lastID = -10044430
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping
Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2023-08-16 08:11:32 Adam Phillips
  • 2022-05-04 21:28:27 Adam Phillips
  • 2022-05-04 21:28:26 Adam Phillips
  • 2021-03-22 21:31:53 Adam Phillips
  • 2021-03-22 21:19:54 Adam Phillips Release
  • 2021-03-22 09:26:17 Adam Phillips
  • 2021-03-22 09:21:51 Adam Phillips
  • 2021-03-17 17:52:26 Adam Phillips
  • 2021-03-17 17:52:25 Adam Phillips
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping
Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping

Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping

Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping
Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping
Abstract
Public water agencies throughout the United States face many challenges with extending the reliable service life of their aging buried infrastructure. The San Jose/Santa Clara Regional Wastewater Facility (RWF) has the capacity to treat approximately 200mgd, with ongoing projects expanding this number. It is located in the City of San Jose (City) and has approximately 67,000 linear feet (LF) of buried wastewater process pipes, many of which were installed in the '50s and '60s and thus have exceeded their design life. Because of the potential terminal condition for some RWF piping, the City is using this Project to increase operational reliability and mitigate the likelihood of failure of their existing buried linear assets. If selected, the purpose of this presentation would be to share BV and the City of San Jose's approach to a large-scale piping condition assessment and rehabilitation effort. The presentation would include a description of the risk tool that BV developed exclusively for this project, condition assessment methods that were implemented, and rehabilitation methods that were selected. Fortunately for these agencies, many viable pipe rehabilitation methods have been invented to date, and there are often large pools of contractors vying for the job. Unfortunately for these agencies, there is rarely a platform available to share feedback or lessons learned from prior projects, even between neighboring cities. Furthermore, it is rare for an agency to embark on such a large, comprehensive project. Therefore, the largest benefit of this presentation would be the ability to share BV and the City's approach to delivering an on-time/under budget project, which started with developing a piping inspection prioritization tool and ended with rehabilitating pipes to provide an additional 50-year service life. In 2018, the City retained Black & Veatch (BV) for the Yard Piping Improvements Project (Project) to systematically assess all buried process pipes 8 inches to 144 inches at the RWF, which equates to approximately 60,000 LF of piping. Pipes at the RWF are comprised of many materials, but are primarily made of either reinforced concrete, ductile iron, or welded steel. The focus of the multi-year Project is to repair, rehabilitate, or replace (R/R/R) pipes, or portions of pipes, that are highest priority by virtue of their criticality and/or observed physical condition. In 2015, as part of a separate project, BV developed a condition assessment plan that provided a prioritized list of critical pipes for inspection, inspection protocol recommendations, and end of life estimates. The plan used weighted risk factors to determine the LOF (likelihood of failure) and COF (consequence of failure) for each assessed pipe. Depending upon identified pipe risk, inspection protocols and desired levels of inspection detail were determined for each pipeline. The final report produced in 2015 has served as the technical basis for the current Yard Piping Improvements Project, and the recommendations provided in that initial report have largely been followed. To date, approximately 36,000 LF of primary and secondary treatment piping has been inspected. Following each inspection, BV reviews the resultant condition data and makes R/R/R recommendations based on the findings. The Project follows an annual cyclical schedule whereby pipes are inspected during the regional dry-weather season, design work based upon these inspections occurs during the wet weather season, and R/R/R construction proceeds in the next dry-weather season. There is a separate service order for each year's pipe rehabilitation design, and a design-bid-build (DBB) project model is followed for each service order. Approximately 2,200 LF of the 36,000 LF inspected to date was identified to have severe deficiencies requiring R/R/R, and these pipe segments have since been rehabilitated. The scope for the first pipe rehabilitation service order contained primary effluent 96-inch reinforced concrete pipe (RCP) and an elliptical 87x136-inchpipeline. Beginning in the '50s, the RWF has slowly expanded to add more effective treatment processes and to increase the overall plant capacity. As a result of this expansion, there are many buried crossing utilities that preclude the feasibility of applying many traditional rehabilitation methods, resulting in a trenchless method focus. Ultimately, the 96' pipeline was rehabilitated with CIPP, and the 87'x136' was rehabilitated using a combination of concrete crown restoration with geopolymer material with an epoxy top coating. The second pipe rehabilitation service order, which is currently in the design phase, contains more primary effluent RCP including 78-inch, 96-inch, and 84-inch pipeline. CIPP was selected as a rehabilitation method for both the 78-inch and 96-inch pipelines, and concrete crown repair with a with an epoxy top coating selected for the 84-inch pipeline. The overall project is scheduled to be completed in 2026, with phases completed each year. The presentation of the Project, which has never been presented at a WEF Collections Conference to date, will focus on condition and risk assessment, selection of inspection methods and applications, the criteria against which rehabilitation alternatives are compared, planning and successfully executing pipeline rehabilitation.
The following conference paper was presented at Collection Systems 2021: A Virtual Event, March 23-25, 2021.
SpeakerRodriguez, Daniel
Presentation time
15:40:00
16:00:00
Session time
15:00:00
16:00:00
SessionRehabilitation
Session number3
Session locationSimu-live
TopicAlternative Delivery Systems (Design-Build-Operate-Transfer), Collection Systems, Condition Assessment, Industrial Water/Wastewater/Process Water, Rehabilitation, Trenchless Technology, UV Cured-in-Place-Pipe
TopicAlternative Delivery Systems (Design-Build-Operate-Transfer), Collection Systems, Condition Assessment, Industrial Water/Wastewater/Process Water, Rehabilitation, Trenchless Technology, UV Cured-in-Place-Pipe
Author(s)
D. Rodriguez
Author(s)D. Rodriguez1
Author affiliation(s)Black & Veatch1
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Mar 2021
DOI10.2175/193864718825157702
Volume / Issue
Content sourceCollection Systems Conference
Copyright2021
Word count13

