lastID = -298999
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Major Outfall Replacement in a Highly Urbanized Setting
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:31:47 Adam Phillips
  • 2022-05-04 21:31:46 Adam Phillips
  • 2020-03-26 22:04:54 Adam Phillips
  • 2020-03-26 22:04:53 Adam Phillips
  • 2020-02-01 01:12:06 Administrator
  • 2020-02-01 01:12:05 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Major Outfall Replacement in a Highly Urbanized Setting

Major Outfall Replacement in a Highly Urbanized Setting

Major Outfall Replacement in a Highly Urbanized Setting

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Major Outfall Replacement in a Highly Urbanized Setting
Abstract
Sewer systems across the country are facing a similar challenge — aging infrastructure with limited funds to implement programs to repair or replace facilities on a regular, ongoing basis. What happens when the “heart” of the sewer system, an interceptor or outfall, needs to be replaced due to its condition or capacity? Generally these major pipelines are constructed in areas that may have once been undeveloped, but over the years have gradually been incorporated into the urban landscape. While its installation 50 or 100 years ago may have been an engineering marvel, replacing this same pipe today has many different challenges.The City of Greensboro, NC has ridden the weather–induced roller coaster of drought and flood just like most communities across North Carolina in the past several years. The prolonged drought of 1998–2002 caused attention to be focused on the City's water system, until heavy rains in 2003 and 2007 resulted in several sewer overflows and helped to refocus priorities on the condition of the sewer system. An area of particular concern has been the North Buffalo Creek Outfall, a 3–mile section of 36 to 48 inch gravity sewer located in the heart of the City and draining a significant portion of the system. Overflows within Latham Park, an urban oasis with bike trails, exercise stations, tennis courts, ball fields, and other recreation facilities, has generated particular concern from the public.This paper will address the myriad of challenges associated with replacing a sewer of this type in a highly urbanized setting. The entire process, from preliminary design to final construction, took approximately five years, and was completed in 2008. The sewer was not only replaced, but was upsized to 60 inch diameter to account for significant growth experienced in portions of the drainage basin. In addition to reviewing the project's design issues and public involvement efforts, we will also return to the site to show how the improvements have now been incorporated into the landscape since the completion of construction.The route of the sewer posed potential impacts to a number of diverse and environmentally sensitive areas, including a high profile City park, a historically significant textile mill structure in a redevelopment area, a bird sanctuary area operated by the Audubon Society, a large hospital, an industry under bankruptcy protection having control over a significant portion of the route, and abandoned Norfolk Southern Railroad spur lines. The route also crossed five high volume NCDOT roadways which required a significant amount of coordination to ensure uninterrupted traffic flow.Soil conditions impacted the design and construction of the sewer in a number of locations. Most notably, the new sewer passed through rock within 10 feet of a historical textile mill, requiring special blasting patterns and monitoring equipment, both inside and outside the facility. The sewer also was bored under a creek and large flood berm adjacent to the WWTP, requiring a modified approach to protect against creek water entering the excavation area.Public input and involvement was crucial to overall project success. An area of particular concern was Latham Park, which included a stream restoration component to take advantage of the sewer construction adjacent to an impaired stream. By combining input from various City departments and the public, a coordinated plan was developed to incorporate the new sewer and stormwater BMP's into the park landscape, resulting in a valuable asset for all concerned.The North Buffalo Creek Sewer Replacement project showcases the various difficulties and opportunities facing a community when having to replace a larger portion of its underground infrastructure within the confines of an urban setting. Careful planning, public involvement, and a vision for the future all contributed to making this a successful project, and the lessons learned here could certainly benefit other communities facing similar challenges.
Sewer systems across the country are facing a similar challenge — aging infrastructure with limited funds to implement programs to repair or replace facilities on a regular, ongoing basis. What happens when the “heart” of the sewer system, an interceptor or outfall, needs to be replaced due to its condition or capacity? Generally these major pipelines are constructed in areas...
Author(s)
David CainMelinda J. King
SourceProceedings of the Water Environment Federation
SubjectSession 11: Construct/Design
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2011
ISSN1938-6478
SICI1938-6478(20110101)2011:5L.706;1-
DOI10.2175/193864711802837093
Volume / Issue2011 / 5
Content sourceCollection Systems Conference
First / last page(s)706 - 715
Copyright2011
Word count632
Subject keywordsGravity sewerinflow and infiltration (I/I)stream restoration

