lastID = -290916
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Piloting Technologies for Increasing Wet Weather Biological Treatment Capacity at the Indianapolis Belmont AWT Plant
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 18:28:16 Adam Phillips
  • 2020-02-01 03:00:35 Administrator
  • 2020-02-01 03:00:34 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Piloting Technologies for Increasing Wet Weather Biological Treatment Capacity at the Indianapolis Belmont AWT Plant

Piloting Technologies for Increasing Wet Weather Biological Treatment Capacity at the Indianapolis Belmont AWT Plant

Piloting Technologies for Increasing Wet Weather Biological Treatment Capacity at the Indianapolis Belmont AWT Plant

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Piloting Technologies for Increasing Wet Weather Biological Treatment Capacity at the Indianapolis Belmont AWT Plant
Abstract
As part of Combined Sewage Overflow (CSO) control efforts, the City of Indianapolis must increase the peak wet weather treatment capacity at its two advanced wastewater treatment (AWT) plants. 1 To cost effectively meet this requirement, the City considered several technologies for treating the existing primary effluent (P.E.) wet weather bypass and the combined sewer overflow at the headworks of the Belmont AWT plant. Several alternative treatment strategies were considered, and are further described, in the report titled “Combined Sewer Overflow Long Term Control Plan and Water Quality Improvement Report”, dated April 30, 2001 (a.k.a., the draft CSO LTCP).The analysis presented in Appendix A of the draft CSO LTCP assessed the level of treatment necessary to meet water quality standards during CSO events and concluded that the appropriate degree of treatment falls somewhere between advanced primary treatment and full secondary treatment. Moreover, the assessment concluded that nitrification beyond that provided by the existing AWT facility would not be necessary for peak wet weather flows.To treat peak wet weather flows, the City of Indianapolis, Department of Public Works (DPW) is considering the installation of a bio-roughing solids clarification (BRSC) technology that would allow the existing two-stage nitrification system to be uncoupled at its Belmont AWT plant. The project could potentially double the plants wet weather secondary treatment capacity while saving the City tens of millions of dollars over the tertiary treatment option.This paper discusses a unique process for progressively uncoupling an existing two-stage secondary treatment system and piloting technologies for treating bio-roughing effluent. Based on the recommendations of the draft CSO LTCP, the City piloted several technologies (e.g., High Rate Clarification using the Kruger Actiflo. system; High Rate Clarification using the Infilco DensaDeg. system; and Conventional Clarification using a WesTech Solids Contact Clarifier). Bench scale testing for Conventional Clarification was also performed.The paper also describes the piloting efforts performed by the City to develop performance data with which to compare various clarification technologies, and further efforts to develop a recommended treatment process (e.g., the evaluation of a Trickling Filter / Solids Contact process).The technology based treatment and permitting strategies described in this paper and in the draft CSO LTCP are currently under negotiation between the City, the Indiana Department of Environmental Management and U.S. EPA - Region V, and may be applicable to other CSO communities faced with a need to control wet weather discharges.
As part of Combined Sewage Overflow (CSO) control efforts, the City of Indianapolis must increase the peak wet weather treatment capacity at its two advanced wastewater treatment (AWT) plants. 1 To cost effectively meet this requirement, the City considered several technologies for treating the existing primary effluent (P.E.) wet weather bypass and the combined sewer overflow at the headworks of...
Author(s)
K. Andrews MillerCarlton Ray
SourceProceedings of the Water Environment Federation
SubjectSession 23: Wet Weather Treatment Issues
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:14L.167;1-
DOI10.2175/193864704784137666
Volume / Issue2004 / 14
Content sourceWEFTEC
First / last page(s)167 - 186
Copyright2004
Word count409

