lastID = -287991
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
HOW JEA SAVED MILLIONS ON A HIGH VOLUME PIPE BURSTING CONTRACT
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 11:32:35 Adam Phillips
  • 2020-01-31 23:55:40 Administrator
  • 2020-01-31 23:55:39 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
HOW JEA SAVED MILLIONS ON A HIGH VOLUME PIPE BURSTING CONTRACT

HOW JEA SAVED MILLIONS ON A HIGH VOLUME PIPE BURSTING CONTRACT

HOW JEA SAVED MILLIONS ON A HIGH VOLUME PIPE BURSTING CONTRACT

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
HOW JEA SAVED MILLIONS ON A HIGH VOLUME PIPE BURSTING CONTRACT
Abstract
Following an EPA Administrative Order issued in 1996, JEA committed to spend 200 million for sewer repair projects in the city of Jacksonville. After comparing the performance and costs of repair techniques, pipe bursting was chosen as the preferred method.As JEA began to bid the projects, it encountered unexpectedly high costs. Opening the bids to local competition did not lower the costs. Consequently, JEA began an investigation into ways to reduce the costs.Specific tasks were assigned to JEA employees and to independent consultants. Black & Veatch was tasked with analyzing the potential for savings associated with a long-term/high volume contract.Black & Veatch compared the costs of a short-term low volume (average of 17,000 feet of pipe) contract with those of a one-year contract, involving 200,000 feet of pipe. Potential sources of savings that were analyzed included administrative costs, travel/per diem expenses, materials, mobilization, and profit. An expected savings up to 18.5% was calculated, with more potential savings hidden in contractors profits. Based on the information provided by Black & Veatch, JEA developed a Pipe Bursting Business Plan which was used to estimate the actual costs to a pipe bursting contractor. The results of these combined efforts indicated that the current pricing was too high.As part of preparation of the bid, JEA conducted a nationwide survey of pipe bursting contractors to determine their levels of experience and bonding capabilities. JEA decided to allow bids by joint ventures to increase the number of qualified bidders.JEA then developed a bid package for bursting 150,000 feet of pipe per year for five years with one five-year renewable option. To help control the pricing, JEA fixed the price for items such as sidewalks, pavements, and curb and gutter replacement at an average cost based on previous bids. Then, by applying the estimated costs from the Business Plan, JEA inserted target prices for critical items, such as pipe bursting and service connections. Finally, it established a maximum total price of 16 million, which was slightly higher than the target price, to allow for flexibility.Bids were opened on September 14, 2000. Two bids were received, both of which were below the maximum price. The winning bid was submitted by a joint venture between the two largest pipe-bursting contractors in the country. Their bid was approximately 109 per foot (all costs included) compared with an average cost of 137 per foot on previous projects, for a savings of 28 per foot, or 20.4 percent. For a 150,000 foot contract, this amounts to a savings of 4.2 million per year, not including savings in administrative costs. JEA considers the results to be very favorable.The production goal for the contract has since been increased to 90 miles for the first year and 120 miles for the next four years, for a total potential savings in five years of 84.3 million.
Following an EPA Administrative Order issued in 1996, JEA committed to spend 200 million for sewer repair projects in the city of Jacksonville. After comparing the performance and costs of repair techniques, pipe bursting was chosen as the preferred method.As JEA began to bid the projects, it encountered unexpectedly high costs. Opening the bids to local competition did not lower the costs....
Author(s)
Heather CavanaghRobert KermitzJohn Mansen
SourceProceedings of the Water Environment Federation
SubjectSession 48 - Collection Systems Symposium: Trenchless Technology
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:12L.488;1-
DOI10.2175/193864701790864836
Volume / Issue2001 / 12
Content sourceWEFTEC
First / last page(s)488 - 496
Copyright2001
Word count481

