lastID = -292540
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
DEVELOPMENT OF A SEWAGE EQUALIZATION SYSTEM TO REGULATE BUILDING SEWAGE FLOW AND CONTROL ODOR
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-01-31 21:59:02 Administrator
  • 2020-01-31 21:59:01 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
DEVELOPMENT OF A SEWAGE EQUALIZATION SYSTEM TO REGULATE BUILDING SEWAGE FLOW AND CONTROL ODOR

DEVELOPMENT OF A SEWAGE EQUALIZATION SYSTEM TO REGULATE BUILDING SEWAGE FLOW AND CONTROL ODOR

DEVELOPMENT OF A SEWAGE EQUALIZATION SYSTEM TO REGULATE BUILDING SEWAGE FLOW AND CONTROL ODOR

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
DEVELOPMENT OF A SEWAGE EQUALIZATION SYSTEM TO REGULATE BUILDING SEWAGE FLOW AND CONTROL ODOR
Abstract
In Japan's large cities, many large buildings are constructed on building sites of limited size. Without appropriate mitigation, sewage flow from these buildings would exceed the existing public sewer capacity. In response, Tokyo Metropolitan Government has advised that large buildings must have a chamber installed for the temporary storage of sewage during peak production times. These excess-flow regulating chambers store excess flow during the day and drain it to the public sewer at night when there is capacity in the sewerage system. However, storage of sewage for long periods of time generates hydrogen sulfide, resulting in the emission of offensive odors. We conducted a survey of buildings producing large sewage volumes and confirmed that the sewage flow rate displays large fluctuations over short periods of time. We therefore developed a sewage equalization system that stores sewage temporarily when the flow rate exceeds the prescribed flow rate and discharges it as soon as the flow subsides, thereby shortening the storage time and reducing the build-up of offensive odor. Verification tests carried out on an existing building confirmed that the sewage equalization system is capable of lowering the peak discharge rate from large buildings and preventing hydrogen sulfide production. It was confirmed that the system can be smaller and the initial and running costs lower than for a conventional excess-flow regulating chamber.
In Japan's large cities, many large buildings are constructed on building sites of limited size. Without appropriate mitigation, sewage flow from these buildings would exceed the existing public sewer capacity. In response, Tokyo Metropolitan Government has advised that large buildings must have a chamber installed for the temporary storage of sewage during peak production times. These excess-flow...
Author(s)
Hiroshi KouchiwaMitsuhisa AmanoHiroki Kondo
SourceProceedings of the Water Environment Federation
SubjectSession 106: Facility Operations Including Lab Practices: Operating Under Variable Flow Conditions
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:6L.8556;1-
DOI10.2175/193864705783812936
Volume / Issue2005 / 6
Content sourceWEFTEC
First / last page(s)8556 - 8577
Copyright2005
Word count234

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'DEVELOPMENT OF A SEWAGE EQUALIZATION SYSTEM TO REGULATE BUILDING SEWAGE FLOW AND CONTROL ODOR'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
DEVELOPMENT OF A SEWAGE EQUALIZATION SYSTEM TO REGULATE BUILDING SEWAGE FLOW AND CONTROL ODOR
Pricing
Non-member price: $11.50
Member price:
-292540
Get access
-292540
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'DEVELOPMENT OF A SEWAGE EQUALIZATION SYSTEM TO REGULATE BUILDING SEWAGE FLOW AND CONTROL ODOR'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
DEVELOPMENT OF A SEWAGE EQUALIZATION SYSTEM TO REGULATE BUILDING SEWAGE FLOW AND CONTROL ODOR
Abstract
In Japan's large cities, many large buildings are constructed on building sites of limited size. Without appropriate mitigation, sewage flow from these buildings would exceed the existing public sewer capacity. In response, Tokyo Metropolitan Government has advised that large buildings must have a chamber installed for the temporary storage of sewage during peak production times. These excess-flow regulating chambers store excess flow during the day and drain it to the public sewer at night when there is capacity in the sewerage system. However, storage of sewage for long periods of time generates hydrogen sulfide, resulting in the emission of offensive odors. We conducted a survey of buildings producing large sewage volumes and confirmed that the sewage flow rate displays large fluctuations over short periods of time. We therefore developed a sewage equalization system that stores sewage temporarily when the flow rate exceeds the prescribed flow rate and discharges it as soon as the flow subsides, thereby shortening the storage time and reducing the build-up of offensive odor. Verification tests carried out on an existing building confirmed that the sewage equalization system is capable of lowering the peak discharge rate from large buildings and preventing hydrogen sulfide production. It was confirmed that the system can be smaller and the initial and running costs lower than for a conventional excess-flow regulating chamber.
In Japan's large cities, many large buildings are constructed on building sites of limited size. Without appropriate mitigation, sewage flow from these buildings would exceed the existing public sewer capacity. In response, Tokyo Metropolitan Government has advised that large buildings must have a chamber installed for the temporary storage of sewage during peak production times. These excess-flow...
Author(s)
Hiroshi KouchiwaMitsuhisa AmanoHiroki Kondo
SourceProceedings of the Water Environment Federation
SubjectSession 106: Facility Operations Including Lab Practices: Operating Under Variable Flow Conditions
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:6L.8556;1-
DOI10.2175/193864705783812936
Volume / Issue2005 / 6
Content sourceWEFTEC
First / last page(s)8556 - 8577
Copyright2005
Word count234

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Hiroshi Kouchiwa# Mitsuhisa Amano# Hiroki Kondo. DEVELOPMENT OF A SEWAGE EQUALIZATION SYSTEM TO REGULATE BUILDING SEWAGE FLOW AND CONTROL ODOR. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 7 Jun. 2025. <https://www.accesswater.org?id=-292540CITANCHOR>.
Hiroshi Kouchiwa# Mitsuhisa Amano# Hiroki Kondo. DEVELOPMENT OF A SEWAGE EQUALIZATION SYSTEM TO REGULATE BUILDING SEWAGE FLOW AND CONTROL ODOR. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 7, 2025. https://www.accesswater.org/?id=-292540CITANCHOR.
Hiroshi Kouchiwa# Mitsuhisa Amano# Hiroki Kondo
DEVELOPMENT OF A SEWAGE EQUALIZATION SYSTEM TO REGULATE BUILDING SEWAGE FLOW AND CONTROL ODOR
Access Water
Water Environment Federation
December 22, 2018
June 7, 2025
https://www.accesswater.org/?id=-292540CITANCHOR