lastID = -288638
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
OPTIMIZATION OF AN AERATION SYSTEM AT AN INDUSTRIAL WASTEWATER TREATMENT PLANT
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 14:39:39 Adam Phillips
  • 2022-05-06 14:39:38 Adam Phillips
  • 2020-02-01 02:34:10 Administrator
  • 2020-02-01 02:34:09 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
OPTIMIZATION OF AN AERATION SYSTEM AT AN INDUSTRIAL WASTEWATER TREATMENT PLANT

OPTIMIZATION OF AN AERATION SYSTEM AT AN INDUSTRIAL WASTEWATER TREATMENT PLANT

OPTIMIZATION OF AN AERATION SYSTEM AT AN INDUSTRIAL WASTEWATER TREATMENT PLANT

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
OPTIMIZATION OF AN AERATION SYSTEM AT AN INDUSTRIAL WASTEWATER TREATMENT PLANT
Abstract
The Rohm and Haas Company wanted to reduce O&M costs at their Industrial Wastewater Treatment Plant in Bristol, PA. Like most activated sludge facilities, the greatest opportunities for costs savings and optimization revolved around the Aeration System. It was clear the existing Aeration Blowers were well oversized and the existing instrumentation was not reliable. Therefore, Rohm and Haas embarked on a program to systematically review the entire Aeration System and answer the following key questions:How much air is really required for the process?Are the existing blowers correctly sized and operating efficiently?Do we have accurate data for Dissolved Oxygen (D.O.), air flow, blower amps and other key parameters? If not, should we install any new instruments?Should we modify the Aeration System controls?What else can we do to improve the operability of the systemHow can our experiences benefit other Rohm and Haas Facility's and other WWTPs?Rohm and Haas applied Reliability Engineering principles and basic common sense to try and answer the above questions and reduce costs. As a result, the following major changes were implemented:Interconnected the Aeration and Sludge Storage Tank Air Headers and eliminated the need to run two 40 HP blowers.Replaced the eight D.O. sensors and transmitters with new instruments.Replaced the eight annubars and differential pressure transmitters for air flow with new mass flow devices.Repaired and adjusted the eight motor operated air control valves and three blower inlet throttling valves.Removed half of the fine bubble diffusers in each aeration tank.Instituted new control schemes for the Aeration System in the computer control system in order to minimize energy usage while maintaining the process.These changes have already resulted in operating cost savings of over 40,000 per year. The optimization work continues, primarily related to the three (3) 300 HP Aeration Blowers which are considerably oversized and therefore operating very inefficiently.The Authors believe this work can be applied at many activated sludge plants (both industrial and municipal) to optimize operations and save costs. Furthermore, engineers should keep in mind operating flexibility and efficiency when designing new plants or upgrading existing facilities.
The Rohm and Haas Company wanted to reduce O&M costs at their Industrial Wastewater Treatment Plant in Bristol, PA. Like most activated sludge facilities, the greatest opportunities for costs savings and optimization revolved around the Aeration System. It was clear the existing Aeration Blowers were well oversized and the existing instrumentation was not reliable. Therefore, Rohm and Haas...
Author(s)
Lawrence R. SandeenPhilip L. Schwartz
SourceProceedings of the Water Environment Federation
SubjectSession 73 - Plant Operations I: Plant Operations and Maintenance—Biological Systems
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:9L.170;1-
DOI10.2175/193864701790861307
Volume / Issue2001 / 9
Content sourceWEFTEC
First / last page(s)170 - 186
Copyright2001
Word count363

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'OPTIMIZATION OF AN AERATION SYSTEM AT AN INDUSTRIAL WASTEWATER TREATMENT PLANT'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
OPTIMIZATION OF AN AERATION SYSTEM AT AN INDUSTRIAL WASTEWATER TREATMENT PLANT
Pricing
Non-member price: $11.50
Member price:
-288638
Get access
-288638
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'OPTIMIZATION OF AN AERATION SYSTEM AT AN INDUSTRIAL WASTEWATER TREATMENT PLANT'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
OPTIMIZATION OF AN AERATION SYSTEM AT AN INDUSTRIAL WASTEWATER TREATMENT PLANT
Abstract
The Rohm and Haas Company wanted to reduce O&M costs at their Industrial Wastewater Treatment Plant in Bristol, PA. Like most activated sludge facilities, the greatest opportunities for costs savings and optimization revolved around the Aeration System. It was clear the existing Aeration Blowers were well oversized and the existing instrumentation was not reliable. Therefore, Rohm and Haas embarked on a program to systematically review the entire Aeration System and answer the following key questions:How much air is really required for the process?Are the existing blowers correctly sized and operating efficiently?Do we have accurate data for Dissolved Oxygen (D.O.), air flow, blower amps and other key parameters? If not, should we install any new instruments?Should we modify the Aeration System controls?What else can we do to improve the operability of the systemHow can our experiences benefit other Rohm and Haas Facility's and other WWTPs?Rohm and Haas applied Reliability Engineering principles and basic common sense to try and answer the above questions and reduce costs. As a result, the following major changes were implemented:Interconnected the Aeration and Sludge Storage Tank Air Headers and eliminated the need to run two 40 HP blowers.Replaced the eight D.O. sensors and transmitters with new instruments.Replaced the eight annubars and differential pressure transmitters for air flow with new mass flow devices.Repaired and adjusted the eight motor operated air control valves and three blower inlet throttling valves.Removed half of the fine bubble diffusers in each aeration tank.Instituted new control schemes for the Aeration System in the computer control system in order to minimize energy usage while maintaining the process.These changes have already resulted in operating cost savings of over 40,000 per year. The optimization work continues, primarily related to the three (3) 300 HP Aeration Blowers which are considerably oversized and therefore operating very inefficiently.The Authors believe this work can be applied at many activated sludge plants (both industrial and municipal) to optimize operations and save costs. Furthermore, engineers should keep in mind operating flexibility and efficiency when designing new plants or upgrading existing facilities.
The Rohm and Haas Company wanted to reduce O&M costs at their Industrial Wastewater Treatment Plant in Bristol, PA. Like most activated sludge facilities, the greatest opportunities for costs savings and optimization revolved around the Aeration System. It was clear the existing Aeration Blowers were well oversized and the existing instrumentation was not reliable. Therefore, Rohm and Haas...
Author(s)
Lawrence R. SandeenPhilip L. Schwartz
SourceProceedings of the Water Environment Federation
SubjectSession 73 - Plant Operations I: Plant Operations and Maintenance—Biological Systems
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:9L.170;1-
DOI10.2175/193864701790861307
Volume / Issue2001 / 9
Content sourceWEFTEC
First / last page(s)170 - 186
Copyright2001
Word count363

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Lawrence R. Sandeen# Philip L. Schwartz. OPTIMIZATION OF AN AERATION SYSTEM AT AN INDUSTRIAL WASTEWATER TREATMENT PLANT. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 4 Jul. 2025. <https://www.accesswater.org?id=-288638CITANCHOR>.
Lawrence R. Sandeen# Philip L. Schwartz. OPTIMIZATION OF AN AERATION SYSTEM AT AN INDUSTRIAL WASTEWATER TREATMENT PLANT. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed July 4, 2025. https://www.accesswater.org/?id=-288638CITANCHOR.
Lawrence R. Sandeen# Philip L. Schwartz
OPTIMIZATION OF AN AERATION SYSTEM AT AN INDUSTRIAL WASTEWATER TREATMENT PLANT
Access Water
Water Environment Federation
December 22, 2018
July 4, 2025
https://www.accesswater.org/?id=-288638CITANCHOR