lastID = -292436
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
EFFECTIVE I/I REMOVAL WITH FOOTING DRAIN DISCONNECTION AS A SOLUTION FOR SSO AND BASEMENT FLOODING
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:22:35 Adam Phillips
  • 2022-05-04 21:22:34 Adam Phillips
  • 2020-03-26 22:13:38 Adam Phillips
  • 2020-03-26 22:13:37 Adam Phillips
  • 2020-01-31 22:19:55 Administrator
  • 2020-01-31 22:19:54 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
EFFECTIVE I/I REMOVAL WITH FOOTING DRAIN DISCONNECTION AS A SOLUTION FOR SSO AND BASEMENT FLOODING

EFFECTIVE I/I REMOVAL WITH FOOTING DRAIN DISCONNECTION AS A SOLUTION FOR SSO AND BASEMENT FLOODING

EFFECTIVE I/I REMOVAL WITH FOOTING DRAIN DISCONNECTION AS A SOLUTION FOR SSO AND BASEMENT FLOODING

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
EFFECTIVE I/I REMOVAL WITH FOOTING DRAIN DISCONNECTION AS A SOLUTION FOR SSO AND BASEMENT FLOODING
Abstract
Many communities are actively seeking ways to control the excessive inflow and infiltration (I/I) that plague their sewer systems. This wet weather flow can cause sanitary sewer overflows (SSOs) and basement flooding, when affecting sewer systems with insufficient flow capacities.Residents of the city of Ann Arbor, Michigan (population 114,775) have experienced basement backup problems dating back to 1968. Additional widespread backup events occurred in 1975, 1976, 1998, and 2000. Ann Arbor created a task force in 1999 to evaluate options and determine a plan for preventing basement backups and SSOs. The group consisted of city staff, residents from the affected areas, local environmental organizations, and professionals. The task force found that capacity problems observed in many of the sanitary sewers were primarily the result of stormwater from foundation footing drains located around residential structures. While solutions such as storage basins and increased collection system capacity were reviewed, source control via footing drain disconnection was selected for citywide application.The footing drain disconnection (FDD) program began in 2001 as the preferred solution to reducing the primary source of I/I to the city's sewer system. The FDD program is coordinated by a construction management team, consisting of city staff and a consultant. Contractors are involved in two phases of the work. First, a directional drilling company installs a shallow high density polyethylene (HDPE) drainage pipe network (curb drains) to accept sump pump flows from individual residences and transport the water to the storm drain system. Then, a pre-qualified plumbing contractor team works in individual residences to disconnect the footing drains, install new sump pump systems, and connect the sump pumps to the new curb drains.A key element of this program is the public engagement activities, without which the program would not have gained public acceptance of the work. For participating property owners, the FDD program includes such informational materials as information packets, newsletters, a project Web site, and video. Neighborhood meetings are held, with 15 to 30 properties per grouping, followed by one-on-one meetings at each property between the construction manager and property owner to review their basement configuration and explain all of the remaining program steps.Another aspect of the project is ongoing validation of the flows generated by the new sump pump discharges. Initial work has shown average dry weather I/I flows around 0.01 gallons per minute (gpm). Peak wet weather footing drain flows at single residences have been measured over 30 gpm, with average peak flows exceeding 2.0 gpm during the largest rain events. The city of Ann Arbor is continuing to use the footing drain flow data, along with a citywide sanitary sewer model, to prioritize future FDD work areas and project long-term deficiencies. A total of 500 properties have been completed since 2001 and the FDD program may continue for the next 20 to 30 years to perform the projected total of 20,000 residential disconnections required throughout the city.
Many communities are actively seeking ways to control the excessive inflow and infiltration (I/I) that plague their sewer systems. This wet weather flow can cause sanitary sewer overflows (SSOs) and basement flooding, when affecting sewer systems with insufficient flow capacities.Residents of the city of Ann Arbor, Michigan (population 114,775) have experienced basement backup problems dating back...
Author(s)
Jason R. ZawackiIgor KotlyarBenjamin J. ShermanMark J. TenBroek
SourceProceedings of the Water Environment Federation
SubjectSession 10: I/I Deposition, and Delivery: Changing Your Approach
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:4L.683;1-
DOI10.2175/193864705784291321
Volume / Issue2005 / 4
Content sourceCollection Systems Conference
First / last page(s)683 - 696
Copyright2005
Word count495

