REPLACING A 1940'S CAST IRON PIPE CROSSING A MAJOR RIVER
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:38:37 Adam Phillips
  • 2022-05-04 21:38:36 Adam Phillips
  • 2020-03-26 22:16:03 Adam Phillips
  • 2020-02-01 03:46:21 Administrator
  • 2020-02-01 03:46:20 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
REPLACING A 1940'S CAST IRON PIPE CROSSING A MAJOR RIVER

REPLACING A 1940'S CAST IRON PIPE CROSSING A MAJOR RIVER

REPLACING A 1940'S CAST IRON PIPE CROSSING A MAJOR RIVER

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
REPLACING A 1940'S CAST IRON PIPE CROSSING A MAJOR RIVER
Abstract
When breaks began to occur in an aging 24-inch cast iron subaqueous force main, the utility owner looked for a cost effective replacement. The solution was a combination of pipe materials and installation technologies that could be constructed quickly, while keeping the existing line in continuous service.The cornerstone of the replacement pipeline was a 1,700 linear foot horizontal directional drill (HDD) using 36-inch outside diameter high-density polyethylene (HDPE) pipe. In order to resist the pulling forces during installation, a wall thickness of 3.273 inches (SDR 11) was selected. This resulted in a nominal inside diameter of 29.5 inches. The HDPE pipe was sufficiently flexible to negotiate the tight vertical radii dictated by the available working space on each shore of the river. The pipe was installed more than 40 feet below the mudline of the existing shipping channel and more than 70 feet below the entry and exit points. The HDD crossing was estimated to be 40 percent cheaper than dredge-and-cover construction, and avoided dealing with potentially contaminated river sediments.After the HDD was in place and tested, the “land” portion of the pipe was constructed using ductile iron pipe encased in loose-wrapped polyethylene. A special flange adapter was fabricated to transition between the HDPE and DIP pipes. Much of the “land” pipe was in a busy city street, and some was up to 16 feet deep to safely pass beneath the labyrinth of existing utilities. Extensive dewatering and traffic control were required. The “land” pipe also included a 30-inch direct-bury magnetic flow meter.The final phase was to make the connections to the existing force main on each shore. The connection point on the south shore was made at a relatively new section of ductile iron pipe, and a portion of the existing pipe was abandoned and filled with concrete. On the north shore, the connection was 16 feet deep, and had to be made to a portion of the line that was constructed of concrete pressure pipe. The concrete pipe lay directly beneath a 48-inch storm drain, which even during dry weather was partially full of tidal water. The storm drain had to be temporarily plugged, drained, and removed to accomplish the force main connection below it. The concrete pressure pipe was pulled apart at the nearest joint and connected to the new DIP with a fabricated adapter. The existing line between the tie-in point and the river was lined with a cured-in-place “sock” that was used to hold the concrete fill.The new pipeline was successfully completed and has been in service for approximately 12 months.
When breaks began to occur in an aging 24-inch cast iron subaqueous force main, the utility owner looked for a cost effective replacement. The solution was a combination of pipe materials and installation technologies that could be constructed quickly, while keeping the existing line in continuous service.The cornerstone of the replacement pipeline was a 1,700 linear foot horizontal directional...
Author(s)
Thomas B. TraskD. Randolph GrubbsP. Troy McPherson
SourceProceedings of the Water Environment Federation
SubjectSession 3: Dynamic Rehabilitation Projects
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:5L.209;1-
DOI10.2175/193864704784107001
Volume / Issue2004 / 5
Content sourceCollection Systems Conference
First / last page(s)209 - 222
Copyright2004
Word count436

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'REPLACING A 1940'S CAST IRON PIPE CROSSING A MAJOR RIVER'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
REPLACING A 1940'S CAST IRON PIPE CROSSING A MAJOR RIVER
Pricing
Non-member price: $11.50
Member price:
-291434
Get access
-291434
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'REPLACING A 1940'S CAST IRON PIPE CROSSING A MAJOR RIVER'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
REPLACING A 1940'S CAST IRON PIPE CROSSING A MAJOR RIVER
Abstract
When breaks began to occur in an aging 24-inch cast iron subaqueous force main, the utility owner looked for a cost effective replacement. The solution was a combination of pipe materials and installation technologies that could be constructed quickly, while keeping the existing line in continuous service.The cornerstone of the replacement pipeline was a 1,700 linear foot horizontal directional drill (HDD) using 36-inch outside diameter high-density polyethylene (HDPE) pipe. In order to resist the pulling forces during installation, a wall thickness of 3.273 inches (SDR 11) was selected. This resulted in a nominal inside diameter of 29.5 inches. The HDPE pipe was sufficiently flexible to negotiate the tight vertical radii dictated by the available working space on each shore of the river. The pipe was installed more than 40 feet below the mudline of the existing shipping channel and more than 70 feet below the entry and exit points. The HDD crossing was estimated to be 40 percent cheaper than dredge-and-cover construction, and avoided dealing with potentially contaminated river sediments.After the HDD was in place and tested, the “land” portion of the pipe was constructed using ductile iron pipe encased in loose-wrapped polyethylene. A special flange adapter was fabricated to transition between the HDPE and DIP pipes. Much of the “land” pipe was in a busy city street, and some was up to 16 feet deep to safely pass beneath the labyrinth of existing utilities. Extensive dewatering and traffic control were required. The “land” pipe also included a 30-inch direct-bury magnetic flow meter.The final phase was to make the connections to the existing force main on each shore. The connection point on the south shore was made at a relatively new section of ductile iron pipe, and a portion of the existing pipe was abandoned and filled with concrete. On the north shore, the connection was 16 feet deep, and had to be made to a portion of the line that was constructed of concrete pressure pipe. The concrete pipe lay directly beneath a 48-inch storm drain, which even during dry weather was partially full of tidal water. The storm drain had to be temporarily plugged, drained, and removed to accomplish the force main connection below it. The concrete pressure pipe was pulled apart at the nearest joint and connected to the new DIP with a fabricated adapter. The existing line between the tie-in point and the river was lined with a cured-in-place “sock” that was used to hold the concrete fill.The new pipeline was successfully completed and has been in service for approximately 12 months.
When breaks began to occur in an aging 24-inch cast iron subaqueous force main, the utility owner looked for a cost effective replacement. The solution was a combination of pipe materials and installation technologies that could be constructed quickly, while keeping the existing line in continuous service.The cornerstone of the replacement pipeline was a 1,700 linear foot horizontal directional...
Author(s)
Thomas B. TraskD. Randolph GrubbsP. Troy McPherson
SourceProceedings of the Water Environment Federation
SubjectSession 3: Dynamic Rehabilitation Projects
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:5L.209;1-
DOI10.2175/193864704784107001
Volume / Issue2004 / 5
Content sourceCollection Systems Conference
First / last page(s)209 - 222
Copyright2004
Word count436

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Thomas B. Trask# D. Randolph Grubbs# P. Troy McPherson. REPLACING A 1940'S CAST IRON PIPE CROSSING A MAJOR RIVER. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 1 Jul. 2025. <https://www.accesswater.org?id=-291434CITANCHOR>.
Thomas B. Trask# D. Randolph Grubbs# P. Troy McPherson. REPLACING A 1940'S CAST IRON PIPE CROSSING A MAJOR RIVER. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed July 1, 2025. https://www.accesswater.org/?id=-291434CITANCHOR.
Thomas B. Trask# D. Randolph Grubbs# P. Troy McPherson
REPLACING A 1940'S CAST IRON PIPE CROSSING A MAJOR RIVER
Access Water
Water Environment Federation
December 22, 2018
July 1, 2025