lastID = -294544
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
DESIGNING ONE OF NORTH CAROLINA'S LARGEST SEWERS – TECHNICAL CHALLENGES AND COMMUNITY ACCEPTANCE
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:20:24 Adam Phillips
  • 2020-03-26 22:10:24 Adam Phillips
  • 2020-03-26 22:10:23 Adam Phillips
  • 2020-01-31 21:48:27 Administrator
  • 2020-01-31 21:48:26 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
DESIGNING ONE OF NORTH CAROLINA'S LARGEST SEWERS – TECHNICAL CHALLENGES AND COMMUNITY ACCEPTANCE

DESIGNING ONE OF NORTH CAROLINA'S LARGEST SEWERS – TECHNICAL CHALLENGES AND COMMUNITY ACCEPTANCE

DESIGNING ONE OF NORTH CAROLINA'S LARGEST SEWERS – TECHNICAL CHALLENGES AND COMMUNITY ACCEPTANCE

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
DESIGNING ONE OF NORTH CAROLINA'S LARGEST SEWERS – TECHNICAL CHALLENGES AND COMMUNITY ACCEPTANCE
Abstract
Charlotte-Mecklenburg Utilities (Utilities) currently operates five wastewater treatment plants (WWTPs) with a combined wastewater treatment capacity of 118 mgd. The Sugar Creek WWTP treats wastewater from a portion of downtown Charlotte and south Charlotte within the Little Sugar Creek and Briar Creek drainage basins. The existing Briar Creek trunk sewer was constructed of vitrified clay pipe (VCP) in the late 1920s, and the condition and capacity of the existing sewer does not provide the level of service required by Utilities, new state laws, and EPA. Therefore, improvements are necessary to reduce the risk of sanitary sewer overflows and to increase the sewer capacity to meet current and future wastewater flows. The Briar Creek Relief Sewer will replace most of the 1920s sewer and is designed to convey 75 mgd. Phase I of the project consists of more than four miles of 72-inch and 60-inch diameter sewer that will tie into a new pump station at the Sugar Creek WWTP, which is currently under construction. Two additional phases are being designed and will be constructed in the future.When the proposed design of the new relief sewer was introduced to the public, there was significant public opposition. Since the Briar Creek basin is primarily residential and nearly built out, the sewer route was located though many wooded backyards and in some areas within 25 feet of homes. In addition, the sewer would be constructed through a park-like school campus, a prestigious golf course and country club, neighborhood association properties, a land conservancy, high-end apartments, and a neighborhood park. Because of the vocal public opposition and concern over the project, a proactive public communication and outreach program was developed that gave property owners multiple opportunities to provide input. As a result, the route was realigned to reduce impacts to residential properties by 50%. In addition, many other route adjustments were made to minimize disruption through public and commercial properties.Because of the size and location of this sewer, substantial construction constraints also exist. Some of the constraints include installation of the new relief sewer adjacent to an aging VCP sewer which must remain in service during construction, limited construction space because of the highly developed area, depth of construction ranging from 25 to 60 feet, and scheduling restrictions.As a result of the proactive public communications program, public opposition has been significantly reduced, and 62 of the 63 easements for the project have been acquired. All of the regulatory agencies have issued the required permits, and the project was advertised on March 2, 2007.
Charlotte-Mecklenburg Utilities (Utilities) currently operates five wastewater treatment plants (WWTPs) with a combined wastewater treatment capacity of 118 mgd. The Sugar Creek WWTP treats wastewater from a portion of downtown Charlotte and south Charlotte within the Little Sugar Creek and Briar Creek drainage basins. The existing Briar Creek trunk sewer was constructed of vitrified clay pipe...
Author(s)
Laurin B. KennedyGeorge JonesJeffrey F. Payne
SourceProceedings of the Water Environment Federation
SubjectSession 11: Gaining Support from your Most Important Customers-the Public
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2007
ISSN1938-6478
SICI1938-6478(20070101)2007:4L.776;1-
DOI10.2175/193864707787974878
Volume / Issue2007 / 4
Content sourceCollection Systems Conference
First / last page(s)776 - 786
Copyright2007
Word count432

