lastID = -295581
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Overcoming Challenges Associated with Implementing Odor Control Improvements – A Case Study
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-03-27 00:03:25 Adam Phillips
  • 2020-03-27 00:03:24 Adam Phillips
  • 2020-02-01 02:40:16 Administrator
  • 2020-02-01 02:40:15 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Overcoming Challenges Associated with Implementing Odor Control Improvements – A Case Study

Overcoming Challenges Associated with Implementing Odor Control Improvements – A Case Study

Overcoming Challenges Associated with Implementing Odor Control Improvements – A Case Study

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Overcoming Challenges Associated with Implementing Odor Control Improvements – A Case Study
Abstract
The 1.8 MGD (ADWF) Sausalito-Marin City Sanitary District (SMCSD) wastewater treatment plant is situated on a small (approximately 2.5-acre), constrained site on the San Francisco Bay. The plant has numerous odor sources that impact nearby residents and cause odor complaints. Spray masking agents installed in 2003 and liquid phase treatment systems have been marginally effective in controlling offsite odors. Customer surveys determined that odor control from the 50 year-old treatment plant was an important community goal and SMCSD Board of Directors authorized funding and implementation of state of the art odor control measures.An odor study was completed in 2004 that identified the major odor sources at the plant and made recommendations for odor control improvements. The SMCSD initiated an odor control improvements project immediately thereafter for addressing and controlling plant fugitive odor emissions. The initial concept design phase selected biotechnology as the preferred odor control technology based primarily on performance, safety, and ease of operation.During the detailed design phase several significant challenges surfaced, including the extremely limited footprint available at the site for new odor control facilities. This challenge was met by selecting small footprint bioscrubbers that would be installed on the roof of an existing control building. This decision triggered a seismic analysis of the existing control building (constructed in 1981), since local seismic criteria had since changed significantly since it was constructed. Structural roof improvements were implemented, coupled with the selection of multiple lightweight bioscrubbers (to spread the load). Roof weight limitation, equipment comparative performance assessment, and schedule issues drove the project to procure the bioscrubbers via a sole-source arrangement. Ongoing plant improvements that were impacting detailed odor control design had to be carefully coordinated.Two major design changes produced a significant cost savings for the project. First, a decision was made to reduce the primary clarifier cover to a launder-only cover. This accomplished a desire of plant staff to minimize confined spaces (for ease of maintenance and renewal and replacement efforts). In addition, there was an expected benefit that planned ferric chloride addition to plant influent would have on both primary clarifier performance and reduction of hydrogen sulfide (H2S) related odors. Second, the design team reversed the fixed film reactor air flow (air flow was changed to a vertical downward direction)_in order to delete the requirement for a fixed film reactor cover from the project (the downward flow pattern was expected to reduce fugitive emissions from the open top). These cover cost savings alone were realized at over 300,000 for the overall 1.5 million dollar project.During the construction phase of this project additional challenges surfaced, including an accelerated deteriorating vehicle access causeway that required the contractor to adjust construction work approaches. In addition, due to limitations related to access at the plant, an ocean barge and crane was used via San Francisco Bay to hoist the bioscrubber equipment onto the roof of the existing control building. Finally, more stringent plant effluent permit requirements imposed by the local water board required that treated plant effluent, designed to be utilized for bioscrubber irrigation, be chlorinated to greater than 5 parts per million (ppm) Cl-, a level exceeding that recommended by the bioscrubber manufacturer. This required that a separate non-chlorinated pumped irrigation system (secondary effluent) be implemented as both an irrigation and nutrient source.The various challenges encountered during implementation of the odor control improvements at the SMCSD were met with ingenuity, creativity and perseverance by both plant staff and the engineering consultant. This allowed the project to move forward, meeting both schedule and budget constraints, and accomplish the project goal of mitigating offsite odors while building community trust and demonstrating that SMCSD is acting as a good neighbor.
The 1.8 MGD (ADWF) Sausalito-Marin City Sanitary District (SMCSD) wastewater treatment plant is situated on a small (approximately 2.5-acre), constrained site on the San Francisco Bay. The plant has numerous odor sources that impact nearby residents and cause odor complaints. Spray masking agents installed in 2003 and liquid phase treatment systems have been marginally effective in controlling...
Author(s)
Scott CowdenBob SimmonsDavid McEwen
SourceProceedings of the Water Environment Federation
SubjectSession 4: Biological Odor Control
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:4L.284;1-
DOI10.2175/193864708788807943
Volume / Issue2008 / 4
Content sourceOdors and Air Pollutants Conference
First / last page(s)284 - 302
Copyright2008
Word count620

