lastID = -295343
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Design and First-Year Operation of the 50 mgd Membrane Treatment Facility at Gwinnett County, Georgia
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-06-14 20:15:10 Adam Phillips
  • 2022-06-14 20:15:09 Adam Phillips
  • 2020-03-26 23:28:35 Adam Phillips
  • 2020-03-26 23:28:34 Adam Phillips
  • 2020-01-31 21:44:55 Administrator
  • 2020-01-31 21:44:54 Administrator
  • 2020-01-31 21:44:53 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Design and First-Year Operation of the 50 mgd Membrane Treatment Facility at Gwinnett County, Georgia

Design and First-Year Operation of the 50 mgd Membrane Treatment Facility at Gwinnett County, Georgia

Design and First-Year Operation of the 50 mgd Membrane Treatment Facility at Gwinnett County, Georgia

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Design and First-Year Operation of the 50 mgd Membrane Treatment Facility at Gwinnett County, Georgia
Abstract
Gwinnett County, located near Atlanta, Georgia, is one of the fastest growing counties in the nation. A new 20 mgd state-of-the-art water reclamation and processing facility, called the F. Wayne Hill Water Resources Center, became operational in December 2000 and now has been expanded increasing its capacity to 60 mgd (maximum month flow basis). The expanded plant produces high-quality water which discharges to the Chattahoochee River downstream of Lake Lanier. When construction of the new discharge line and outfall to Lake Lanier is completed and operational, the treated product water will discharge directly to the lake — the County's raw water supply source. The NPDES permit for the lake discharge requires the monthly average total phosphorus, ammonia-nitrogen, and turbidity to not exceed 0.08 mg/L P, 0.4 mg/L NH3-N, and 0.5 NTU, respectively.After an extensive 1-year testing period in 2001 and an evaluation of performance, cost, and other factors, membrane filtration using ultrafiltration was selected as part of the advanced treatment processes to treat secondary effluent. The Zenon ZW-500c membrane process was the highest-ranked proposal following a selection process in 2002 that evaluated eight different membrane filtration systems from five manufacturers.Biological processes at the existing (Phase 1) plant were designed for complete nitrification, partial denitrification, and phosphorus reduction. Tertiary treatment processes included ferric chloride chemical coagulation/clarification followed by granular media filters, pre-ozone and granular activated carbon (biologically enhanced activated carbon), and ozone disinfection.The selected process train for the Phase 2 plant expansion treating secondary effluent included:Metal salt coagulant addition/clarification for reduction of phosphorus, organics and solidsScreening with drum-type in-channel prefiltersParticle filtration with ultrafiltration for turbidity and particle (pathogen) removalBlending with the existing media filter effluent followed by pre-ozone/granular activated carbon for organics removalFinal ozonation for disinfection.In the summer of 2002 a three month Membrane System “Proof Test” was started with the ZW-500c pilot-scale system to confirm design criteria and projected operating costs. Simultaneously, preliminary design commenced incorporating the membrane system into the construction contract documents for the full-scale facility.The UF system consists of 16 parallel process trains with a high degree of redundancy for added reliability. Full production capacity 48 mgd permeate can be met with 14 trains in service and all critical auxiliary equipment and piping are designed for redundancy with backups. Each train has a capacity of 3.6 mgd feed flow and operates at a minimum recovery of 96% at 20 C.The Phase 2 construction began on the AWT (advanced water treatment) facilities in the second quarter of 2003. The testing and commissioning of the first four trains' 12.5 mgd total capacity began in late 2005. By June 2006, all sixteen trains were operational.This paper will summarize the process design of the membrane facility, start-up activities, and operational data during the first full year of operation. The 50 mgd ultrafiltration system is one of the largest membrane facilities in the world and the largest membrane plant in the Eastern USA.
Gwinnett County, located near Atlanta, Georgia, is one of the fastest growing counties in the nation. A new 20 mgd state-of-the-art water reclamation and processing facility, called the F. Wayne Hill Water Resources Center, became operational in December 2000 and now has been expanded increasing its capacity to 60 mgd (maximum month flow basis). The expanded plant produces high-quality water which...
Author(s)
Richard PorterRobert A. BergmanDon JoffeEd Minchew
SourceProceedings of the Water Environment Federation
SubjectSession 4: Leading Applications of Tertiary UF/MF – Testing, Design, and Optimization
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:1L.251;1-
DOI10.2175/193864708788803424
Volume / Issue2008 / 1
Content sourceMembranes Conference
First / last page(s)251 - 275
Copyright2008
Word count501