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'EFFECTIVE I/I REMOVAL WITH FOOTING DRAIN DISCONNECTION AS A SOLUTION FOR SSO AND BASEMENT FLOODING'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
EFFECTIVE I/I REMOVAL WITH FOOTING DRAIN DISCONNECTION AS A SOLUTION FOR SSO AND BASEMENT FLOODING
Pricing
Non-member price: $11.50
Member price:
-292436
Get access
-292436
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'EFFECTIVE I/I REMOVAL WITH FOOTING DRAIN DISCONNECTION AS A SOLUTION FOR SSO AND BASEMENT FLOODING'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
EFFECTIVE I/I REMOVAL WITH FOOTING DRAIN DISCONNECTION AS A SOLUTION FOR SSO AND BASEMENT FLOODING
Abstract
Many communities are actively seeking ways to control the excessive inflow and infiltration (I/I) that plague their sewer systems. This wet weather flow can cause sanitary sewer overflows (SSOs) and basement flooding, when affecting sewer systems with insufficient flow capacities.Residents of the city of Ann Arbor, Michigan (population 114,775) have experienced basement backup problems dating back to 1968. Additional widespread backup events occurred in 1975, 1976, 1998, and 2000. Ann Arbor created a task force in 1999 to evaluate options and determine a plan for preventing basement backups and SSOs. The group consisted of city staff, residents from the affected areas, local environmental organizations, and professionals. The task force found that capacity problems observed in many of the sanitary sewers were primarily the result of stormwater from foundation footing drains located around residential structures. While solutions such as storage basins and increased collection system capacity were reviewed, source control via footing drain disconnection was selected for citywide application.The footing drain disconnection (FDD) program began in 2001 as the preferred solution to reducing the primary source of I/I to the city's sewer system. The FDD program is coordinated by a construction management team, consisting of city staff and a consultant. Contractors are involved in two phases of the work. First, a directional drilling company installs a shallow high density polyethylene (HDPE) drainage pipe network (curb drains) to accept sump pump flows from individual residences and transport the water to the storm drain system. Then, a pre-qualified plumbing contractor team works in individual residences to disconnect the footing drains, install new sump pump systems, and connect the sump pumps to the new curb drains.A key element of this program is the public engagement activities, without which the program would not have gained public acceptance of the work. For participating property owners, the FDD program includes such informational materials as information packets, newsletters, a project Web site, and video. Neighborhood meetings are held, with 15 to 30 properties per grouping, followed by one-on-one meetings at each property between the construction manager and property owner to review their basement configuration and explain all of the remaining program steps.Another aspect of the project is ongoing validation of the flows generated by the new sump pump discharges. Initial work has shown average dry weather I/I flows around 0.01 gallons per minute (gpm). Peak wet weather footing drain flows at single residences have been measured over 30 gpm, with average peak flows exceeding 2.0 gpm during the largest rain events. The city of Ann Arbor is continuing to use the footing drain flow data, along with a citywide sanitary sewer model, to prioritize future FDD work areas and project long-term deficiencies. A total of 500 properties have been completed since 2001 and the FDD program may continue for the next 20 to 30 years to perform the projected total of 20,000 residential disconnections required throughout the city.
Many communities are actively seeking ways to control the excessive inflow and infiltration (I/I) that plague their sewer systems. This wet weather flow can cause sanitary sewer overflows (SSOs) and basement flooding, when affecting sewer systems with insufficient flow capacities.Residents of the city of Ann Arbor, Michigan (population 114,775) have experienced basement backup problems dating back...
Author(s)
Jason R. ZawackiIgor KotlyarBenjamin J. ShermanMark J. TenBroek
SourceProceedings of the Water Environment Federation
SubjectSession 10: I/I Deposition, and Delivery: Changing Your Approach
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:4L.683;1-
DOI10.2175/193864705784291321
Volume / Issue2005 / 4
Content sourceCollection Systems Conference
First / last page(s)683 - 696
Copyright2005
Word count495

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Jason R. Zawacki# Igor Kotlyar# Benjamin J. Sherman# Mark J. TenBroek. EFFECTIVE I/I REMOVAL WITH FOOTING DRAIN DISCONNECTION AS A SOLUTION FOR SSO AND BASEMENT FLOODING. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 7 Jun. 2025. <https://www.accesswater.org?id=-292436CITANCHOR>.
Jason R. Zawacki# Igor Kotlyar# Benjamin J. Sherman# Mark J. TenBroek. EFFECTIVE I/I REMOVAL WITH FOOTING DRAIN DISCONNECTION AS A SOLUTION FOR SSO AND BASEMENT FLOODING. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 7, 2025. https://www.accesswater.org/?id=-292436CITANCHOR.
Jason R. Zawacki# Igor Kotlyar# Benjamin J. Sherman# Mark J. TenBroek
EFFECTIVE I/I REMOVAL WITH FOOTING DRAIN DISCONNECTION AS A SOLUTION FOR SSO AND BASEMENT FLOODING
Access Water
Water Environment Federation
December 22, 2018
June 7, 2025
https://www.accesswater.org/?id=-292436CITANCHOR