lastID = -291146
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Loading icon
Description: Access Water
Context Menu
Description: Book cover
Reviving A 25 Year Old Fluid Bed Sewage Sludge Incinerator
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 16:38:02 Adam Phillips
  • 2022-05-04 16:38:01 Adam Phillips
  • 2020-03-27 00:49:46 Adam Phillips
  • 2020-03-27 00:49:45 Adam Phillips
  • 2020-02-01 03:51:38 Administrator
  • 2020-02-01 03:51:36 Administrator
  • 2020-02-01 03:51:35 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Reviving A 25 Year Old Fluid Bed Sewage Sludge Incinerator

Reviving A 25 Year Old Fluid Bed Sewage Sludge Incinerator

Reviving A 25 Year Old Fluid Bed Sewage Sludge Incinerator

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Reviving A 25 Year Old Fluid Bed Sewage Sludge Incinerator
Abstract
In the early 1970's, The Gloucester County Utilities Authority installed a fluidized bed incinerator to burn sewage sludge produced at its sewage treatment facility. At the time of installation, fuel oil prices were below 20¢ per gallon. Capital cost was high, so the installation was designed without heat recovery. Wet sludge was pumped into the fluidized sand bed along with sufficient air and oil to complete the incineration process.By the mid 1980's sludge production had increased, and the cold windbox model was struggling to keep up. Preheating of the combustion air was used to improve operation and production rate. Unfortunately, the flat metal plate used for the cold fluidizing air distribution system was limited to a preheated air temperature of 700°F. A shell and tube air preheater using the hot flue gas from the incineration process to heat the combustion air was installed. To avoid fouling, the dirty gas passed downwardly through the tubes while the clean air was passed over the outside of the same tubes.In 1998, even greater capacity was needed from this old incinerator. Replacing the metal air distribution plate with a refractory dome or a high alloy metal plate was impractical since the windbox was too short and uninsulated. An air distribution system used for decades in the oil industry was the solution. The petroleum industry uses a set of parallel perforated pipes to introduce reactant gas into the fluid bed catalytic crackers. Adapting this technology to the cold windbox unit was quite successful. The 8'-6” diameter bed section was widened to 9'-0” to allow room for 8 parallel air pipes. Each pipe was perforated along two lines, 22½° from the bottom center line. The pipes were placed at an elevation such that their air discharge was approximately equal to bubble elevation from the original tuyeres. Preheated air is forced down each pipe-tuyere from a common manifold supported from the incinerator shell.The original metal tuyeres were cut from the plate and the resulting holes welded closed. A layer of insulating castable was applied to the top of the metal plate to protect it from the high temperature of the bed. Several openings were provided to allow air to freely circulate through the abandoned windbox below the metal plate. To increase the preheater air temperature, a taller heat exchanger was installed on the center line of the previous preheater. Minor duct work changes reconnected the flue gas to the venturi scrubber.After more than four years of operation, there are no signs of wear of the new pipe-tuyeres. The predicted capacity increase and fuel reduction were both achieved. As a means of demonstrating the improvement, we evaluated the performance based on the sludge from the present dewatering equipment (23% dry solids).With the cold and warm windbox limitations, much of the available fluidizing air was needed to burn oil just to maintain the minimum bed temperature. By preheating to a higher temperature, that air is now available for burning sludge dry solids.The paper presents detailed photographs of the installation and results of performance evaluations.
In the early 1970's, The Gloucester County Utilities Authority installed a fluidized bed incinerator to burn sewage sludge produced at its sewage treatment facility. At the time of installation, fuel oil prices were below 20¢ per gallon. Capital cost was high, so the installation was designed without heat recovery. Wet sludge was pumped into the fluidized sand bed along with sufficient air...
Author(s)
Louis T. BarryMilton Grundlock
SourceProceedings of the Water Environment Federation
SubjectSession 12: Thermal Technology A
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:1L.661;1-
DOI10.2175/193864704784342668
Volume / Issue2004 / 1
Content sourceResiduals and Biosolids Conference
First / last page(s)661 - 668
Copyright2004
Word count516

