lastID = -298616
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Start-Up Challenges in A Slow Economy: When Less than Design Minimum Rules
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 11:23:42 Adam Phillips
  • 2022-05-06 11:23:41 Adam Phillips
  • 2020-02-01 04:24:02 Administrator
  • 2020-02-01 04:24:01 Administrator
  • 2020-02-01 04:24:00 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Start-Up Challenges in A Slow Economy: When Less than Design Minimum Rules

Start-Up Challenges in A Slow Economy: When Less than Design Minimum Rules

Start-Up Challenges in A Slow Economy: When Less than Design Minimum Rules

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Start-Up Challenges in A Slow Economy: When Less than Design Minimum Rules
Abstract
The start-up of the Clark County Water Reclamation District (District) Moapa Valley Water Resource Center (MVWRC) presented several operational challenges. The influent flow and organic load was significantly less than the design minimum as the project schedule occurred during an unexpected economic turndown – that continues on today. In order to accelerate startup, the basins were seeded with thickened waste activated sludge from the District's Main Central Plant in Las Vegas. Instead of growing and stabilizing, the biomass essentially disappeared in a matter of weeks after seeding, resulting in a sharp decrease of the mixed liquor suspended solids concentration. Start-up troubleshooting indicated that a combination of solids settling, midge fly larvae invasion, uncontrolled solids wasting, and biofilm formation on tank walls caused the initial biomass instability. Inconsistent plant performance was also observed during start-up. Process modeling and field observations indicated that reduced organic load, excessive aeration, and biomass instability were the major causes of the inconsistent process performance. Process modifications were identified and implemented to address the start-up challenges experienced by District staff. Supplemental carbon was implemented on an emergency basis. The process configuration and aeration control were modified to minimize excessive aeration. The return activated sludge and mixed liquor internal recycle flows were adjusted to minimize solids settling in the structures. As a result of the start-up optimization effort, the MVWRC consistently exceeds both the design treatment goals and the mandated permit requirements.
The start-up of the Clark County Water Reclamation District (District) Moapa Valley Water Resource Center (MVWRC) presented several operational challenges. The influent flow and organic load was significantly less than the design minimum as the project schedule occurred during an unexpected economic turndown – that continues on today. In order to accelerate startup, the basins were seeded...
Author(s)
Keli CallahanEric LevequeJose Christiano Machado
SourceProceedings of the Water Environment Federation
SubjectSession 11: Putting the Right Foot Forward: Strategies for Successful Commissioning
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2011
ISSN1938-6478
SICI1938-6478(20110101)2011:17L.551;1-
DOI10.2175/193864711802639606
Volume / Issue2011 / 17
Content sourceWEFTEC
First / last page(s)551 - 565
Copyright2011
Word count245
Subject keywordsActivated sludgestart-upnitrogen removalBNR

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Start-Up Challenges in A Slow Economy: When Less than Design Minimum Rules'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Start-Up Challenges in A Slow Economy: When Less than Design Minimum Rules
Pricing
Non-member price: $11.50
Member price:
-298616
Get access
-298616
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Start-Up Challenges in A Slow Economy: When Less than Design Minimum Rules'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Start-Up Challenges in A Slow Economy: When Less than Design Minimum Rules
Abstract
The start-up of the Clark County Water Reclamation District (District) Moapa Valley Water Resource Center (MVWRC) presented several operational challenges. The influent flow and organic load was significantly less than the design minimum as the project schedule occurred during an unexpected economic turndown – that continues on today. In order to accelerate startup, the basins were seeded with thickened waste activated sludge from the District's Main Central Plant in Las Vegas. Instead of growing and stabilizing, the biomass essentially disappeared in a matter of weeks after seeding, resulting in a sharp decrease of the mixed liquor suspended solids concentration. Start-up troubleshooting indicated that a combination of solids settling, midge fly larvae invasion, uncontrolled solids wasting, and biofilm formation on tank walls caused the initial biomass instability. Inconsistent plant performance was also observed during start-up. Process modeling and field observations indicated that reduced organic load, excessive aeration, and biomass instability were the major causes of the inconsistent process performance. Process modifications were identified and implemented to address the start-up challenges experienced by District staff. Supplemental carbon was implemented on an emergency basis. The process configuration and aeration control were modified to minimize excessive aeration. The return activated sludge and mixed liquor internal recycle flows were adjusted to minimize solids settling in the structures. As a result of the start-up optimization effort, the MVWRC consistently exceeds both the design treatment goals and the mandated permit requirements.
The start-up of the Clark County Water Reclamation District (District) Moapa Valley Water Resource Center (MVWRC) presented several operational challenges. The influent flow and organic load was significantly less than the design minimum as the project schedule occurred during an unexpected economic turndown – that continues on today. In order to accelerate startup, the basins were seeded...
Author(s)
Keli CallahanEric LevequeJose Christiano Machado
SourceProceedings of the Water Environment Federation
SubjectSession 11: Putting the Right Foot Forward: Strategies for Successful Commissioning
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2011
ISSN1938-6478
SICI1938-6478(20110101)2011:17L.551;1-
DOI10.2175/193864711802639606
Volume / Issue2011 / 17
Content sourceWEFTEC
First / last page(s)551 - 565
Copyright2011
Word count245
Subject keywordsActivated sludgestart-upnitrogen removalBNR

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Keli Callahan# Eric Leveque# Jose Christiano Machado. Start-Up Challenges in A Slow Economy: When Less than Design Minimum Rules. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 29 Jun. 2025. <https://www.accesswater.org?id=-298616CITANCHOR>.
Keli Callahan# Eric Leveque# Jose Christiano Machado. Start-Up Challenges in A Slow Economy: When Less than Design Minimum Rules. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 29, 2025. https://www.accesswater.org/?id=-298616CITANCHOR.
Keli Callahan# Eric Leveque# Jose Christiano Machado
Start-Up Challenges in A Slow Economy: When Less than Design Minimum Rules
Access Water
Water Environment Federation
December 22, 2018
June 29, 2025
https://www.accesswater.org/?id=-298616CITANCHOR