lastID = -291863
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Loading icon
Description: Access Water
Context Menu
Description: Book cover
RECONFIGURATION OF AN INDUSTRIAL WASTEWATER TREATMENT SYSTEM FOR PCB, PHENOL, ZINC, AND SUSPENDED SOLIDS REMOVAL AND INSTALLATION OF A BIOLOGICAL LEACHATE TREATMENT SYSTEM AT A FORMER VISCOSE RAYON PRODUCTION FACILITY
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 13:00:36 Adam Phillips
  • 2022-05-06 13:00:34 Adam Phillips
  • 2020-03-23 13:51:40 Administrator
  • 2020-03-23 13:51:39 Administrator
  • 2020-02-01 03:34:43 Administrator
  • 2020-02-01 03:34:42 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
RECONFIGURATION OF AN INDUSTRIAL WASTEWATER TREATMENT SYSTEM FOR PCB, PHENOL, ZINC, AND SUSPENDED SOLIDS REMOVAL AND INSTALLATION OF A BIOLOGICAL LEACHATE TREATMENT SYSTEM AT A FORMER VISCOSE RAYON PRODUCTION FACILITY

RECONFIGURATION OF AN INDUSTRIAL WASTEWATER TREATMENT SYSTEM FOR PCB, PHENOL, ZINC, AND SUSPENDED SOLIDS REMOVAL AND INSTALLATION OF A BIOLOGICAL LEACHATE TREATMENT SYSTEM AT A FORMER VISCOSE RAYON PRODUCTION FACILITY

RECONFIGURATION OF AN INDUSTRIAL WASTEWATER TREATMENT SYSTEM FOR PCB, PHENOL, ZINC, AND SUSPENDED SOLIDS REMOVAL AND INSTALLATION OF A BIOLOGICAL LEACHATE TREATMENT SYSTEM AT A FORMER VISCOSE RAYON PRODUCTION FACILITY

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
RECONFIGURATION OF AN INDUSTRIAL WASTEWATER TREATMENT SYSTEM FOR PCB, PHENOL, ZINC, AND SUSPENDED SOLIDS REMOVAL AND INSTALLATION OF A BIOLOGICAL LEACHATE TREATMENT SYSTEM AT A FORMER VISCOSE RAYON PRODUCTION FACILITY
Abstract
After the shutdown of a former viscose rayon fiber production facility, all impounded surface water and runoff (wastewater) from the site was deemed impacted, requiring the installation of continuous treatment prior to discharge to the river. Discharge criteria for the wastewater treatment plant (WWTP) outfall are specified in a Superfund Administrative Order and dictate compliance with limits for several heavy metals, total suspended solids (TSS), biochemical oxygen demand (BOD), phenol, polychlorinated biphenyls (PCBs) and pH. The influent wastewater is collected in several large surface impoundments, some of which contain large quantities of residual lime precipitation- neutralization sludge from a treatment facility that was used when the rayon plant was active. The influent constituents of concern include PCBs, zinc, phenol and suspended solids. Generally, these wastewater sources contain relatively low concentrations of organic contaminants (low BOD). Over time, the WWTP has been upgraded and retrofitted to improve system performance, to enhance stability and operability and to meet the demand of changing influent characteristics and flow rates. Currently, the WWTP is designed for a peak throughput of approximately 1.0 MGD; however, the plant tends to be operated as needed, based on weather conditions. A biological process was also installed following a large equalization basin to treat a relatively low flow rate (5-50 gpm) of concentrated leachate that is derived from several surface impoundments containing waste material produced by the viscose process itself. This leachate is contaminated with high levels of sulfide (HS−) and carbonaceous organic contaminants (BOD), presumed to be primarily soluble cellulose, and lower levels of phenol and carbon disulfide (CS2). The biological treatment system discharges treated effluent to the large surface impoundments for subsequent treatment through the WWTP with other site wastewater sources. Thus, the objectives of biological treatment include oxidation of reduced sulfur compounds to control ambient odor and CS2 emissions and removal of a portion of the readily biodegradable organic material to ensure that the final WWTP effluent BOD limit is achieved (in particular during dry conditions).
After the shutdown of a former viscose rayon fiber production facility, all impounded surface water and runoff (wastewater) from the site was deemed impacted, requiring the installation of continuous treatment prior to discharge to the river. Discharge criteria for the wastewater treatment plant (WWTP) outfall are specified in a Superfund Administrative Order and dictate compliance with limits for...
Author(s)
Leslie J. PlazioCharles B. BottJason C. RushingMichael F. SteinerJoel C. Plauger
SourceProceedings of the Water Environment Federation
SubjectSession 49: Industrial Issues & Treatment Technology: Treatment Challenges: Perchlorate, Explosives and Leachates
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:12L.3993;1-
DOI10.2175/193864705783865938
Volume / Issue2005 / 12
Content sourceWEFTEC
First / last page(s)3993 - 4002
Copyright2005
Word count360

