lastID = -294296
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
IN-SITU DATA COLLECTION/MONITORING FOR MODELING THE FINAL SETTLING TANK (FSTs) AT WARDS ISLAND WPCP-BATTERY “E”
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 13:35:26 Adam Phillips
  • 2022-05-04 13:35:25 Adam Phillips
  • 2020-03-26 23:38:53 Adam Phillips
  • 2020-02-01 00:20:42 Administrator
  • 2020-02-01 00:20:41 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
IN-SITU DATA COLLECTION/MONITORING FOR MODELING THE FINAL SETTLING TANK (FSTs) AT WARDS ISLAND WPCP-BATTERY “E”

IN-SITU DATA COLLECTION/MONITORING FOR MODELING THE FINAL SETTLING TANK (FSTs) AT WARDS ISLAND WPCP-BATTERY “E”

IN-SITU DATA COLLECTION/MONITORING FOR MODELING THE FINAL SETTLING TANK (FSTs) AT WARDS ISLAND WPCP-BATTERY “E”

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
IN-SITU DATA COLLECTION/MONITORING FOR MODELING THE FINAL SETTLING TANK (FSTs) AT WARDS ISLAND WPCP-BATTERY “E”
Abstract
The Wards Island water pollution control plant (WPCP) in New York City provides secondary treatment using the step feed activated sludge process. In a recent expansion, aeration tank 13 (AT-13) of Battery “E” was placed in operation as a step-feed biological nitrogen removal (BNR) process.The most important mechanisms active in the removal of SS in final settling tanks, (FSTs), are the settling velocities of the solids, flocculation, and the hydraulic profiles within the FSTs. The New York City Department of Environmental protection, (DEP), working with The City College of New York, (CCNY), is developing a three dimensional computer model of the Gould II type FSTs as currently operated in Battery “E”. The model, once calibrated and validated, will be used in part to assess proposed structural modifications and to estimate the maximum hydraulic and solids loading rates.This paper presents the experimental work carried out in situ at Battery “E”, as well as bench scale work to determine the site specific relationships of settling velocities, impact of flocculation, and hydraulic profiles expected in the existing FSTs. Settling experiments to quantify the discrete settling occurring in the upper regions of the tank, as well as zone and compression settling were carried out over a 14 month period. Thus settling velocities were measured during winter and summer months and at different SVI values. The data showed that zone and compression settling can be expressed by a single Vesilind equation where V0 and k can be estimated by the following equation:k is a constant and the average value of k equaled 0.43 L/gIn addition, in-situ test for DSS using the Kemmerer sampler and batch experiments using the Phipps and Bird jar test were conducted to document the importance of flocculation in the performance of the FSTs. The traditional way used to calculate “G” cannot be applied to FSTs. Therefore the jar tests were modeled similarly to the FSTs so that “G” would be calculated in an identical manner. The new definition of “G” was used to calculate the coefficients of KA and KB in Parker's formula for flocculation. Tracer studies using the Rhodamine WT dye and a modification of Crosby's “multi-point dispersion test procedure” were conducted to demonstrate the cross three dimensional movement of flow within the FSTs.
The Wards Island water pollution control plant (WPCP) in New York City provides secondary treatment using the step feed activated sludge process. In a recent expansion, aeration tank 13 (AT-13) of Battery “E” was placed in operation as a step-feed biological nitrogen removal (BNR) process.The most important mechanisms active in the removal of SS in final settling tanks, (FSTs), are the...
Author(s)
Krish RamalingamJohn FillosAllen DeurKeith Beckmann
SourceProceedings of the Water Environment Federation
SubjectSession 4: Process Optimization and Control
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2007
ISSN1938-6478
SICI1938-6478(20070101)2007:2L.311;1-
DOI10.2175/193864707787976821
Volume / Issue2007 / 2
Content sourceNutrient Removal and Recovery Symposium
First / last page(s)311 - 336
Copyright2007
Word count390