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Overcoming Challenges Associated with Implementing Odor Control Improvements – A Case Study'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Overcoming Challenges Associated with Implementing Odor Control Improvements – A Case Study
Pricing
Non-member price: $11.50
Member price:
-295581
Get access
-295581
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Overcoming Challenges Associated with Implementing Odor Control Improvements – A Case Study'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Overcoming Challenges Associated with Implementing Odor Control Improvements – A Case Study
Abstract
The 1.8 MGD (ADWF) Sausalito-Marin City Sanitary District (SMCSD) wastewater treatment plant is situated on a small (approximately 2.5-acre), constrained site on the San Francisco Bay. The plant has numerous odor sources that impact nearby residents and cause odor complaints. Spray masking agents installed in 2003 and liquid phase treatment systems have been marginally effective in controlling offsite odors. Customer surveys determined that odor control from the 50 year-old treatment plant was an important community goal and SMCSD Board of Directors authorized funding and implementation of state of the art odor control measures.An odor study was completed in 2004 that identified the major odor sources at the plant and made recommendations for odor control improvements. The SMCSD initiated an odor control improvements project immediately thereafter for addressing and controlling plant fugitive odor emissions. The initial concept design phase selected biotechnology as the preferred odor control technology based primarily on performance, safety, and ease of operation.During the detailed design phase several significant challenges surfaced, including the extremely limited footprint available at the site for new odor control facilities. This challenge was met by selecting small footprint bioscrubbers that would be installed on the roof of an existing control building. This decision triggered a seismic analysis of the existing control building (constructed in 1981), since local seismic criteria had since changed significantly since it was constructed. Structural roof improvements were implemented, coupled with the selection of multiple lightweight bioscrubbers (to spread the load). Roof weight limitation, equipment comparative performance assessment, and schedule issues drove the project to procure the bioscrubbers via a sole-source arrangement. Ongoing plant improvements that were impacting detailed odor control design had to be carefully coordinated.Two major design changes produced a significant cost savings for the project. First, a decision was made to reduce the primary clarifier cover to a launder-only cover. This accomplished a desire of plant staff to minimize confined spaces (for ease of maintenance and renewal and replacement efforts). In addition, there was an expected benefit that planned ferric chloride addition to plant influent would have on both primary clarifier performance and reduction of hydrogen sulfide (H2S) related odors. Second, the design team reversed the fixed film reactor air flow (air flow was changed to a vertical downward direction)_in order to delete the requirement for a fixed film reactor cover from the project (the downward flow pattern was expected to reduce fugitive emissions from the open top). These cover cost savings alone were realized at over 300,000 for the overall 1.5 million dollar project.During the construction phase of this project additional challenges surfaced, including an accelerated deteriorating vehicle access causeway that required the contractor to adjust construction work approaches. In addition, due to limitations related to access at the plant, an ocean barge and crane was used via San Francisco Bay to hoist the bioscrubber equipment onto the roof of the existing control building. Finally, more stringent plant effluent permit requirements imposed by the local water board required that treated plant effluent, designed to be utilized for bioscrubber irrigation, be chlorinated to greater than 5 parts per million (ppm) Cl-, a level exceeding that recommended by the bioscrubber manufacturer. This required that a separate non-chlorinated pumped irrigation system (secondary effluent) be implemented as both an irrigation and nutrient source.The various challenges encountered during implementation of the odor control improvements at the SMCSD were met with ingenuity, creativity and perseverance by both plant staff and the engineering consultant. This allowed the project to move forward, meeting both schedule and budget constraints, and accomplish the project goal of mitigating offsite odors while building community trust and demonstrating that SMCSD is acting as a good neighbor.
The 1.8 MGD (ADWF) Sausalito-Marin City Sanitary District (SMCSD) wastewater treatment plant is situated on a small (approximately 2.5-acre), constrained site on the San Francisco Bay. The plant has numerous odor sources that impact nearby residents and cause odor complaints. Spray masking agents installed in 2003 and liquid phase treatment systems have been marginally effective in controlling...
Author(s)
Scott CowdenBob SimmonsDavid McEwen
SourceProceedings of the Water Environment Federation
SubjectSession 4: Biological Odor Control
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:4L.284;1-
DOI10.2175/193864708788807943
Volume / Issue2008 / 4
Content sourceOdors and Air Pollutants Conference
First / last page(s)284 - 302
Copyright2008
Word count620

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Scott Cowden# Bob Simmons# David McEwen. Overcoming Challenges Associated with Implementing Odor Control Improvements – A Case Study. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 8 Oct. 2025. <https://www.accesswater.org?id=-295581CITANCHOR>.
Scott Cowden# Bob Simmons# David McEwen. Overcoming Challenges Associated with Implementing Odor Control Improvements – A Case Study. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed October 8, 2025. https://www.accesswater.org/?id=-295581CITANCHOR.
Scott Cowden# Bob Simmons# David McEwen
Overcoming Challenges Associated with Implementing Odor Control Improvements – A Case Study
Access Water
Water Environment Federation
December 22, 2018
October 8, 2025
https://www.accesswater.org/?id=-295581CITANCHOR