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'RECONFIGURATION OF AN INDUSTRIAL WASTEWATER TREATMENT SYSTEM FOR PCB, PHENOL, ZINC, AND SUSPENDED SOLIDS REMOVAL AND INSTALLATION OF A BIOLOGICAL LEACHATE TREATMENT SYSTEM AT A FORMER VISCOSE RAYON PRODUCTION FACILITY'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
RECONFIGURATION OF AN INDUSTRIAL WASTEWATER TREATMENT SYSTEM FOR PCB, PHENOL, ZINC, AND SUSPENDED SOLIDS REMOVAL AND INSTALLATION OF A BIOLOGICAL LEACHATE TREATMENT SYSTEM AT A FORMER VISCOSE RAYON PRODUCTION FACILITY
Pricing
Non-member price: $11.50
Member price:
-291863
Get access
-291863
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'RECONFIGURATION OF AN INDUSTRIAL WASTEWATER TREATMENT SYSTEM FOR PCB, PHENOL, ZINC, AND SUSPENDED SOLIDS REMOVAL AND INSTALLATION OF A BIOLOGICAL LEACHATE TREATMENT SYSTEM AT A FORMER VISCOSE RAYON PRODUCTION FACILITY'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
RECONFIGURATION OF AN INDUSTRIAL WASTEWATER TREATMENT SYSTEM FOR PCB, PHENOL, ZINC, AND SUSPENDED SOLIDS REMOVAL AND INSTALLATION OF A BIOLOGICAL LEACHATE TREATMENT SYSTEM AT A FORMER VISCOSE RAYON PRODUCTION FACILITY
Abstract
After the shutdown of a former viscose rayon fiber production facility, all impounded surface water and runoff (wastewater) from the site was deemed impacted, requiring the installation of continuous treatment prior to discharge to the river. Discharge criteria for the wastewater treatment plant (WWTP) outfall are specified in a Superfund Administrative Order and dictate compliance with limits for several heavy metals, total suspended solids (TSS), biochemical oxygen demand (BOD), phenol, polychlorinated biphenyls (PCBs) and pH. The influent wastewater is collected in several large surface impoundments, some of which contain large quantities of residual lime precipitation- neutralization sludge from a treatment facility that was used when the rayon plant was active. The influent constituents of concern include PCBs, zinc, phenol and suspended solids. Generally, these wastewater sources contain relatively low concentrations of organic contaminants (low BOD). Over time, the WWTP has been upgraded and retrofitted to improve system performance, to enhance stability and operability and to meet the demand of changing influent characteristics and flow rates. Currently, the WWTP is designed for a peak throughput of approximately 1.0 MGD; however, the plant tends to be operated as needed, based on weather conditions. A biological process was also installed following a large equalization basin to treat a relatively low flow rate (5-50 gpm) of concentrated leachate that is derived from several surface impoundments containing waste material produced by the viscose process itself. This leachate is contaminated with high levels of sulfide (HS−) and carbonaceous organic contaminants (BOD), presumed to be primarily soluble cellulose, and lower levels of phenol and carbon disulfide (CS2). The biological treatment system discharges treated effluent to the large surface impoundments for subsequent treatment through the WWTP with other site wastewater sources. Thus, the objectives of biological treatment include oxidation of reduced sulfur compounds to control ambient odor and CS2 emissions and removal of a portion of the readily biodegradable organic material to ensure that the final WWTP effluent BOD limit is achieved (in particular during dry conditions).
After the shutdown of a former viscose rayon fiber production facility, all impounded surface water and runoff (wastewater) from the site was deemed impacted, requiring the installation of continuous treatment prior to discharge to the river. Discharge criteria for the wastewater treatment plant (WWTP) outfall are specified in a Superfund Administrative Order and dictate compliance with limits for...
Author(s)
Leslie J. PlazioCharles B. BottJason C. RushingMichael F. SteinerJoel C. Plauger
SourceProceedings of the Water Environment Federation
SubjectSession 49: Industrial Issues & Treatment Technology: Treatment Challenges: Perchlorate, Explosives and Leachates
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:12L.3993;1-
DOI10.2175/193864705783865938
Volume / Issue2005 / 12
Content sourceWEFTEC
First / last page(s)3993 - 4002
Copyright2005
Word count360

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2025 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Leslie J. Plazio# Charles B. Bott# Jason C. Rushing# Michael F. Steiner# Joel C. Plauger. RECONFIGURATION OF AN INDUSTRIAL WASTEWATER TREATMENT SYSTEM FOR PCB, PHENOL, ZINC, AND SUSPENDED SOLIDS REMOVAL AND INSTALLATION OF A BIOLOGICAL LEACHATE TREATMENT SYSTEM AT A FORMER VISCOSE RAYON PRODUCTION FACILITY. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 1 Nov. 2025. <https://www.accesswater.org?id=-291863CITANCHOR>.
Leslie J. Plazio# Charles B. Bott# Jason C. Rushing# Michael F. Steiner# Joel C. Plauger. RECONFIGURATION OF AN INDUSTRIAL WASTEWATER TREATMENT SYSTEM FOR PCB, PHENOL, ZINC, AND SUSPENDED SOLIDS REMOVAL AND INSTALLATION OF A BIOLOGICAL LEACHATE TREATMENT SYSTEM AT A FORMER VISCOSE RAYON PRODUCTION FACILITY. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed November 1, 2025. https://www.accesswater.org/?id=-291863CITANCHOR.
Leslie J. Plazio# Charles B. Bott# Jason C. Rushing# Michael F. Steiner# Joel C. Plauger
RECONFIGURATION OF AN INDUSTRIAL WASTEWATER TREATMENT SYSTEM FOR PCB, PHENOL, ZINC, AND SUSPENDED SOLIDS REMOVAL AND INSTALLATION OF A BIOLOGICAL LEACHATE TREATMENT SYSTEM AT A FORMER VISCOSE RAYON PRODUCTION FACILITY
Access Water
Water Environment Federation
December 22, 2018
November 1, 2025
https://www.accesswater.org/?id=-291863CITANCHOR