LESSONS LEARNED – 21 SANITARY SEWER FAILURE AT THE TRINITY RIVER
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 11:39:38 Adam Phillips
  • 2020-02-01 00:57:01 Administrator
  • 2020-02-01 00:57:00 Administrator
  • 2020-02-01 00:56:59 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
LESSONS LEARNED – 21 SANITARY SEWER FAILURE AT THE TRINITY RIVER

LESSONS LEARNED – 21 SANITARY SEWER FAILURE AT THE TRINITY RIVER

LESSONS LEARNED – 21 SANITARY SEWER FAILURE AT THE TRINITY RIVER

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
LESSONS LEARNED – 21 SANITARY SEWER FAILURE AT THE TRINITY RIVER
Abstract
On May 7, 2001, the south bank of the Trinity River, located in northeast Arlington, Texas, approximately 25 miles west of Dallas, Texas, experienced a massive dish failure and slumped into the river bottom. The failure of the embankment washed away approximately 100 feet of a 21-inch sanitary sewer main. This main carries approximately 1.0 MGD of wastewater to the Trinity River Authority Central Wastewater Treatment System. Arlington Water Utilities Department employees responded immediately and confirmed that the sewer main has been severely damaged from the mudslide. Field Operations Repair Crews (“Crews”) were dispatched, surveyed the situation, and determined that by-pass pumping of the sewer flow around the missing pipe was possible. By-pass pumping equipment was located, delivered, and set-up by the Crews. The Crews were able to contain and by-pass approximately 0.8 MGD flow with 8 hours and 100% of the flow the next day.Due to the location, the need for large construction equipment, and the magnitude of the damage, it was determined that the Crews would be unable to complete permanent repairs and assistance from a pre-qualified utility contractor would be required. On Tuesday, May 8, 2001 Water Department staff met to develop a plan for a permanent repair. Staff identified key tasks that would have to be performed by outside contractors and engineering consultants, and using emergency authority contracted with those parties.Action planning, interdivisional cooperation, and communication with outside parties, allowed Arlington Water Utilities, to respond to numerous potential problems associated with this situation. In addition, this circumstance taught some new lessons and caused established procedures to be modified or changed.
On May 7, 2001, the south bank of the Trinity River, located in northeast Arlington, Texas, approximately 25 miles west of Dallas, Texas, experienced a massive dish failure and slumped into the river bottom. The failure of the embankment washed away approximately 100 feet of a 21-inch sanitary sewer main. This main carries approximately 1.0 MGD of wastewater to the Trinity River Authority Central...
Author(s)
David F. GarciaFiona M. Allen
SourceProceedings of the Water Environment Federation
SubjectSession 78 Collection Systems: Analyze That: Management Opportunities
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2003
ISSN1938-6478
SICI1938-6478(20030101)2003:5L.409;1-
DOI10.2175/193864703784606567
Volume / Issue2003 / 5
Content sourceWEFTEC
First / last page(s)409 - 415
Copyright2003
Word count274

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'LESSONS LEARNED – 21 SANITARY SEWER FAILURE AT THE TRINITY RIVER'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
LESSONS LEARNED – 21 SANITARY SEWER FAILURE AT THE TRINITY RIVER
Pricing
Non-member price: $11.50
Member price:
-290419
Get access
-290419
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'LESSONS LEARNED – 21 SANITARY SEWER FAILURE AT THE TRINITY RIVER'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
LESSONS LEARNED – 21 SANITARY SEWER FAILURE AT THE TRINITY RIVER
Abstract
On May 7, 2001, the south bank of the Trinity River, located in northeast Arlington, Texas, approximately 25 miles west of Dallas, Texas, experienced a massive dish failure and slumped into the river bottom. The failure of the embankment washed away approximately 100 feet of a 21-inch sanitary sewer main. This main carries approximately 1.0 MGD of wastewater to the Trinity River Authority Central Wastewater Treatment System. Arlington Water Utilities Department employees responded immediately and confirmed that the sewer main has been severely damaged from the mudslide. Field Operations Repair Crews (“Crews”) were dispatched, surveyed the situation, and determined that by-pass pumping of the sewer flow around the missing pipe was possible. By-pass pumping equipment was located, delivered, and set-up by the Crews. The Crews were able to contain and by-pass approximately 0.8 MGD flow with 8 hours and 100% of the flow the next day.Due to the location, the need for large construction equipment, and the magnitude of the damage, it was determined that the Crews would be unable to complete permanent repairs and assistance from a pre-qualified utility contractor would be required. On Tuesday, May 8, 2001 Water Department staff met to develop a plan for a permanent repair. Staff identified key tasks that would have to be performed by outside contractors and engineering consultants, and using emergency authority contracted with those parties.Action planning, interdivisional cooperation, and communication with outside parties, allowed Arlington Water Utilities, to respond to numerous potential problems associated with this situation. In addition, this circumstance taught some new lessons and caused established procedures to be modified or changed.
On May 7, 2001, the south bank of the Trinity River, located in northeast Arlington, Texas, approximately 25 miles west of Dallas, Texas, experienced a massive dish failure and slumped into the river bottom. The failure of the embankment washed away approximately 100 feet of a 21-inch sanitary sewer main. This main carries approximately 1.0 MGD of wastewater to the Trinity River Authority Central...
Author(s)
David F. GarciaFiona M. Allen
SourceProceedings of the Water Environment Federation
SubjectSession 78 Collection Systems: Analyze That: Management Opportunities
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2003
ISSN1938-6478
SICI1938-6478(20030101)2003:5L.409;1-
DOI10.2175/193864703784606567
Volume / Issue2003 / 5
Content sourceWEFTEC
First / last page(s)409 - 415
Copyright2003
Word count274

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
David F. Garcia# Fiona M. Allen. LESSONS LEARNED – 21 SANITARY SEWER FAILURE AT THE TRINITY RIVER. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 4 Jul. 2025. <https://www.accesswater.org?id=-290419CITANCHOR>.
David F. Garcia# Fiona M. Allen. LESSONS LEARNED – 21 SANITARY SEWER FAILURE AT THE TRINITY RIVER. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed July 4, 2025. https://www.accesswater.org/?id=-290419CITANCHOR.
David F. Garcia# Fiona M. Allen
LESSONS LEARNED – 21 SANITARY SEWER FAILURE AT THE TRINITY RIVER
Access Water
Water Environment Federation
December 22, 2018
July 4, 2025