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'DESIGNING ONE OF NORTH CAROLINA'S LARGEST SEWERS – TECHNICAL CHALLENGES AND COMMUNITY ACCEPTANCE'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
DESIGNING ONE OF NORTH CAROLINA'S LARGEST SEWERS – TECHNICAL CHALLENGES AND COMMUNITY ACCEPTANCE
Pricing
Non-member price: $11.50
Member price:
-294544
Get access
-294544
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'DESIGNING ONE OF NORTH CAROLINA'S LARGEST SEWERS – TECHNICAL CHALLENGES AND COMMUNITY ACCEPTANCE'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
DESIGNING ONE OF NORTH CAROLINA'S LARGEST SEWERS – TECHNICAL CHALLENGES AND COMMUNITY ACCEPTANCE
Abstract
Charlotte-Mecklenburg Utilities (Utilities) currently operates five wastewater treatment plants (WWTPs) with a combined wastewater treatment capacity of 118 mgd. The Sugar Creek WWTP treats wastewater from a portion of downtown Charlotte and south Charlotte within the Little Sugar Creek and Briar Creek drainage basins. The existing Briar Creek trunk sewer was constructed of vitrified clay pipe (VCP) in the late 1920s, and the condition and capacity of the existing sewer does not provide the level of service required by Utilities, new state laws, and EPA. Therefore, improvements are necessary to reduce the risk of sanitary sewer overflows and to increase the sewer capacity to meet current and future wastewater flows. The Briar Creek Relief Sewer will replace most of the 1920s sewer and is designed to convey 75 mgd. Phase I of the project consists of more than four miles of 72-inch and 60-inch diameter sewer that will tie into a new pump station at the Sugar Creek WWTP, which is currently under construction. Two additional phases are being designed and will be constructed in the future.When the proposed design of the new relief sewer was introduced to the public, there was significant public opposition. Since the Briar Creek basin is primarily residential and nearly built out, the sewer route was located though many wooded backyards and in some areas within 25 feet of homes. In addition, the sewer would be constructed through a park-like school campus, a prestigious golf course and country club, neighborhood association properties, a land conservancy, high-end apartments, and a neighborhood park. Because of the vocal public opposition and concern over the project, a proactive public communication and outreach program was developed that gave property owners multiple opportunities to provide input. As a result, the route was realigned to reduce impacts to residential properties by 50%. In addition, many other route adjustments were made to minimize disruption through public and commercial properties.Because of the size and location of this sewer, substantial construction constraints also exist. Some of the constraints include installation of the new relief sewer adjacent to an aging VCP sewer which must remain in service during construction, limited construction space because of the highly developed area, depth of construction ranging from 25 to 60 feet, and scheduling restrictions.As a result of the proactive public communications program, public opposition has been significantly reduced, and 62 of the 63 easements for the project have been acquired. All of the regulatory agencies have issued the required permits, and the project was advertised on March 2, 2007.
Charlotte-Mecklenburg Utilities (Utilities) currently operates five wastewater treatment plants (WWTPs) with a combined wastewater treatment capacity of 118 mgd. The Sugar Creek WWTP treats wastewater from a portion of downtown Charlotte and south Charlotte within the Little Sugar Creek and Briar Creek drainage basins. The existing Briar Creek trunk sewer was constructed of vitrified clay pipe...
Author(s)
Laurin B. KennedyGeorge JonesJeffrey F. Payne
SourceProceedings of the Water Environment Federation
SubjectSession 11: Gaining Support from your Most Important Customers-the Public
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2007
ISSN1938-6478
SICI1938-6478(20070101)2007:4L.776;1-
DOI10.2175/193864707787974878
Volume / Issue2007 / 4
Content sourceCollection Systems Conference
First / last page(s)776 - 786
Copyright2007
Word count432

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Laurin B. Kennedy# George Jones# Jeffrey F. Payne. DESIGNING ONE OF NORTH CAROLINA'S LARGEST SEWERS – TECHNICAL CHALLENGES AND COMMUNITY ACCEPTANCE. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 4 Oct. 2025. <https://www.accesswater.org?id=-294544CITANCHOR>.
Laurin B. Kennedy# George Jones# Jeffrey F. Payne. DESIGNING ONE OF NORTH CAROLINA'S LARGEST SEWERS – TECHNICAL CHALLENGES AND COMMUNITY ACCEPTANCE. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed October 4, 2025. https://www.accesswater.org/?id=-294544CITANCHOR.
Laurin B. Kennedy# George Jones# Jeffrey F. Payne
DESIGNING ONE OF NORTH CAROLINA'S LARGEST SEWERS – TECHNICAL CHALLENGES AND COMMUNITY ACCEPTANCE
Access Water
Water Environment Federation
December 22, 2018
October 4, 2025
https://www.accesswater.org/?id=-294544CITANCHOR