DOI10.2175/193864712811710281
Volume / Issue2012 / 9
Content sourceWEFTEC
Copyright2012
Word count232

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Steven Agor. Lessons Learned Through Bidding, Award and the First Year of Construction of a 54-inch Sewer in Environmentally Sensitive Area. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 4 Jul. 2025. <https://www.accesswater.org?id=-281184CITANCHOR>.
Steven Agor. Lessons Learned Through Bidding, Award and the First Year of Construction of a 54-inch Sewer in Environmentally Sensitive Area. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed July 4, 2025. https://www.accesswater.org/?id=-281184CITANCHOR.
Steven Agor
Lessons Learned Through Bidding, Award and the First Year of Construction of a 54-inch Sewer in Environmentally Sensitive Area
Access Water
Water Environment Federation
December 22, 2018
July 4, 2025
https://www.accesswater.org/?id=-281184CITANCHOR