lastID = -294461
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
SWITCHING FROM INCINERATION OF THE HEAT TREATED SLUDGE TO INCINERATION OF THE UNTREATED SLUDGE – EXPERIENCE AT THE REGION OF PEEL LAKEVIEW WWTP, ONTARIO
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 16:43:49 Adam Phillips
  • 2020-03-27 00:43:26 Adam Phillips
  • 2020-03-27 00:43:25 Adam Phillips
  • 2020-02-01 04:45:05 Administrator
  • 2020-02-01 04:45:04 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
SWITCHING FROM INCINERATION OF THE HEAT TREATED SLUDGE TO INCINERATION OF THE UNTREATED SLUDGE – EXPERIENCE AT THE REGION OF PEEL LAKEVIEW WWTP, ONTARIO

SWITCHING FROM INCINERATION OF THE HEAT TREATED SLUDGE TO INCINERATION OF THE UNTREATED SLUDGE – EXPERIENCE AT THE REGION OF PEEL LAKEVIEW WWTP, ONTARIO

SWITCHING FROM INCINERATION OF THE HEAT TREATED SLUDGE TO INCINERATION OF THE UNTREATED SLUDGE – EXPERIENCE AT THE REGION OF PEEL LAKEVIEW WWTP, ONTARIO

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
SWITCHING FROM INCINERATION OF THE HEAT TREATED SLUDGE TO INCINERATION OF THE UNTREATED SLUDGE – EXPERIENCE AT THE REGION OF PEEL LAKEVIEW WWTP, ONTARIO
Abstract
The Lakeview wastewater treatment plant (WWTP) in Mississauga, Ontario, is owned by the Region of Peel and is operated by the Ontario Clean Water Agency (OCWA). The plant is equipped with fluid bed incineration (FBI) systems as their disposal option for almost thirty years. The facility is located on the shore of Lake Ontario, just west of the Metropolitan Toronto and serves Mississauga, Brampton and the Town of Caledon. It has a design capacity of 118 mgd on an annual average. For the last several decades, sludge generated at the plant and imported sludge from Clarkson WWTP (The second WWTP in the Western part of Mississauga in the Region of Peel) were heat-treated by the Zimmerman Process (or Zimpro), decanted, dewatered up to 38%TS and burned in three cold-wind-box (CWB) fluidized beds.Due to the high maintenance and the odor generated by Zimpro, in 2003 The Region of Peel decided to eliminate the heat-treated system and to replace the three existing CWB fluid beds by four hot-windbox (HWB) fluid beds, each dispose of 110 US tons of dry sludge per day. Today the untreated sludge at Lakeview is dewatered to about 27% dry solids by centrifuge decanters and combusted autogenously in the HWB fluid bed incinerator. The untreated sludge is about 60/40 mix of primary and activated sludge. Sludge is primarily municipal with at least 30% from industrial sources.The initial two CWB fluid beds at the plant began operation in 1982. In 1994, an additional third CWB system was put on-line. All threes systems were of type push-pull and equipped with waste heat boiler and venturi scrubber. The steam generated from the plant was used in the Zimpro heat-treated system. In February 2006, the first of four hot-windbox systems was on-lined and commissioned. The new system is equipped with external shell and tube heat exchanger for preheating the combustion air to 1230 oF to hugely reducing the auxiliary fuel consumption, and a venturi scrubber of type multiple venturi scrubber as air pollution control device.Since it went operational in February 2006, the new hot wind-box system ran around the clock, 24 hours a day, 7 days a week with very little requirement for auxiliary fuel nor for makeup sand. The system satisfied the design emission requirements by a wide margin upon initial performance testing. The paper discusses the detailed transition period during the replacement of the Zimpro system. The text provides technical and economical differences between incineration of the treated and the untreated sludge.With all four fluid beds in operation by mid 2009, the Lakeview plant will be the largest sludge incineration plant in the world.The Region of Peel has shown the HWB fluid bed incineration system to be an economical, environmentally acceptable sludge disposal method satisfactory to the Authority, the permitting agencies and the general public.
The Lakeview wastewater treatment plant (WWTP) in Mississauga, Ontario, is owned by the Region of Peel and is operated by the Ontario Clean Water Agency (OCWA). The plant is equipped with fluid bed incineration (FBI) systems as their disposal option for almost thirty years. The facility is located on the shore of Lake Ontario, just west of the Metropolitan Toronto and serves Mississauga, Brampton...
Author(s)
William FernandesKy Dangtran
SourceProceedings of the Water Environment Federation
SubjectSession 15: Bioenergy II
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2007
ISSN1938-6478
SICI1938-6478(20070101)2007:3L.851;1-
DOI10.2175/193864707787975499
Volume / Issue2007 / 3
Content sourceResiduals and Biosolids Conference
First / last page(s)851 - 864
Copyright2007
Word count489