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Design and First-Year Operation of the 50 mgd Membrane Treatment Facility at Gwinnett County, Georgia'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Design and First-Year Operation of the 50 mgd Membrane Treatment Facility at Gwinnett County, Georgia
Pricing
Non-member price: $11.50
Member price:
-295343
Get access
-295343
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Design and First-Year Operation of the 50 mgd Membrane Treatment Facility at Gwinnett County, Georgia'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Design and First-Year Operation of the 50 mgd Membrane Treatment Facility at Gwinnett County, Georgia
Abstract
Gwinnett County, located near Atlanta, Georgia, is one of the fastest growing counties in the nation. A new 20 mgd state-of-the-art water reclamation and processing facility, called the F. Wayne Hill Water Resources Center, became operational in December 2000 and now has been expanded increasing its capacity to 60 mgd (maximum month flow basis). The expanded plant produces high-quality water which discharges to the Chattahoochee River downstream of Lake Lanier. When construction of the new discharge line and outfall to Lake Lanier is completed and operational, the treated product water will discharge directly to the lake — the County's raw water supply source. The NPDES permit for the lake discharge requires the monthly average total phosphorus, ammonia-nitrogen, and turbidity to not exceed 0.08 mg/L P, 0.4 mg/L NH3-N, and 0.5 NTU, respectively.After an extensive 1-year testing period in 2001 and an evaluation of performance, cost, and other factors, membrane filtration using ultrafiltration was selected as part of the advanced treatment processes to treat secondary effluent. The Zenon ZW-500c membrane process was the highest-ranked proposal following a selection process in 2002 that evaluated eight different membrane filtration systems from five manufacturers.Biological processes at the existing (Phase 1) plant were designed for complete nitrification, partial denitrification, and phosphorus reduction. Tertiary treatment processes included ferric chloride chemical coagulation/clarification followed by granular media filters, pre-ozone and granular activated carbon (biologically enhanced activated carbon), and ozone disinfection.The selected process train for the Phase 2 plant expansion treating secondary effluent included:Metal salt coagulant addition/clarification for reduction of phosphorus, organics and solidsScreening with drum-type in-channel prefiltersParticle filtration with ultrafiltration for turbidity and particle (pathogen) removalBlending with the existing media filter effluent followed by pre-ozone/granular activated carbon for organics removalFinal ozonation for disinfection.In the summer of 2002 a three month Membrane System “Proof Test” was started with the ZW-500c pilot-scale system to confirm design criteria and projected operating costs. Simultaneously, preliminary design commenced incorporating the membrane system into the construction contract documents for the full-scale facility.The UF system consists of 16 parallel process trains with a high degree of redundancy for added reliability. Full production capacity 48 mgd permeate can be met with 14 trains in service and all critical auxiliary equipment and piping are designed for redundancy with backups. Each train has a capacity of 3.6 mgd feed flow and operates at a minimum recovery of 96% at 20 C.The Phase 2 construction began on the AWT (advanced water treatment) facilities in the second quarter of 2003. The testing and commissioning of the first four trains' 12.5 mgd total capacity began in late 2005. By June 2006, all sixteen trains were operational.This paper will summarize the process design of the membrane facility, start-up activities, and operational data during the first full year of operation. The 50 mgd ultrafiltration system is one of the largest membrane facilities in the world and the largest membrane plant in the Eastern USA.
Gwinnett County, located near Atlanta, Georgia, is one of the fastest growing counties in the nation. A new 20 mgd state-of-the-art water reclamation and processing facility, called the F. Wayne Hill Water Resources Center, became operational in December 2000 and now has been expanded increasing its capacity to 60 mgd (maximum month flow basis). The expanded plant produces high-quality water which...
Author(s)
Richard PorterRobert A. BergmanDon JoffeEd Minchew
SourceProceedings of the Water Environment Federation
SubjectSession 4: Leading Applications of Tertiary UF/MF – Testing, Design, and Optimization
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:1L.251;1-
DOI10.2175/193864708788803424
Volume / Issue2008 / 1
Content sourceMembranes Conference
First / last page(s)251 - 275
Copyright2008
Word count501

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Richard Porter# Robert A. Bergman# Don Joffe# Ed Minchew. Design and First-Year Operation of the 50 mgd Membrane Treatment Facility at Gwinnett County, Georgia. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 7 Jun. 2025. <https://www.accesswater.org?id=-295343CITANCHOR>.
Richard Porter# Robert A. Bergman# Don Joffe# Ed Minchew. Design and First-Year Operation of the 50 mgd Membrane Treatment Facility at Gwinnett County, Georgia. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 7, 2025. https://www.accesswater.org/?id=-295343CITANCHOR.
Richard Porter# Robert A. Bergman# Don Joffe# Ed Minchew
Design and First-Year Operation of the 50 mgd Membrane Treatment Facility at Gwinnett County, Georgia
Access Water
Water Environment Federation
December 22, 2018
June 7, 2025
https://www.accesswater.org/?id=-295343CITANCHOR