lastID = -288592
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
PLACING SOUTH CAROLINA's LARGEST SEWER IN SERVICE GO WITH THE FLOW — IT ALL RUNS DOWNHILL ANYWAY
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 11:40:13 Adam Phillips
  • 2020-02-01 03:01:18 Administrator
  • 2020-02-01 03:01:17 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
PLACING SOUTH CAROLINA's LARGEST SEWER IN SERVICE GO WITH THE FLOW — IT ALL RUNS DOWNHILL ANYWAY

PLACING SOUTH CAROLINA's LARGEST SEWER IN SERVICE GO WITH THE FLOW — IT ALL RUNS DOWNHILL ANYWAY

PLACING SOUTH CAROLINA's LARGEST SEWER IN SERVICE GO WITH THE FLOW — IT ALL RUNS DOWNHILL ANYWAY

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
PLACING SOUTH CAROLINA's LARGEST SEWER IN SERVICE GO WITH THE FLOW — IT ALL RUNS DOWNHILL ANYWAY
Abstract
Western Carolina Regional Sewer Authority (WCRSA) is in the final stage of construction of South Carolina's largest wet-weather sewer project. The 45 million Reedy River and Brushy Creek Sewer System will convey 160 mgd and includes ten miles of deep trunk sewer up to 96 inches in diameter. This project has been ongoing for more than eight years, including initial study phase, design, and construction of sewers in two phases.The new Reedy River Trunk Sewer replaces a 36-inch sewer constructed in 1927. The existing 48-inch Reedy River Sewer will remain in service and will operate in parallel with the new trunk sewer to convey flow to the Mauldin Road Wastewater Treatment Plant (WWTP). This expanded Reedy River Trunk Sewer System is designed to convey wet-weather flows during a two-year storm event to the plant without sewer system overflows (SSOs).The new PVC-lined reinforced concrete pipe (RCP) trunk sewer had to be installed, tested, and accepted by the design engineer, Camp Dresser & McKee (CDM), WCRSA, and South Carolina Department of Health and Environmental Control (SCDHEC) before any flow could be diverted from existing collection sewers. The old 36-inch sewer was then removed from service and replaced with smaller sewers to interconnect existing collector sewers along the route. Continuous sewer service was maintained through sequential upstream-to-downstream flow diversions to unload the 36-inch sewer. Various construction techniques included installing smaller sewers inside the 36-inch sewer, replacing the 36-inch sewer with new, small-diameter sewers in the same trench, and in some instances abandonment of the existing sewer. Also, several existing manholes were rehabilitated to minimize disturbance in the Greenville Zoo. Diversions and interconnections were completed under the constant threat of high infiltration and inflow and river flooding. Throughout this process, State and Sewer Subdistrict coordination was critical to successfully manage existing flows.This paper focuses on the final stage of construction, including:Construction sequencing to ensure that a high level of sewer service was continuously maintainedCoordination with start-up of the new Mauldin Road WWTP influent pump stationTesting and certification of the large Reedy River Trunk SewerSequential flow diversions and sewer interconnections required to remove the 36-inch sewer from service and place the new trunk sewer in operation
Western Carolina Regional Sewer Authority (WCRSA) is in the final stage of construction of South Carolina's largest wet-weather sewer project. The 45 million Reedy River and Brushy Creek Sewer System will convey 160 mgd and includes ten miles of deep trunk sewer up to 96 inches in diameter. This project has been ongoing for more than eight years, including initial study phase, design, and...
Author(s)
Lauren R. HildebrandF. Stinnes Jordan
SourceProceedings of the Water Environment Federation
SubjectSession 83 - Collection Systems Symposium: The Real Time Experience
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:8L.119;1-
DOI10.2175/193864701790861992
Volume / Issue2001 / 8
Content sourceWEFTEC
First / last page(s)119 - 122
Copyright2001
Word count382