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Reviving A 25 Year Old Fluid Bed Sewage Sludge Incinerator'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Reviving A 25 Year Old Fluid Bed Sewage Sludge Incinerator
Pricing
Non-member price: $11.50
Member price:
-291146
Get access
-291146
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Reviving A 25 Year Old Fluid Bed Sewage Sludge Incinerator'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Reviving A 25 Year Old Fluid Bed Sewage Sludge Incinerator
Abstract
In the early 1970's, The Gloucester County Utilities Authority installed a fluidized bed incinerator to burn sewage sludge produced at its sewage treatment facility. At the time of installation, fuel oil prices were below 20¢ per gallon. Capital cost was high, so the installation was designed without heat recovery. Wet sludge was pumped into the fluidized sand bed along with sufficient air and oil to complete the incineration process.By the mid 1980's sludge production had increased, and the cold windbox model was struggling to keep up. Preheating of the combustion air was used to improve operation and production rate. Unfortunately, the flat metal plate used for the cold fluidizing air distribution system was limited to a preheated air temperature of 700°F. A shell and tube air preheater using the hot flue gas from the incineration process to heat the combustion air was installed. To avoid fouling, the dirty gas passed downwardly through the tubes while the clean air was passed over the outside of the same tubes.In 1998, even greater capacity was needed from this old incinerator. Replacing the metal air distribution plate with a refractory dome or a high alloy metal plate was impractical since the windbox was too short and uninsulated. An air distribution system used for decades in the oil industry was the solution. The petroleum industry uses a set of parallel perforated pipes to introduce reactant gas into the fluid bed catalytic crackers. Adapting this technology to the cold windbox unit was quite successful. The 8'-6” diameter bed section was widened to 9'-0” to allow room for 8 parallel air pipes. Each pipe was perforated along two lines, 22½° from the bottom center line. The pipes were placed at an elevation such that their air discharge was approximately equal to bubble elevation from the original tuyeres. Preheated air is forced down each pipe-tuyere from a common manifold supported from the incinerator shell.The original metal tuyeres were cut from the plate and the resulting holes welded closed. A layer of insulating castable was applied to the top of the metal plate to protect it from the high temperature of the bed. Several openings were provided to allow air to freely circulate through the abandoned windbox below the metal plate. To increase the preheater air temperature, a taller heat exchanger was installed on the center line of the previous preheater. Minor duct work changes reconnected the flue gas to the venturi scrubber.After more than four years of operation, there are no signs of wear of the new pipe-tuyeres. The predicted capacity increase and fuel reduction were both achieved. As a means of demonstrating the improvement, we evaluated the performance based on the sludge from the present dewatering equipment (23% dry solids).With the cold and warm windbox limitations, much of the available fluidizing air was needed to burn oil just to maintain the minimum bed temperature. By preheating to a higher temperature, that air is now available for burning sludge dry solids.The paper presents detailed photographs of the installation and results of performance evaluations.
In the early 1970's, The Gloucester County Utilities Authority installed a fluidized bed incinerator to burn sewage sludge produced at its sewage treatment facility. At the time of installation, fuel oil prices were below 20¢ per gallon. Capital cost was high, so the installation was designed without heat recovery. Wet sludge was pumped into the fluidized sand bed along with sufficient air...
Author(s)
Louis T. BarryMilton Grundlock
SourceProceedings of the Water Environment Federation
SubjectSession 12: Thermal Technology A
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:1L.661;1-
DOI10.2175/193864704784342668
Volume / Issue2004 / 1
Content sourceResiduals and Biosolids Conference
First / last page(s)661 - 668
Copyright2004
Word count516

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2025 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Louis T. Barry# Milton Grundlock. Reviving A 25 Year Old Fluid Bed Sewage Sludge Incinerator. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 28 Oct. 2025. <https://www.accesswater.org?id=-291146CITANCHOR>.
Louis T. Barry# Milton Grundlock. Reviving A 25 Year Old Fluid Bed Sewage Sludge Incinerator. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed October 28, 2025. https://www.accesswater.org/?id=-291146CITANCHOR.
Louis T. Barry# Milton Grundlock
Reviving A 25 Year Old Fluid Bed Sewage Sludge Incinerator
Access Water
Water Environment Federation
December 22, 2018
October 28, 2025
https://www.accesswater.org/?id=-291146CITANCHOR