lastID = -297691
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Gilkey Creek Relocation and Restoration Project in Flint, Michigan
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 14:49:19 Adam Phillips
  • 2022-05-06 14:49:18 Adam Phillips
  • 2020-06-26 16:18:35 Katherine Saltzman
  • 2020-06-26 16:18:34 Katherine Saltzman
  • 2020-03-26 22:02:33 Adam Phillips
  • 2020-03-26 22:02:32 Adam Phillips
  • 2020-01-31 23:30:56 Administrator
  • 2020-01-31 23:30:55 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Gilkey Creek Relocation and Restoration Project in Flint, Michigan

Gilkey Creek Relocation and Restoration Project in Flint, Michigan

Gilkey Creek Relocation and Restoration Project in Flint, Michigan

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Gilkey Creek Relocation and Restoration Project in Flint, Michigan
Abstract
The relocation and restoration of over 1/2 mile of Gilkey Creek in Flint, Michigan was completed during the fall in 2007. The project - daylighting a portion of the creek that has been enclosed in a culvert for 25 years - has ended the flooding of the historic C.S. Mott estate, “Applewood”, with improved hydraulics, bank stability and habitat restoration along this restored reach of the creek. The project scope was developed around the mission statement of the Ruth Mott Foundation and focused on the creation of a demonstration project for the Flint and Genesee County areas, with emphasis on habitat restoration and environmental education.Critical design features include the introduction of habitat structures (boulders, tree roots and logs) harvested on-site, creation of a riparian corridor for terrestrial and aquatic species, construction of a 3/4-acre pond with wetland fringe for stormwater storage and site irrigation, and the extensive use of native plants and seed mixes throughout the site.Engineering considerations focused on:The evaluation of alternative alignments to provide the greatest benefit for the lowest cost.Maintaining the proper channel cross-section and side slopes necessary to significantly reduce the frequent flooding in the lower garden area of the estate.Achieve the proper channel slope to minimize the effect of channel head cutting within the relocated reach of the Creek.Sizing rock used in bank stabilization and channel substrate areas.Minimizing the use of riprap as the preferred solution through the introduction of bio-engineering solutions above base flow and where reduced creek flood velocities allowed the use of these treatments.Other design features include the use of fascines, vegetated gabions, plunge pools, riffles, eddy rock, and pervious pavement. The project will be used by the Ruth Mott Foundation to expand upon its current land stewardship and environmental educational programming for children in the Flint area.In addition to the natural system enhancement features, sustainable construction practices required the contractor to recycle all site demolition waste, use bio-diesel fuels for all heavy equipment, and use products that were manufactured within 500 miles of the site and/or were manufactured from recycled products.
The relocation and restoration of over 1/2 mile of Gilkey Creek in Flint, Michigan was completed during the fall in 2007. The project - daylighting a portion of the creek that has been enclosed in a culvert for 25 years - has ended the flooding of the historic C.S. Mott estate, “Applewood”, with improved hydraulics, bank stability and habitat restoration along this restored reach of...
Author(s)
Paul Evanoff
SourceProceedings of the Water Environment Federation
SubjectSession 4 (URR): Multifaced Appraoches to Urban River Restoration: Case Studies
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Mar, 2010
ISSN1938-6478
SICI1938-6478(20100101)2010:2L.367;1-
DOI10.2175/193864710798284814
Volume / Issue2010 / 2
Content sourceCities of the Future/Urban River Restoration Conference
First / last page(s)367 - 372
Copyright2010
Word count355
Subject keywordsRuth Mott FoundationApplewoodMaster PlanGilkey CreekUrban WatershedFloodingRiparian CorridorHabitat StructuresSustainable PracticesIntegrated Design ApproachPartnershipsStream Chanel GeometryPermittingBidding and Construction

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Gilkey Creek Relocation and Restoration Project in Flint, Michigan'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Gilkey Creek Relocation and Restoration Project in Flint, Michigan
Pricing
Non-member price: $11.50
Member price:
-297691
Get access
-297691
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Gilkey Creek Relocation and Restoration Project in Flint, Michigan'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Gilkey Creek Relocation and Restoration Project in Flint, Michigan
Abstract
The relocation and restoration of over 1/2 mile of Gilkey Creek in Flint, Michigan was completed during the fall in 2007. The project - daylighting a portion of the creek that has been enclosed in a culvert for 25 years - has ended the flooding of the historic C.S. Mott estate, “Applewood”, with improved hydraulics, bank stability and habitat restoration along this restored reach of the creek. The project scope was developed around the mission statement of the Ruth Mott Foundation and focused on the creation of a demonstration project for the Flint and Genesee County areas, with emphasis on habitat restoration and environmental education.Critical design features include the introduction of habitat structures (boulders, tree roots and logs) harvested on-site, creation of a riparian corridor for terrestrial and aquatic species, construction of a 3/4-acre pond with wetland fringe for stormwater storage and site irrigation, and the extensive use of native plants and seed mixes throughout the site.Engineering considerations focused on:The evaluation of alternative alignments to provide the greatest benefit for the lowest cost.Maintaining the proper channel cross-section and side slopes necessary to significantly reduce the frequent flooding in the lower garden area of the estate.Achieve the proper channel slope to minimize the effect of channel head cutting within the relocated reach of the Creek.Sizing rock used in bank stabilization and channel substrate areas.Minimizing the use of riprap as the preferred solution through the introduction of bio-engineering solutions above base flow and where reduced creek flood velocities allowed the use of these treatments.Other design features include the use of fascines, vegetated gabions, plunge pools, riffles, eddy rock, and pervious pavement. The project will be used by the Ruth Mott Foundation to expand upon its current land stewardship and environmental educational programming for children in the Flint area.In addition to the natural system enhancement features, sustainable construction practices required the contractor to recycle all site demolition waste, use bio-diesel fuels for all heavy equipment, and use products that were manufactured within 500 miles of the site and/or were manufactured from recycled products.
The relocation and restoration of over 1/2 mile of Gilkey Creek in Flint, Michigan was completed during the fall in 2007. The project - daylighting a portion of the creek that has been enclosed in a culvert for 25 years - has ended the flooding of the historic C.S. Mott estate, “Applewood”, with improved hydraulics, bank stability and habitat restoration along this restored reach of...
Author(s)
Paul Evanoff
SourceProceedings of the Water Environment Federation
SubjectSession 4 (URR): Multifaced Appraoches to Urban River Restoration: Case Studies
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Mar, 2010
ISSN1938-6478
SICI1938-6478(20100101)2010:2L.367;1-
DOI10.2175/193864710798284814
Volume / Issue2010 / 2
Content sourceCities of the Future/Urban River Restoration Conference
First / last page(s)367 - 372
Copyright2010
Word count355
Subject keywordsRuth Mott FoundationApplewoodMaster PlanGilkey CreekUrban WatershedFloodingRiparian CorridorHabitat StructuresSustainable PracticesIntegrated Design ApproachPartnershipsStream Chanel GeometryPermittingBidding and Construction

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Paul Evanoff. Gilkey Creek Relocation and Restoration Project in Flint, Michigan. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 6 Jun. 2025. <https://www.accesswater.org?id=-297691CITANCHOR>.
Paul Evanoff. Gilkey Creek Relocation and Restoration Project in Flint, Michigan. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 6, 2025. https://www.accesswater.org/?id=-297691CITANCHOR.
Paul Evanoff
Gilkey Creek Relocation and Restoration Project in Flint, Michigan
Access Water
Water Environment Federation
December 22, 2018
June 6, 2025
https://www.accesswater.org/?id=-297691CITANCHOR