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'IN-SITU DATA COLLECTION/MONITORING FOR MODELING THE FINAL SETTLING TANK (FSTs) AT WARDS ISLAND WPCP-BATTERY “E”'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
IN-SITU DATA COLLECTION/MONITORING FOR MODELING THE FINAL SETTLING TANK (FSTs) AT WARDS ISLAND WPCP-BATTERY “E”
Pricing
Non-member price: $11.50
Member price:
-294296
Get access
-294296
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'IN-SITU DATA COLLECTION/MONITORING FOR MODELING THE FINAL SETTLING TANK (FSTs) AT WARDS ISLAND WPCP-BATTERY “E”'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
IN-SITU DATA COLLECTION/MONITORING FOR MODELING THE FINAL SETTLING TANK (FSTs) AT WARDS ISLAND WPCP-BATTERY “E”
Abstract
The Wards Island water pollution control plant (WPCP) in New York City provides secondary treatment using the step feed activated sludge process. In a recent expansion, aeration tank 13 (AT-13) of Battery “E” was placed in operation as a step-feed biological nitrogen removal (BNR) process.The most important mechanisms active in the removal of SS in final settling tanks, (FSTs), are the settling velocities of the solids, flocculation, and the hydraulic profiles within the FSTs. The New York City Department of Environmental protection, (DEP), working with The City College of New York, (CCNY), is developing a three dimensional computer model of the Gould II type FSTs as currently operated in Battery “E”. The model, once calibrated and validated, will be used in part to assess proposed structural modifications and to estimate the maximum hydraulic and solids loading rates.This paper presents the experimental work carried out in situ at Battery “E”, as well as bench scale work to determine the site specific relationships of settling velocities, impact of flocculation, and hydraulic profiles expected in the existing FSTs. Settling experiments to quantify the discrete settling occurring in the upper regions of the tank, as well as zone and compression settling were carried out over a 14 month period. Thus settling velocities were measured during winter and summer months and at different SVI values. The data showed that zone and compression settling can be expressed by a single Vesilind equation where V0 and k can be estimated by the following equation:k is a constant and the average value of k equaled 0.43 L/gIn addition, in-situ test for DSS using the Kemmerer sampler and batch experiments using the Phipps and Bird jar test were conducted to document the importance of flocculation in the performance of the FSTs. The traditional way used to calculate “G” cannot be applied to FSTs. Therefore the jar tests were modeled similarly to the FSTs so that “G” would be calculated in an identical manner. The new definition of “G” was used to calculate the coefficients of KA and KB in Parker's formula for flocculation. Tracer studies using the Rhodamine WT dye and a modification of Crosby's “multi-point dispersion test procedure” were conducted to demonstrate the cross three dimensional movement of flow within the FSTs.
The Wards Island water pollution control plant (WPCP) in New York City provides secondary treatment using the step feed activated sludge process. In a recent expansion, aeration tank 13 (AT-13) of Battery “E” was placed in operation as a step-feed biological nitrogen removal (BNR) process.The most important mechanisms active in the removal of SS in final settling tanks, (FSTs), are the...
Author(s)
Krish RamalingamJohn FillosAllen DeurKeith Beckmann
SourceProceedings of the Water Environment Federation
SubjectSession 4: Process Optimization and Control
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2007
ISSN1938-6478
SICI1938-6478(20070101)2007:2L.311;1-
DOI10.2175/193864707787976821
Volume / Issue2007 / 2
Content sourceNutrient Removal and Recovery Symposium
First / last page(s)311 - 336
Copyright2007
Word count390

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Krish Ramalingam# John Fillos# Allen Deur# Keith Beckmann. IN-SITU DATA COLLECTION/MONITORING FOR MODELING THE FINAL SETTLING TANK (FSTs) AT WARDS ISLAND WPCP-BATTERY “E”. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 8 Jun. 2025. <https://www.accesswater.org?id=-294296CITANCHOR>.
Krish Ramalingam# John Fillos# Allen Deur# Keith Beckmann. IN-SITU DATA COLLECTION/MONITORING FOR MODELING THE FINAL SETTLING TANK (FSTs) AT WARDS ISLAND WPCP-BATTERY “E”. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 8, 2025. https://www.accesswater.org/?id=-294296CITANCHOR.
Krish Ramalingam# John Fillos# Allen Deur# Keith Beckmann
IN-SITU DATA COLLECTION/MONITORING FOR MODELING THE FINAL SETTLING TANK (FSTs) AT WARDS ISLAND WPCP-BATTERY “E”
Access Water
Water Environment Federation
December 22, 2018
June 8, 2025
https://www.accesswater.org/?id=-294296CITANCHOR