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Piloting Technologies for Increasing Wet Weather Biological Treatment Capacity at the Indianapolis Belmont AWT Plant'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Piloting Technologies for Increasing Wet Weather Biological Treatment Capacity at the Indianapolis Belmont AWT Plant
Pricing
Non-member price: $11.50
Member price:
-290916
Get access
-290916
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Piloting Technologies for Increasing Wet Weather Biological Treatment Capacity at the Indianapolis Belmont AWT Plant'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Piloting Technologies for Increasing Wet Weather Biological Treatment Capacity at the Indianapolis Belmont AWT Plant
Abstract
As part of Combined Sewage Overflow (CSO) control efforts, the City of Indianapolis must increase the peak wet weather treatment capacity at its two advanced wastewater treatment (AWT) plants. 1 To cost effectively meet this requirement, the City considered several technologies for treating the existing primary effluent (P.E.) wet weather bypass and the combined sewer overflow at the headworks of the Belmont AWT plant. Several alternative treatment strategies were considered, and are further described, in the report titled “Combined Sewer Overflow Long Term Control Plan and Water Quality Improvement Report”, dated April 30, 2001 (a.k.a., the draft CSO LTCP).The analysis presented in Appendix A of the draft CSO LTCP assessed the level of treatment necessary to meet water quality standards during CSO events and concluded that the appropriate degree of treatment falls somewhere between advanced primary treatment and full secondary treatment. Moreover, the assessment concluded that nitrification beyond that provided by the existing AWT facility would not be necessary for peak wet weather flows.To treat peak wet weather flows, the City of Indianapolis, Department of Public Works (DPW) is considering the installation of a bio-roughing solids clarification (BRSC) technology that would allow the existing two-stage nitrification system to be uncoupled at its Belmont AWT plant. The project could potentially double the plants wet weather secondary treatment capacity while saving the City tens of millions of dollars over the tertiary treatment option.This paper discusses a unique process for progressively uncoupling an existing two-stage secondary treatment system and piloting technologies for treating bio-roughing effluent. Based on the recommendations of the draft CSO LTCP, the City piloted several technologies (e.g., High Rate Clarification using the Kruger Actiflo. system; High Rate Clarification using the Infilco DensaDeg. system; and Conventional Clarification using a WesTech Solids Contact Clarifier). Bench scale testing for Conventional Clarification was also performed.The paper also describes the piloting efforts performed by the City to develop performance data with which to compare various clarification technologies, and further efforts to develop a recommended treatment process (e.g., the evaluation of a Trickling Filter / Solids Contact process).The technology based treatment and permitting strategies described in this paper and in the draft CSO LTCP are currently under negotiation between the City, the Indiana Department of Environmental Management and U.S. EPA - Region V, and may be applicable to other CSO communities faced with a need to control wet weather discharges.
As part of Combined Sewage Overflow (CSO) control efforts, the City of Indianapolis must increase the peak wet weather treatment capacity at its two advanced wastewater treatment (AWT) plants. 1 To cost effectively meet this requirement, the City considered several technologies for treating the existing primary effluent (P.E.) wet weather bypass and the combined sewer overflow at the headworks of...
Author(s)
K. Andrews MillerCarlton Ray
SourceProceedings of the Water Environment Federation
SubjectSession 23: Wet Weather Treatment Issues
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:14L.167;1-
DOI10.2175/193864704784137666
Volume / Issue2004 / 14
Content sourceWEFTEC
First / last page(s)167 - 186
Copyright2004
Word count409

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
K. Andrews Miller# Carlton Ray. Piloting Technologies for Increasing Wet Weather Biological Treatment Capacity at the Indianapolis Belmont AWT Plant. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 6 Jun. 2025. <https://www.accesswater.org?id=-290916CITANCHOR>.
K. Andrews Miller# Carlton Ray. Piloting Technologies for Increasing Wet Weather Biological Treatment Capacity at the Indianapolis Belmont AWT Plant. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 6, 2025. https://www.accesswater.org/?id=-290916CITANCHOR.
K. Andrews Miller# Carlton Ray
Piloting Technologies for Increasing Wet Weather Biological Treatment Capacity at the Indianapolis Belmont AWT Plant
Access Water
Water Environment Federation
December 22, 2018
June 6, 2025
https://www.accesswater.org/?id=-290916CITANCHOR