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'PLACING SOUTH CAROLINA's LARGEST SEWER IN SERVICE GO WITH THE FLOW — IT ALL RUNS DOWNHILL ANYWAY'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
PLACING SOUTH CAROLINA's LARGEST SEWER IN SERVICE GO WITH THE FLOW — IT ALL RUNS DOWNHILL ANYWAY
Pricing
Non-member price: $11.50
Member price:
-288592
Get access
-288592
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'PLACING SOUTH CAROLINA's LARGEST SEWER IN SERVICE GO WITH THE FLOW — IT ALL RUNS DOWNHILL ANYWAY'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
PLACING SOUTH CAROLINA's LARGEST SEWER IN SERVICE GO WITH THE FLOW — IT ALL RUNS DOWNHILL ANYWAY
Abstract
Western Carolina Regional Sewer Authority (WCRSA) is in the final stage of construction of South Carolina's largest wet-weather sewer project. The 45 million Reedy River and Brushy Creek Sewer System will convey 160 mgd and includes ten miles of deep trunk sewer up to 96 inches in diameter. This project has been ongoing for more than eight years, including initial study phase, design, and construction of sewers in two phases.The new Reedy River Trunk Sewer replaces a 36-inch sewer constructed in 1927. The existing 48-inch Reedy River Sewer will remain in service and will operate in parallel with the new trunk sewer to convey flow to the Mauldin Road Wastewater Treatment Plant (WWTP). This expanded Reedy River Trunk Sewer System is designed to convey wet-weather flows during a two-year storm event to the plant without sewer system overflows (SSOs).The new PVC-lined reinforced concrete pipe (RCP) trunk sewer had to be installed, tested, and accepted by the design engineer, Camp Dresser & McKee (CDM), WCRSA, and South Carolina Department of Health and Environmental Control (SCDHEC) before any flow could be diverted from existing collection sewers. The old 36-inch sewer was then removed from service and replaced with smaller sewers to interconnect existing collector sewers along the route. Continuous sewer service was maintained through sequential upstream-to-downstream flow diversions to unload the 36-inch sewer. Various construction techniques included installing smaller sewers inside the 36-inch sewer, replacing the 36-inch sewer with new, small-diameter sewers in the same trench, and in some instances abandonment of the existing sewer. Also, several existing manholes were rehabilitated to minimize disturbance in the Greenville Zoo. Diversions and interconnections were completed under the constant threat of high infiltration and inflow and river flooding. Throughout this process, State and Sewer Subdistrict coordination was critical to successfully manage existing flows.This paper focuses on the final stage of construction, including:Construction sequencing to ensure that a high level of sewer service was continuously maintainedCoordination with start-up of the new Mauldin Road WWTP influent pump stationTesting and certification of the large Reedy River Trunk SewerSequential flow diversions and sewer interconnections required to remove the 36-inch sewer from service and place the new trunk sewer in operation
Western Carolina Regional Sewer Authority (WCRSA) is in the final stage of construction of South Carolina's largest wet-weather sewer project. The 45 million Reedy River and Brushy Creek Sewer System will convey 160 mgd and includes ten miles of deep trunk sewer up to 96 inches in diameter. This project has been ongoing for more than eight years, including initial study phase, design, and...
Author(s)
Lauren R. HildebrandF. Stinnes Jordan
SourceProceedings of the Water Environment Federation
SubjectSession 83 - Collection Systems Symposium: The Real Time Experience
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:8L.119;1-
DOI10.2175/193864701790861992
Volume / Issue2001 / 8
Content sourceWEFTEC
First / last page(s)119 - 122
Copyright2001
Word count382

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Lauren R. Hildebrand# F. Stinnes Jordan. PLACING SOUTH CAROLINA's LARGEST SEWER IN SERVICE GO WITH THE FLOW — IT ALL RUNS DOWNHILL ANYWAY. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 27 Sep. 2025. <https://www.accesswater.org?id=-288592CITANCHOR>.
Lauren R. Hildebrand# F. Stinnes Jordan. PLACING SOUTH CAROLINA's LARGEST SEWER IN SERVICE GO WITH THE FLOW — IT ALL RUNS DOWNHILL ANYWAY. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed September 27, 2025. https://www.accesswater.org/?id=-288592CITANCHOR.
Lauren R. Hildebrand# F. Stinnes Jordan
PLACING SOUTH CAROLINA's LARGEST SEWER IN SERVICE GO WITH THE FLOW — IT ALL RUNS DOWNHILL ANYWAY
Access Water
Water Environment Federation
December 22, 2018
September 27, 2025
https://www.accesswater.org/?id=-288592CITANCHOR