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'HOW JEA SAVED MILLIONS ON A HIGH VOLUME PIPE BURSTING CONTRACT'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
HOW JEA SAVED MILLIONS ON A HIGH VOLUME PIPE BURSTING CONTRACT
Pricing
Non-member price: $11.50
Member price:
-287991
Get access
-287991
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'HOW JEA SAVED MILLIONS ON A HIGH VOLUME PIPE BURSTING CONTRACT'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
HOW JEA SAVED MILLIONS ON A HIGH VOLUME PIPE BURSTING CONTRACT
Abstract
Following an EPA Administrative Order issued in 1996, JEA committed to spend 200 million for sewer repair projects in the city of Jacksonville. After comparing the performance and costs of repair techniques, pipe bursting was chosen as the preferred method.As JEA began to bid the projects, it encountered unexpectedly high costs. Opening the bids to local competition did not lower the costs. Consequently, JEA began an investigation into ways to reduce the costs.Specific tasks were assigned to JEA employees and to independent consultants. Black & Veatch was tasked with analyzing the potential for savings associated with a long-term/high volume contract.Black & Veatch compared the costs of a short-term low volume (average of 17,000 feet of pipe) contract with those of a one-year contract, involving 200,000 feet of pipe. Potential sources of savings that were analyzed included administrative costs, travel/per diem expenses, materials, mobilization, and profit. An expected savings up to 18.5% was calculated, with more potential savings hidden in contractors profits. Based on the information provided by Black & Veatch, JEA developed a Pipe Bursting Business Plan which was used to estimate the actual costs to a pipe bursting contractor. The results of these combined efforts indicated that the current pricing was too high.As part of preparation of the bid, JEA conducted a nationwide survey of pipe bursting contractors to determine their levels of experience and bonding capabilities. JEA decided to allow bids by joint ventures to increase the number of qualified bidders.JEA then developed a bid package for bursting 150,000 feet of pipe per year for five years with one five-year renewable option. To help control the pricing, JEA fixed the price for items such as sidewalks, pavements, and curb and gutter replacement at an average cost based on previous bids. Then, by applying the estimated costs from the Business Plan, JEA inserted target prices for critical items, such as pipe bursting and service connections. Finally, it established a maximum total price of 16 million, which was slightly higher than the target price, to allow for flexibility.Bids were opened on September 14, 2000. Two bids were received, both of which were below the maximum price. The winning bid was submitted by a joint venture between the two largest pipe-bursting contractors in the country. Their bid was approximately 109 per foot (all costs included) compared with an average cost of 137 per foot on previous projects, for a savings of 28 per foot, or 20.4 percent. For a 150,000 foot contract, this amounts to a savings of 4.2 million per year, not including savings in administrative costs. JEA considers the results to be very favorable.The production goal for the contract has since been increased to 90 miles for the first year and 120 miles for the next four years, for a total potential savings in five years of 84.3 million.
Following an EPA Administrative Order issued in 1996, JEA committed to spend 200 million for sewer repair projects in the city of Jacksonville. After comparing the performance and costs of repair techniques, pipe bursting was chosen as the preferred method.As JEA began to bid the projects, it encountered unexpectedly high costs. Opening the bids to local competition did not lower the costs....
Author(s)
Heather CavanaghRobert KermitzJohn Mansen
SourceProceedings of the Water Environment Federation
SubjectSession 48 - Collection Systems Symposium: Trenchless Technology
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:12L.488;1-
DOI10.2175/193864701790864836
Volume / Issue2001 / 12
Content sourceWEFTEC
First / last page(s)488 - 496
Copyright2001
Word count481

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Heather Cavanagh# Robert Kermitz# John Mansen. HOW JEA SAVED MILLIONS ON A HIGH VOLUME PIPE BURSTING CONTRACT. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 30 Sep. 2025. <https://www.accesswater.org?id=-287991CITANCHOR>.
Heather Cavanagh# Robert Kermitz# John Mansen. HOW JEA SAVED MILLIONS ON A HIGH VOLUME PIPE BURSTING CONTRACT. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed September 30, 2025. https://www.accesswater.org/?id=-287991CITANCHOR.
Heather Cavanagh# Robert Kermitz# John Mansen
HOW JEA SAVED MILLIONS ON A HIGH VOLUME PIPE BURSTING CONTRACT
Access Water
Water Environment Federation
December 22, 2018
September 30, 2025
https://www.accesswater.org/?id=-287991CITANCHOR