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Major Outfall Replacement in a Highly Urbanized Setting'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Major Outfall Replacement in a Highly Urbanized Setting
Pricing
Non-member price: $11.50
Member price:
-298999
Get access
-298999
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Major Outfall Replacement in a Highly Urbanized Setting'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Major Outfall Replacement in a Highly Urbanized Setting
Abstract
Sewer systems across the country are facing a similar challenge — aging infrastructure with limited funds to implement programs to repair or replace facilities on a regular, ongoing basis. What happens when the “heart” of the sewer system, an interceptor or outfall, needs to be replaced due to its condition or capacity? Generally these major pipelines are constructed in areas that may have once been undeveloped, but over the years have gradually been incorporated into the urban landscape. While its installation 50 or 100 years ago may have been an engineering marvel, replacing this same pipe today has many different challenges.The City of Greensboro, NC has ridden the weather–induced roller coaster of drought and flood just like most communities across North Carolina in the past several years. The prolonged drought of 1998–2002 caused attention to be focused on the City's water system, until heavy rains in 2003 and 2007 resulted in several sewer overflows and helped to refocus priorities on the condition of the sewer system. An area of particular concern has been the North Buffalo Creek Outfall, a 3–mile section of 36 to 48 inch gravity sewer located in the heart of the City and draining a significant portion of the system. Overflows within Latham Park, an urban oasis with bike trails, exercise stations, tennis courts, ball fields, and other recreation facilities, has generated particular concern from the public.This paper will address the myriad of challenges associated with replacing a sewer of this type in a highly urbanized setting. The entire process, from preliminary design to final construction, took approximately five years, and was completed in 2008. The sewer was not only replaced, but was upsized to 60 inch diameter to account for significant growth experienced in portions of the drainage basin. In addition to reviewing the project's design issues and public involvement efforts, we will also return to the site to show how the improvements have now been incorporated into the landscape since the completion of construction.The route of the sewer posed potential impacts to a number of diverse and environmentally sensitive areas, including a high profile City park, a historically significant textile mill structure in a redevelopment area, a bird sanctuary area operated by the Audubon Society, a large hospital, an industry under bankruptcy protection having control over a significant portion of the route, and abandoned Norfolk Southern Railroad spur lines. The route also crossed five high volume NCDOT roadways which required a significant amount of coordination to ensure uninterrupted traffic flow.Soil conditions impacted the design and construction of the sewer in a number of locations. Most notably, the new sewer passed through rock within 10 feet of a historical textile mill, requiring special blasting patterns and monitoring equipment, both inside and outside the facility. The sewer also was bored under a creek and large flood berm adjacent to the WWTP, requiring a modified approach to protect against creek water entering the excavation area.Public input and involvement was crucial to overall project success. An area of particular concern was Latham Park, which included a stream restoration component to take advantage of the sewer construction adjacent to an impaired stream. By combining input from various City departments and the public, a coordinated plan was developed to incorporate the new sewer and stormwater BMP's into the park landscape, resulting in a valuable asset for all concerned.The North Buffalo Creek Sewer Replacement project showcases the various difficulties and opportunities facing a community when having to replace a larger portion of its underground infrastructure within the confines of an urban setting. Careful planning, public involvement, and a vision for the future all contributed to making this a successful project, and the lessons learned here could certainly benefit other communities facing similar challenges.
Sewer systems across the country are facing a similar challenge — aging infrastructure with limited funds to implement programs to repair or replace facilities on a regular, ongoing basis. What happens when the “heart” of the sewer system, an interceptor or outfall, needs to be replaced due to its condition or capacity? Generally these major pipelines are constructed in areas...
Author(s)
David CainMelinda J. King
SourceProceedings of the Water Environment Federation
SubjectSession 11: Construct/Design
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2011
ISSN1938-6478
SICI1938-6478(20110101)2011:5L.706;1-
DOI10.2175/193864711802837093
Volume / Issue2011 / 5
Content sourceCollection Systems Conference
First / last page(s)706 - 715
Copyright2011
Word count632
Subject keywordsGravity sewerinflow and infiltration (I/I)stream restoration

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
David Cain# Melinda J. King. Major Outfall Replacement in a Highly Urbanized Setting. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 30 Jun. 2025. <https://www.accesswater.org?id=-298999CITANCHOR>.
David Cain# Melinda J. King. Major Outfall Replacement in a Highly Urbanized Setting. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 30, 2025. https://www.accesswater.org/?id=-298999CITANCHOR.
David Cain# Melinda J. King
Major Outfall Replacement in a Highly Urbanized Setting
Access Water
Water Environment Federation
December 22, 2018
June 30, 2025
https://www.accesswater.org/?id=-298999CITANCHOR