lastID = -293215
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Siting New Odor and Corrosion Control Facilities for Brightwater Conveyance System
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-03-27 00:03:44 Adam Phillips
  • 2020-02-01 04:15:25 Administrator
  • 2020-02-01 04:15:24 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Siting New Odor and Corrosion Control Facilities for Brightwater Conveyance System

Siting New Odor and Corrosion Control Facilities for Brightwater Conveyance System

Siting New Odor and Corrosion Control Facilities for Brightwater Conveyance System

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Siting New Odor and Corrosion Control Facilities for Brightwater Conveyance System
Abstract
King County is constructing a new treatment plant and conveyance system for a rapidly growing part of its service area. The new conveyance system will divert flows away from two existing interceptors (Swamp Creek and North Creek) to a new 2.2-mile influent tunnel that will drain by gravity to a new influent pump station. The pump station will pump the flow 2.6 miles and lift it 235 vertical feet through two parallel force mains to the new treatment plant, as shown in Figure 1.King County policy states that no odors will be detectable at the fence line for any of its facilities. The detectable threshold is defined as 3 dilutions to threshold for all odors. King County also requires a hydrogen sulfide (H2S) removal efficiency of 99.9 percent. To achieve these goals for the new conveyance system, King County needed to identify potential off-gassing points in the new conveyance system, quantify the foul air that could be released to the environment, characterize the wastewater quality, select appropriate technology, and site the odor control facilities.After initial review of existing data for the Brightwater tributary conveyance system, it was determined that there was insufficient data to predict concentrations of odorous compounds upon which to base the sizing of odor control equipment. Therefore King County initiated a two-year sampling and monitoring study of the future Brightwater tributaries. Sampling and monitoring sites were selected based on either their proximity to the future Brightwater connections or their appropriateness for characterizing upstream flow conditions. This paper describes the wastewater and air quality parameters monitored and the analysis of monitoring results. It discusses how a sampling and monitoring program was used to select, size, and locate new odor and corrosion control technologies for the Brightwater conveyance system. Odor control technologies selected for the conveyance system included carbon adsorption, bioscrubbers, and chemical injection at various points within the conveyance system.
King County is constructing a new treatment plant and conveyance system for a rapidly growing part of its service area. The new conveyance system will divert flows away from two existing interceptors (Swamp Creek and North Creek) to a new 2.2-mile influent tunnel that will drain by gravity to a new influent pump station. The pump station will pump the flow 2.6 miles and lift it 235 vertical feet...
Author(s)
Bruce BallBrownCaldwell
SourceProceedings of the Water Environment Federation
SubjectSession 2: Collection System Odors and Corrosion
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2006
ISSN1938-6478
SICI1938-6478(20060101)2006:3L.128;1-
DOI10.2175/193864706783791254
Volume / Issue2006 / 3
Content sourceOdors and Air Pollutants Conference
First / last page(s)128 - 157
Copyright2006
Word count324

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Siting New Odor and Corrosion Control Facilities for Brightwater Conveyance System'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Siting New Odor and Corrosion Control Facilities for Brightwater Conveyance System
Pricing
Non-member price: $11.50
Member price:
-293215
Get access
-293215
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Siting New Odor and Corrosion Control Facilities for Brightwater Conveyance System'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Siting New Odor and Corrosion Control Facilities for Brightwater Conveyance System
Abstract
King County is constructing a new treatment plant and conveyance system for a rapidly growing part of its service area. The new conveyance system will divert flows away from two existing interceptors (Swamp Creek and North Creek) to a new 2.2-mile influent tunnel that will drain by gravity to a new influent pump station. The pump station will pump the flow 2.6 miles and lift it 235 vertical feet through two parallel force mains to the new treatment plant, as shown in Figure 1.King County policy states that no odors will be detectable at the fence line for any of its facilities. The detectable threshold is defined as 3 dilutions to threshold for all odors. King County also requires a hydrogen sulfide (H2S) removal efficiency of 99.9 percent. To achieve these goals for the new conveyance system, King County needed to identify potential off-gassing points in the new conveyance system, quantify the foul air that could be released to the environment, characterize the wastewater quality, select appropriate technology, and site the odor control facilities.After initial review of existing data for the Brightwater tributary conveyance system, it was determined that there was insufficient data to predict concentrations of odorous compounds upon which to base the sizing of odor control equipment. Therefore King County initiated a two-year sampling and monitoring study of the future Brightwater tributaries. Sampling and monitoring sites were selected based on either their proximity to the future Brightwater connections or their appropriateness for characterizing upstream flow conditions. This paper describes the wastewater and air quality parameters monitored and the analysis of monitoring results. It discusses how a sampling and monitoring program was used to select, size, and locate new odor and corrosion control technologies for the Brightwater conveyance system. Odor control technologies selected for the conveyance system included carbon adsorption, bioscrubbers, and chemical injection at various points within the conveyance system.
King County is constructing a new treatment plant and conveyance system for a rapidly growing part of its service area. The new conveyance system will divert flows away from two existing interceptors (Swamp Creek and North Creek) to a new 2.2-mile influent tunnel that will drain by gravity to a new influent pump station. The pump station will pump the flow 2.6 miles and lift it 235 vertical feet...
Author(s)
Bruce BallBrownCaldwell
SourceProceedings of the Water Environment Federation
SubjectSession 2: Collection System Odors and Corrosion
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2006
ISSN1938-6478
SICI1938-6478(20060101)2006:3L.128;1-
DOI10.2175/193864706783791254
Volume / Issue2006 / 3
Content sourceOdors and Air Pollutants Conference
First / last page(s)128 - 157
Copyright2006
Word count324

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Bruce Ball# Brown# Caldwell. Siting New Odor and Corrosion Control Facilities for Brightwater Conveyance System. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 26 Sep. 2025. <https://www.accesswater.org?id=-293215CITANCHOR>.
Bruce Ball# Brown# Caldwell. Siting New Odor and Corrosion Control Facilities for Brightwater Conveyance System. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed September 26, 2025. https://www.accesswater.org/?id=-293215CITANCHOR.
Bruce Ball# Brown# Caldwell
Siting New Odor and Corrosion Control Facilities for Brightwater Conveyance System
Access Water
Water Environment Federation
December 22, 2018
September 26, 2025
https://www.accesswater.org/?id=-293215CITANCHOR