lastID = -294287
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
FLOW AND LOAD EQUALIZATION USING PRIMARY CLARIFIERS IN A BNR PLANT
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 13:33:59 Adam Phillips
  • 2022-05-04 13:33:58 Adam Phillips
  • 2020-03-26 23:39:03 Adam Phillips
  • 2020-01-31 23:14:52 Administrator
  • 2020-01-31 23:14:51 Administrator
  • 2020-01-31 23:14:50 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
FLOW AND LOAD EQUALIZATION USING PRIMARY CLARIFIERS IN A BNR PLANT

FLOW AND LOAD EQUALIZATION USING PRIMARY CLARIFIERS IN A BNR PLANT

FLOW AND LOAD EQUALIZATION USING PRIMARY CLARIFIERS IN A BNR PLANT

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
FLOW AND LOAD EQUALIZATION USING PRIMARY CLARIFIERS IN A BNR PLANT
Abstract
A full-scale 18 month study at Pihlajaniemi treatment plant in Savonlinna Finland (PE 30 000) investigated the feasibility of using the primary clarifiers for flow and load equalization as well as for volatile fatty acid (VFA) production. The objective was to improve the process performance of the biological nutrient removal (BNR) process and find better use for the old primary clarifiers.Equalization in this study decreased flow rate variations by 38% on an average. During the best months the flow to the biological process was practically constant. Hydrolysis was successful. The VFA concentration increased by 50%. The simultaneous removal of raw sludge did not cause any problems. The use of primary clarifiers for equalization and fermentation influenced the biological process in three ways: It improved the hydraulic control of the process, it equalized the load and conditions in the process and it increased the amount of readily usable organic matter. The transformation of old primary clarifiers for multipurpose primary tanks proved to be economically and technically feasible solution for responding to the requirements of BNR process.
A full-scale 18 month study at Pihlajaniemi treatment plant in Savonlinna Finland (PE 30 000) investigated the feasibility of using the primary clarifiers for flow and load equalization as well as for volatile fatty acid (VFA) production. The objective was to improve the process performance of the biological nutrient removal (BNR) process and find better use for the old primary...
Author(s)
Anna MikolaJyri RautiainenHeikki Kiuru
SourceProceedings of the Water Environment Federation
SubjectSession 2: BNR – Wet Weather
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2007
ISSN1938-6478
SICI1938-6478(20070101)2007:2L.186;1-
DOI10.2175/193864707787977325
Volume / Issue2007 / 2
Content sourceNutrient Removal and Recovery Symposium
First / last page(s)186 - 201
Copyright2007
Word count186

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'FLOW AND LOAD EQUALIZATION USING PRIMARY CLARIFIERS IN A BNR PLANT'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
FLOW AND LOAD EQUALIZATION USING PRIMARY CLARIFIERS IN A BNR PLANT
Pricing
Non-member price: $11.50
Member price:
-294287
Get access
-294287
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'FLOW AND LOAD EQUALIZATION USING PRIMARY CLARIFIERS IN A BNR PLANT'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
FLOW AND LOAD EQUALIZATION USING PRIMARY CLARIFIERS IN A BNR PLANT
Abstract
A full-scale 18 month study at Pihlajaniemi treatment plant in Savonlinna Finland (PE 30 000) investigated the feasibility of using the primary clarifiers for flow and load equalization as well as for volatile fatty acid (VFA) production. The objective was to improve the process performance of the biological nutrient removal (BNR) process and find better use for the old primary clarifiers.Equalization in this study decreased flow rate variations by 38% on an average. During the best months the flow to the biological process was practically constant. Hydrolysis was successful. The VFA concentration increased by 50%. The simultaneous removal of raw sludge did not cause any problems. The use of primary clarifiers for equalization and fermentation influenced the biological process in three ways: It improved the hydraulic control of the process, it equalized the load and conditions in the process and it increased the amount of readily usable organic matter. The transformation of old primary clarifiers for multipurpose primary tanks proved to be economically and technically feasible solution for responding to the requirements of BNR process.
A full-scale 18 month study at Pihlajaniemi treatment plant in Savonlinna Finland (PE 30 000) investigated the feasibility of using the primary clarifiers for flow and load equalization as well as for volatile fatty acid (VFA) production. The objective was to improve the process performance of the biological nutrient removal (BNR) process and find better use for the old primary...
Author(s)
Anna MikolaJyri RautiainenHeikki Kiuru
SourceProceedings of the Water Environment Federation
SubjectSession 2: BNR – Wet Weather
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2007
ISSN1938-6478
SICI1938-6478(20070101)2007:2L.186;1-
DOI10.2175/193864707787977325
Volume / Issue2007 / 2
Content sourceNutrient Removal and Recovery Symposium
First / last page(s)186 - 201
Copyright2007
Word count186

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Anna Mikola# Jyri Rautiainen# Heikki Kiuru. FLOW AND LOAD EQUALIZATION USING PRIMARY CLARIFIERS IN A BNR PLANT. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 30 Jun. 2025. <https://www.accesswater.org?id=-294287CITANCHOR>.
Anna Mikola# Jyri Rautiainen# Heikki Kiuru. FLOW AND LOAD EQUALIZATION USING PRIMARY CLARIFIERS IN A BNR PLANT. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 30, 2025. https://www.accesswater.org/?id=-294287CITANCHOR.
Anna Mikola# Jyri Rautiainen# Heikki Kiuru
FLOW AND LOAD EQUALIZATION USING PRIMARY CLARIFIERS IN A BNR PLANT
Access Water
Water Environment Federation
December 22, 2018
June 30, 2025
https://www.accesswater.org/?id=-294287CITANCHOR