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'SWITCHING FROM INCINERATION OF THE HEAT TREATED SLUDGE TO INCINERATION OF THE UNTREATED SLUDGE – EXPERIENCE AT THE REGION OF PEEL LAKEVIEW WWTP, ONTARIO'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
SWITCHING FROM INCINERATION OF THE HEAT TREATED SLUDGE TO INCINERATION OF THE UNTREATED SLUDGE – EXPERIENCE AT THE REGION OF PEEL LAKEVIEW WWTP, ONTARIO
Pricing
Non-member price: $11.50
Member price:
-294461
Get access
-294461
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'SWITCHING FROM INCINERATION OF THE HEAT TREATED SLUDGE TO INCINERATION OF THE UNTREATED SLUDGE – EXPERIENCE AT THE REGION OF PEEL LAKEVIEW WWTP, ONTARIO'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
SWITCHING FROM INCINERATION OF THE HEAT TREATED SLUDGE TO INCINERATION OF THE UNTREATED SLUDGE – EXPERIENCE AT THE REGION OF PEEL LAKEVIEW WWTP, ONTARIO
Abstract
The Lakeview wastewater treatment plant (WWTP) in Mississauga, Ontario, is owned by the Region of Peel and is operated by the Ontario Clean Water Agency (OCWA). The plant is equipped with fluid bed incineration (FBI) systems as their disposal option for almost thirty years. The facility is located on the shore of Lake Ontario, just west of the Metropolitan Toronto and serves Mississauga, Brampton and the Town of Caledon. It has a design capacity of 118 mgd on an annual average. For the last several decades, sludge generated at the plant and imported sludge from Clarkson WWTP (The second WWTP in the Western part of Mississauga in the Region of Peel) were heat-treated by the Zimmerman Process (or Zimpro), decanted, dewatered up to 38%TS and burned in three cold-wind-box (CWB) fluidized beds.Due to the high maintenance and the odor generated by Zimpro, in 2003 The Region of Peel decided to eliminate the heat-treated system and to replace the three existing CWB fluid beds by four hot-windbox (HWB) fluid beds, each dispose of 110 US tons of dry sludge per day. Today the untreated sludge at Lakeview is dewatered to about 27% dry solids by centrifuge decanters and combusted autogenously in the HWB fluid bed incinerator. The untreated sludge is about 60/40 mix of primary and activated sludge. Sludge is primarily municipal with at least 30% from industrial sources.The initial two CWB fluid beds at the plant began operation in 1982. In 1994, an additional third CWB system was put on-line. All threes systems were of type push-pull and equipped with waste heat boiler and venturi scrubber. The steam generated from the plant was used in the Zimpro heat-treated system. In February 2006, the first of four hot-windbox systems was on-lined and commissioned. The new system is equipped with external shell and tube heat exchanger for preheating the combustion air to 1230 oF to hugely reducing the auxiliary fuel consumption, and a venturi scrubber of type multiple venturi scrubber as air pollution control device.Since it went operational in February 2006, the new hot wind-box system ran around the clock, 24 hours a day, 7 days a week with very little requirement for auxiliary fuel nor for makeup sand. The system satisfied the design emission requirements by a wide margin upon initial performance testing. The paper discusses the detailed transition period during the replacement of the Zimpro system. The text provides technical and economical differences between incineration of the treated and the untreated sludge.With all four fluid beds in operation by mid 2009, the Lakeview plant will be the largest sludge incineration plant in the world.The Region of Peel has shown the HWB fluid bed incineration system to be an economical, environmentally acceptable sludge disposal method satisfactory to the Authority, the permitting agencies and the general public.
The Lakeview wastewater treatment plant (WWTP) in Mississauga, Ontario, is owned by the Region of Peel and is operated by the Ontario Clean Water Agency (OCWA). The plant is equipped with fluid bed incineration (FBI) systems as their disposal option for almost thirty years. The facility is located on the shore of Lake Ontario, just west of the Metropolitan Toronto and serves Mississauga, Brampton...
Author(s)
William FernandesKy Dangtran
SourceProceedings of the Water Environment Federation
SubjectSession 15: Bioenergy II
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2007
ISSN1938-6478
SICI1938-6478(20070101)2007:3L.851;1-
DOI10.2175/193864707787975499
Volume / Issue2007 / 3
Content sourceResiduals and Biosolids Conference
First / last page(s)851 - 864
Copyright2007
Word count489

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
William Fernandes# Ky Dangtran. SWITCHING FROM INCINERATION OF THE HEAT TREATED SLUDGE TO INCINERATION OF THE UNTREATED SLUDGE – EXPERIENCE AT THE REGION OF PEEL LAKEVIEW WWTP, ONTARIO. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 7 Jun. 2025. <https://www.accesswater.org?id=-294461CITANCHOR>.
William Fernandes# Ky Dangtran. SWITCHING FROM INCINERATION OF THE HEAT TREATED SLUDGE TO INCINERATION OF THE UNTREATED SLUDGE – EXPERIENCE AT THE REGION OF PEEL LAKEVIEW WWTP, ONTARIO. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 7, 2025. https://www.accesswater.org/?id=-294461CITANCHOR.
William Fernandes# Ky Dangtran
SWITCHING FROM INCINERATION OF THE HEAT TREATED SLUDGE TO INCINERATION OF THE UNTREATED SLUDGE – EXPERIENCE AT THE REGION OF PEEL LAKEVIEW WWTP, ONTARIO
Access Water
Water Environment Federation
December 22, 2018
June 7, 2025
https://www.accesswater.org/?id=-294461CITANCHOR