lastID = -290040
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
FLUIDIZED BED INCINERATOR REPLACEMENT AT LYNN MASSACHUSETTS
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 15:06:26 Adam Phillips
  • 2022-05-04 15:06:25 Adam Phillips
  • 2020-03-27 00:53:25 Adam Phillips
  • 2020-01-31 23:15:34 Administrator
  • 2020-01-31 23:15:33 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
FLUIDIZED BED INCINERATOR REPLACEMENT AT LYNN MASSACHUSETTS

FLUIDIZED BED INCINERATOR REPLACEMENT AT LYNN MASSACHUSETTS

FLUIDIZED BED INCINERATOR REPLACEMENT AT LYNN MASSACHUSETTS

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
FLUIDIZED BED INCINERATOR REPLACEMENT AT LYNN MASSACHUSETTS
Abstract
A capital improvements program is underway at the Lynn Regional Wastewater Treatment Facility located in Lynn, Massachusetts, to upgrade aging preliminary treatment and biosolids handling facilities. As part of this program, new dewatering and fluidized bed incinerator (FBI) systems are replacing the existing systems for incineration of dewatered primary and secondary treatment biosolids with ultimate disposal at an onsite ash landfill.This program is being administered under a design/build/operate project delivery format. The design and construction period for the capital improvements program is 34 months and the operating term is 20-years. The project began in the fall of 2001 with new dewatering systems scheduled to be operational in mid 2003, and incinerator and ash handling systems scheduled to be operational in mid 2004.This paper focuses on the residuals and biosolids management facility improvements, beginning with a brief background on the Lynn Regional Wastewater Treatment Facility, followed by a description of the design criteria for the new dewatering and FBI systems, a discussion of the project challenges associated with design, construction, and regulatory approval, and a summary of the major FBI system components.
A capital improvements program is underway at the Lynn Regional Wastewater Treatment Facility located in Lynn, Massachusetts, to upgrade aging preliminary treatment and biosolids handling facilities. As part of this program, new dewatering and fluidized bed incinerator (FBI) systems are replacing the existing systems for incineration of dewatered primary and secondary treatment biosolids with...
Author(s)
Grant E. DaviesClifford L. GreenLouis T. BarryRobert J. Tina
SourceProceedings of the Water Environment Federation
SubjectSession 2 Biosolids Success Stories
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2003
ISSN1938-6478
SICI1938-6478(20030101)2003:1L.150;1-
DOI10.2175/193864703784292089
Volume / Issue2003 / 1
Content sourceResiduals and Biosolids Conference
First / last page(s)150 - 160
Copyright2003
Word count188

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'FLUIDIZED BED INCINERATOR REPLACEMENT AT LYNN MASSACHUSETTS'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
FLUIDIZED BED INCINERATOR REPLACEMENT AT LYNN MASSACHUSETTS
Pricing
Non-member price: $11.50
Member price:
-290040
Get access
-290040
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'FLUIDIZED BED INCINERATOR REPLACEMENT AT LYNN MASSACHUSETTS'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
FLUIDIZED BED INCINERATOR REPLACEMENT AT LYNN MASSACHUSETTS
Abstract
A capital improvements program is underway at the Lynn Regional Wastewater Treatment Facility located in Lynn, Massachusetts, to upgrade aging preliminary treatment and biosolids handling facilities. As part of this program, new dewatering and fluidized bed incinerator (FBI) systems are replacing the existing systems for incineration of dewatered primary and secondary treatment biosolids with ultimate disposal at an onsite ash landfill.This program is being administered under a design/build/operate project delivery format. The design and construction period for the capital improvements program is 34 months and the operating term is 20-years. The project began in the fall of 2001 with new dewatering systems scheduled to be operational in mid 2003, and incinerator and ash handling systems scheduled to be operational in mid 2004.This paper focuses on the residuals and biosolids management facility improvements, beginning with a brief background on the Lynn Regional Wastewater Treatment Facility, followed by a description of the design criteria for the new dewatering and FBI systems, a discussion of the project challenges associated with design, construction, and regulatory approval, and a summary of the major FBI system components.
A capital improvements program is underway at the Lynn Regional Wastewater Treatment Facility located in Lynn, Massachusetts, to upgrade aging preliminary treatment and biosolids handling facilities. As part of this program, new dewatering and fluidized bed incinerator (FBI) systems are replacing the existing systems for incineration of dewatered primary and secondary treatment biosolids with...
Author(s)
Grant E. DaviesClifford L. GreenLouis T. BarryRobert J. Tina
SourceProceedings of the Water Environment Federation
SubjectSession 2 Biosolids Success Stories
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2003
ISSN1938-6478
SICI1938-6478(20030101)2003:1L.150;1-
DOI10.2175/193864703784292089
Volume / Issue2003 / 1
Content sourceResiduals and Biosolids Conference
First / last page(s)150 - 160
Copyright2003
Word count188

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Grant E. Davies# Clifford L. Green# Louis T. Barry# Robert J. Tina. FLUIDIZED BED INCINERATOR REPLACEMENT AT LYNN MASSACHUSETTS. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 28 May. 2025. <https://www.accesswater.org?id=-290040CITANCHOR>.
Grant E. Davies# Clifford L. Green# Louis T. Barry# Robert J. Tina. FLUIDIZED BED INCINERATOR REPLACEMENT AT LYNN MASSACHUSETTS. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed May 28, 2025. https://www.accesswater.org/?id=-290040CITANCHOR.
Grant E. Davies# Clifford L. Green# Louis T. Barry# Robert J. Tina
FLUIDIZED BED INCINERATOR REPLACEMENT AT LYNN MASSACHUSETTS
Access Water
Water Environment Federation
December 22, 2018
May 28, 2025
https://www.accesswater.org/?id=-290040CITANCHOR