lastID = -288671
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
OPTIMIZATION OF OILY WASTEWATER MEMBRANE BIOREACTOR TREATMENT: PILOT TO FULL SCALE RESULTS
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 13:04:36 Adam Phillips
  • 2020-02-01 02:35:22 Administrator
  • 2020-02-01 02:35:21 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
OPTIMIZATION OF OILY WASTEWATER MEMBRANE BIOREACTOR TREATMENT: PILOT TO FULL SCALE RESULTS

OPTIMIZATION OF OILY WASTEWATER MEMBRANE BIOREACTOR TREATMENT: PILOT TO FULL SCALE RESULTS

OPTIMIZATION OF OILY WASTEWATER MEMBRANE BIOREACTOR TREATMENT: PILOT TO FULL SCALE RESULTS

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
OPTIMIZATION OF OILY WASTEWATER MEMBRANE BIOREACTOR TREATMENT: PILOT TO FULL SCALE RESULTS
Abstract
In the early 1990s, the General Motors Corporation (GM) adopted the use of the membrane biological reactor (MBR) process configuration for full scale treatment of manufacturing plant wastewaters in the US and internationally. Although the results and experience from operation of 4, full scale MBR systems for approximately 3 to 9 years have confirmed the major advantages of the technology, certain operating or design issues led to the development of a modified system referred to as the MBR-aerobic digester process configuration. Pilot plant studies were completed over the period from 1998 through 2000 in support of development of the modified system. A full scale MBR-aerobic digester system began operation in late 2000. The results from the pilot plant studies, and operation of the full scale system for approximately 5 months, indicate the modified system significantly reduces the cost of waste solids disposal without compromising system performance, relative to the conventional MBR system.
In the early 1990s, the General Motors Corporation (GM) adopted the use of the membrane biological reactor (MBR) process configuration for full scale treatment of manufacturing plant wastewaters in the US and internationally. Although the results and experience from operation of 4, full scale MBR systems for approximately 3 to 9 years have confirmed the major advantages of the technology, certain...
Author(s)
Paul M. SuttonPrakash N. MishraJeff A. RobertsLuis AbreuPaul Gignac
SourceProceedings of the Water Environment Federation
SubjectSession 78 - Industrial Issues and Treatment Technology Symposium: Automotive and Metals Wastewater
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:9L.529;1-
DOI10.2175/193864701790861370
Volume / Issue2001 / 9
Content sourceWEFTEC
First / last page(s)529 - 552
Copyright2001
Word count164

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'OPTIMIZATION OF OILY WASTEWATER MEMBRANE BIOREACTOR TREATMENT: PILOT TO FULL SCALE RESULTS'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
OPTIMIZATION OF OILY WASTEWATER MEMBRANE BIOREACTOR TREATMENT: PILOT TO FULL SCALE RESULTS
Pricing
Non-member price: $11.50
Member price:
-288671
Get access
-288671
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'OPTIMIZATION OF OILY WASTEWATER MEMBRANE BIOREACTOR TREATMENT: PILOT TO FULL SCALE RESULTS'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
OPTIMIZATION OF OILY WASTEWATER MEMBRANE BIOREACTOR TREATMENT: PILOT TO FULL SCALE RESULTS
Abstract
In the early 1990s, the General Motors Corporation (GM) adopted the use of the membrane biological reactor (MBR) process configuration for full scale treatment of manufacturing plant wastewaters in the US and internationally. Although the results and experience from operation of 4, full scale MBR systems for approximately 3 to 9 years have confirmed the major advantages of the technology, certain operating or design issues led to the development of a modified system referred to as the MBR-aerobic digester process configuration. Pilot plant studies were completed over the period from 1998 through 2000 in support of development of the modified system. A full scale MBR-aerobic digester system began operation in late 2000. The results from the pilot plant studies, and operation of the full scale system for approximately 5 months, indicate the modified system significantly reduces the cost of waste solids disposal without compromising system performance, relative to the conventional MBR system.
In the early 1990s, the General Motors Corporation (GM) adopted the use of the membrane biological reactor (MBR) process configuration for full scale treatment of manufacturing plant wastewaters in the US and internationally. Although the results and experience from operation of 4, full scale MBR systems for approximately 3 to 9 years have confirmed the major advantages of the technology, certain...
Author(s)
Paul M. SuttonPrakash N. MishraJeff A. RobertsLuis AbreuPaul Gignac
SourceProceedings of the Water Environment Federation
SubjectSession 78 - Industrial Issues and Treatment Technology Symposium: Automotive and Metals Wastewater
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:9L.529;1-
DOI10.2175/193864701790861370
Volume / Issue2001 / 9
Content sourceWEFTEC
First / last page(s)529 - 552
Copyright2001
Word count164

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Paul M. Sutton# Prakash N. Mishra# Jeff A. Roberts# Luis Abreu# Paul Gignac. OPTIMIZATION OF OILY WASTEWATER MEMBRANE BIOREACTOR TREATMENT: PILOT TO FULL SCALE RESULTS. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 6 Jun. 2025. <https://www.accesswater.org?id=-288671CITANCHOR>.
Paul M. Sutton# Prakash N. Mishra# Jeff A. Roberts# Luis Abreu# Paul Gignac. OPTIMIZATION OF OILY WASTEWATER MEMBRANE BIOREACTOR TREATMENT: PILOT TO FULL SCALE RESULTS. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 6, 2025. https://www.accesswater.org/?id=-288671CITANCHOR.
Paul M. Sutton# Prakash N. Mishra# Jeff A. Roberts# Luis Abreu# Paul Gignac
OPTIMIZATION OF OILY WASTEWATER MEMBRANE BIOREACTOR TREATMENT: PILOT TO FULL SCALE RESULTS
Access Water
Water Environment Federation
December 22, 2018
June 6, 2025
https://www.accesswater.org/?id=-288671CITANCHOR