lastID = -296597
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Design-Build Project Delivery for Sewer System Rehabilitation
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:19:50 Adam Phillips
  • 2020-03-26 22:07:53 Adam Phillips
  • 2020-03-26 22:07:52 Adam Phillips
  • 2020-01-31 21:44:26 Administrator
  • 2020-01-31 21:44:25 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Design-Build Project Delivery for Sewer System Rehabilitation

Design-Build Project Delivery for Sewer System Rehabilitation

Design-Build Project Delivery for Sewer System Rehabilitation

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Design-Build Project Delivery for Sewer System Rehabilitation
Abstract
This paper presents a case-study of a design-build project to rehabilitate 80,000 linear feet (LF) of small diameter sewers over a 20 mile square area on a large military base. The design-build process created a strong team effort among the engineer, contractor, subcontractors and owner.In order to rehabilitate a portion of its sanitary sewer system, a Government agency decided to utilize a design-build delivery. By selecting this approach, the same team could conduct the closed-circuit sewer inspection (CCTV), determine the necessary repairs and repair methods, perform value-engineering of the proposed rehabilitation, and complete the construction work all on going over two years. Construction activities were limited by numerous environmental constraints, traffic control issues, and coordination with residents and military activities.The design-builder prepared a cost proposal based on the existing CCTV and other information provided by the Government. The CCTV was five years old and partially incomplete. It was expected that conditions had changed, an issue that needed to be addressed in the early stages of the project. After the project was negotiated, the design-builder retelevised all pipeline segments to refine and update the scope of work and find the means to best-value alternatives to rehabilitate the system at a cost consistent with the original negotiated fee.A matrix-approach was developed to determine cost effective solutions at each site. Cured-inplace piping (CIPP) became the selected alternative to repair much of the existing cracked vitrified clay pipe and cured-in-place spot repairs were completed where only a portion of a sewer segment required rehabilitation. Open trench repair was performed for pipe sags, collapses or other major defects.This paper discusses the advantages and disadvantages of the design-build delivery method in regards to large conveyance projects. The case study will demonstrate that the project approach allowed the design-builder flexibility to adapt the project to existing site conditions within the original project budget. By having the contractor and engineer on the same team, the engineer could more easily review the sewer inspection videos and develop the scope of work while the contractor looked at constructability issues. The engineer collaborated with the contractor when alternative construction approaches were proposed to ensure the original design intent was still satisfied. This design-build delivery method also allowed the design-builder the flexibility to evaluate the use of newer technologies including the use of ultraviolet light cured CIPP.
This paper presents a case-study of a design-build project to rehabilitate 80,000 linear feet (LF) of small diameter sewers over a 20 mile square area on a large military base. The design-build process created a strong team effort among the engineer, contractor, subcontractors and owner.In order to rehabilitate a portion of its sanitary sewer system, a Government agency decided to utilize a...
Author(s)
Barbara Melcher
SourceProceedings of the Water Environment Federation
SubjectSession 8 - Challenges and Rehabilitation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2009
ISSN1938-6478
SICI1938-6478(20090101)2009:2L.523;1-
DOI10.2175/193864709793846961
Volume / Issue2009 / 2
Content sourceCollection Systems Conference
First / last page(s)523 - 531
Copyright2009
Word count393
Subject keywordsDesign-buildproject delivery methodCIPPUV-cured CIPP

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Design-Build Project Delivery for Sewer System Rehabilitation'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Design-Build Project Delivery for Sewer System Rehabilitation
Pricing
Non-member price: $11.50
Member price:
-296597
Get access
-296597
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Design-Build Project Delivery for Sewer System Rehabilitation'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Design-Build Project Delivery for Sewer System Rehabilitation
Abstract
This paper presents a case-study of a design-build project to rehabilitate 80,000 linear feet (LF) of small diameter sewers over a 20 mile square area on a large military base. The design-build process created a strong team effort among the engineer, contractor, subcontractors and owner.In order to rehabilitate a portion of its sanitary sewer system, a Government agency decided to utilize a design-build delivery. By selecting this approach, the same team could conduct the closed-circuit sewer inspection (CCTV), determine the necessary repairs and repair methods, perform value-engineering of the proposed rehabilitation, and complete the construction work all on going over two years. Construction activities were limited by numerous environmental constraints, traffic control issues, and coordination with residents and military activities.The design-builder prepared a cost proposal based on the existing CCTV and other information provided by the Government. The CCTV was five years old and partially incomplete. It was expected that conditions had changed, an issue that needed to be addressed in the early stages of the project. After the project was negotiated, the design-builder retelevised all pipeline segments to refine and update the scope of work and find the means to best-value alternatives to rehabilitate the system at a cost consistent with the original negotiated fee.A matrix-approach was developed to determine cost effective solutions at each site. Cured-inplace piping (CIPP) became the selected alternative to repair much of the existing cracked vitrified clay pipe and cured-in-place spot repairs were completed where only a portion of a sewer segment required rehabilitation. Open trench repair was performed for pipe sags, collapses or other major defects.This paper discusses the advantages and disadvantages of the design-build delivery method in regards to large conveyance projects. The case study will demonstrate that the project approach allowed the design-builder flexibility to adapt the project to existing site conditions within the original project budget. By having the contractor and engineer on the same team, the engineer could more easily review the sewer inspection videos and develop the scope of work while the contractor looked at constructability issues. The engineer collaborated with the contractor when alternative construction approaches were proposed to ensure the original design intent was still satisfied. This design-build delivery method also allowed the design-builder the flexibility to evaluate the use of newer technologies including the use of ultraviolet light cured CIPP.
This paper presents a case-study of a design-build project to rehabilitate 80,000 linear feet (LF) of small diameter sewers over a 20 mile square area on a large military base. The design-build process created a strong team effort among the engineer, contractor, subcontractors and owner.In order to rehabilitate a portion of its sanitary sewer system, a Government agency decided to utilize a...
Author(s)
Barbara Melcher
SourceProceedings of the Water Environment Federation
SubjectSession 8 - Challenges and Rehabilitation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2009
ISSN1938-6478
SICI1938-6478(20090101)2009:2L.523;1-
DOI10.2175/193864709793846961
Volume / Issue2009 / 2
Content sourceCollection Systems Conference
First / last page(s)523 - 531
Copyright2009
Word count393
Subject keywordsDesign-buildproject delivery methodCIPPUV-cured CIPP

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Barbara Melcher. Design-Build Project Delivery for Sewer System Rehabilitation. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 29 Jun. 2025. <https://www.accesswater.org?id=-296597CITANCHOR>.
Barbara Melcher. Design-Build Project Delivery for Sewer System Rehabilitation. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 29, 2025. https://www.accesswater.org/?id=-296597CITANCHOR.
Barbara Melcher
Design-Build Project Delivery for Sewer System Rehabilitation
Access Water
Water Environment Federation
December 22, 2018
June 29, 2025
https://www.accesswater.org/?id=-296597CITANCHOR