Description: Successful I&I Reduction using Design-Build: Developing and Implementing the...
Successful I&I Reduction using Design-Build: Developing and Implementing the River Valley Highlands Design-Build Sewer Rehabilitation Project
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2023-08-16 08:27:03 Adam Phillips
  • 2022-05-06 12:39:26 Adam Phillips
  • 2022-05-06 12:39:25 Adam Phillips
  • 2020-09-24 12:12:12 Adam Phillips
  • 2020-09-24 10:23:59 Adam Phillips
  • 2020-09-24 10:23:58 Adam Phillips
  • 2020-09-24 07:28:01 Adam Phillips
  • 2020-09-24 07:28:00 Adam Phillips
  • 2020-09-23 16:27:01 Adam Phillips
  • 2020-09-23 16:26:59 Adam Phillips
  • 2020-09-23 15:02:06 Adam Phillips
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Successful I&I Reduction using Design-Build: Developing and Implementing the...
Successful I&I Reduction using Design-Build: Developing and Implementing the River Valley Highlands Design-Build Sewer Rehabilitation Project

Successful I&I Reduction using Design-Build: Developing and Implementing the River Valley Highlands Design-Build Sewer Rehabilitation Project

Successful I&I Reduction using Design-Build: Developing and Implementing the River Valley Highlands Design-Build Sewer Rehabilitation Project

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Successful I&I Reduction using Design-Build: Developing and Implementing the...
Successful I&I Reduction using Design-Build: Developing and Implementing the River Valley Highlands Design-Build Sewer Rehabilitation Project
Abstract
A developer installed sanitary sewer was causing repeated, unexplained basement backups during heavy rains 1-3 times per year within 5 years of installation. A turnkey sewer rehabilitation project using Progressive Design-Build to provide continuous highly collaborative interaction between the Owner, Engineer, Construction Manager, and Subcontractors was used to solve this problem. This project successfully eliminated almost all the rainfall derived inflow and infiltration (RDII) leakage into the system and eliminated the basement backups that had been occurring.
A developer installed sanitary sewer was causing repeated, unexplained basement backups during heavy rains 1-3 times per year within 5 years of installation. A turnkey sewer rehabilitation project using Progressive Design-Build to provide continuous highly collaborative interaction between the Owner, Engineer, Construction Manager, and Subcontractors was used to solve this problem. This project successfully eliminated almost all the rainfall derived inflow and infiltration (RDII) leakage into the system and eliminated the basement backups that had been occurring.
SpeakerShelton, James
Presentation time
12:30:00
13:00:00
Session time
11:30:00
12:30:00
SessionInflow/Infiltration: Fighting the I/I
Session number7D
TopicCollection Systems, Watershed Management, Water Quality, and Groundwater
TopicCollection Systems, Watershed Management, Water Quality, and Groundwater
Author(s)
J. SheltonE.A. Sadowsky
Author(s)J. Shelton1; E.A. Sadowsky1;
Author affiliation(s)Arcadis 1
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Oct 2020
DOI10.2175/193864718825157376
Volume / Issue
Content sourceWEFTEC
Copyright2020
Word count17

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Successful I&I Reduction using Design-Build: Developing and Implementing the River Valley Highlands Design-Build Sewer Rehabilitation Project'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Successful I&I Reduction using Design-Build: Developing and Implementing the...
Successful I&I Reduction using Design-Build: Developing and Implementing the River Valley Highlands Design-Build Sewer Rehabilitation Project
Pricing
Non-member price: $11.50
Member price:
-10028676
Get access
-10028676
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Successful I&I Reduction using Design-Build: Developing and Implementing the River Valley Highlands Design-Build Sewer Rehabilitation Project'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Successful I&I Reduction using Design-Build: Developing and Implementing the...
Successful I&I Reduction using Design-Build: Developing and Implementing the River Valley Highlands Design-Build Sewer Rehabilitation Project
Abstract
A developer installed sanitary sewer was causing repeated, unexplained basement backups during heavy rains 1-3 times per year within 5 years of installation. A turnkey sewer rehabilitation project using Progressive Design-Build to provide continuous highly collaborative interaction between the Owner, Engineer, Construction Manager, and Subcontractors was used to solve this problem. This project successfully eliminated almost all the rainfall derived inflow and infiltration (RDII) leakage into the system and eliminated the basement backups that had been occurring.
A developer installed sanitary sewer was causing repeated, unexplained basement backups during heavy rains 1-3 times per year within 5 years of installation. A turnkey sewer rehabilitation project using Progressive Design-Build to provide continuous highly collaborative interaction between the Owner, Engineer, Construction Manager, and Subcontractors was used to solve this problem. This project successfully eliminated almost all the rainfall derived inflow and infiltration (RDII) leakage into the system and eliminated the basement backups that had been occurring.
SpeakerShelton, James
Presentation time
12:30:00
13:00:00
Session time
11:30:00
12:30:00
SessionInflow/Infiltration: Fighting the I/I
Session number7D
TopicCollection Systems, Watershed Management, Water Quality, and Groundwater
TopicCollection Systems, Watershed Management, Water Quality, and Groundwater
Author(s)
J. SheltonE.A. Sadowsky
Author(s)J. Shelton1; E.A. Sadowsky1;
Author affiliation(s)Arcadis 1
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Oct 2020
DOI10.2175/193864718825157376
Volume / Issue
Content sourceWEFTEC
Copyright2020
Word count17

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
J. Shelton#E.A. Sadowsky#. Successful I&I Reduction using Design-Build: Developing and Implementing the River Valley Highlands Design-Build Sewer Rehabilitation Project. Water Environment Federation, 2020. Web. 13 May. 2025. <https://www.accesswater.org?id=-10028676CITANCHOR>.
J. Shelton#E.A. Sadowsky#. Successful I&I Reduction using Design-Build: Developing and Implementing the River Valley Highlands Design-Build Sewer Rehabilitation Project. Water Environment Federation, 2020. Accessed May 13, 2025. https://www.accesswater.org/?id=-10028676CITANCHOR.
J. Shelton#E.A. Sadowsky#
Successful I&I Reduction using Design-Build: Developing and Implementing the River Valley Highlands Design-Build Sewer Rehabilitation Project
Access Water
Water Environment Federation
October 6, 2020
May 13, 2025
https://www.accesswater.org/?id=-10028676CITANCHOR