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping
Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping
Pricing
Non-member price: $11.50
Member price:
-10044430
Get access
-10044430
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping
Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping
Abstract
Public water agencies throughout the United States face many challenges with extending the reliable service life of their aging buried infrastructure. The San Jose/Santa Clara Regional Wastewater Facility (RWF) has the capacity to treat approximately 200mgd, with ongoing projects expanding this number. It is located in the City of San Jose (City) and has approximately 67,000 linear feet (LF) of buried wastewater process pipes, many of which were installed in the '50s and '60s and thus have exceeded their design life. Because of the potential terminal condition for some RWF piping, the City is using this Project to increase operational reliability and mitigate the likelihood of failure of their existing buried linear assets. If selected, the purpose of this presentation would be to share BV and the City of San Jose's approach to a large-scale piping condition assessment and rehabilitation effort. The presentation would include a description of the risk tool that BV developed exclusively for this project, condition assessment methods that were implemented, and rehabilitation methods that were selected. Fortunately for these agencies, many viable pipe rehabilitation methods have been invented to date, and there are often large pools of contractors vying for the job. Unfortunately for these agencies, there is rarely a platform available to share feedback or lessons learned from prior projects, even between neighboring cities. Furthermore, it is rare for an agency to embark on such a large, comprehensive project. Therefore, the largest benefit of this presentation would be the ability to share BV and the City's approach to delivering an on-time/under budget project, which started with developing a piping inspection prioritization tool and ended with rehabilitating pipes to provide an additional 50-year service life. In 2018, the City retained Black & Veatch (BV) for the Yard Piping Improvements Project (Project) to systematically assess all buried process pipes 8 inches to 144 inches at the RWF, which equates to approximately 60,000 LF of piping. Pipes at the RWF are comprised of many materials, but are primarily made of either reinforced concrete, ductile iron, or welded steel. The focus of the multi-year Project is to repair, rehabilitate, or replace (R/R/R) pipes, or portions of pipes, that are highest priority by virtue of their criticality and/or observed physical condition. In 2015, as part of a separate project, BV developed a condition assessment plan that provided a prioritized list of critical pipes for inspection, inspection protocol recommendations, and end of life estimates. The plan used weighted risk factors to determine the LOF (likelihood of failure) and COF (consequence of failure) for each assessed pipe. Depending upon identified pipe risk, inspection protocols and desired levels of inspection detail were determined for each pipeline. The final report produced in 2015 has served as the technical basis for the current Yard Piping Improvements Project, and the recommendations provided in that initial report have largely been followed. To date, approximately 36,000 LF of primary and secondary treatment piping has been inspected. Following each inspection, BV reviews the resultant condition data and makes R/R/R recommendations based on the findings. The Project follows an annual cyclical schedule whereby pipes are inspected during the regional dry-weather season, design work based upon these inspections occurs during the wet weather season, and R/R/R construction proceeds in the next dry-weather season. There is a separate service order for each year's pipe rehabilitation design, and a design-bid-build (DBB) project model is followed for each service order. Approximately 2,200 LF of the 36,000 LF inspected to date was identified to have severe deficiencies requiring R/R/R, and these pipe segments have since been rehabilitated. The scope for the first pipe rehabilitation service order contained primary effluent 96-inch reinforced concrete pipe (RCP) and an elliptical 87x136-inchpipeline. Beginning in the '50s, the RWF has slowly expanded to add more effective treatment processes and to increase the overall plant capacity. As a result of this expansion, there are many buried crossing utilities that preclude the feasibility of applying many traditional rehabilitation methods, resulting in a trenchless method focus. Ultimately, the 96' pipeline was rehabilitated with CIPP, and the 87'x136' was rehabilitated using a combination of concrete crown restoration with geopolymer material with an epoxy top coating. The second pipe rehabilitation service order, which is currently in the design phase, contains more primary effluent RCP including 78-inch, 96-inch, and 84-inch pipeline. CIPP was selected as a rehabilitation method for both the 78-inch and 96-inch pipelines, and concrete crown repair with a with an epoxy top coating selected for the 84-inch pipeline. The overall project is scheduled to be completed in 2026, with phases completed each year. The presentation of the Project, which has never been presented at a WEF Collections Conference to date, will focus on condition and risk assessment, selection of inspection methods and applications, the criteria against which rehabilitation alternatives are compared, planning and successfully executing pipeline rehabilitation.
The following conference paper was presented at Collection Systems 2021: A Virtual Event, March 23-25, 2021.
SpeakerRodriguez, Daniel
Presentation time
15:40:00
16:00:00
Session time
15:00:00
16:00:00
SessionRehabilitation
Session number3
Session locationSimu-live
TopicAlternative Delivery Systems (Design-Build-Operate-Transfer), Collection Systems, Condition Assessment, Industrial Water/Wastewater/Process Water, Rehabilitation, Trenchless Technology, UV Cured-in-Place-Pipe
TopicAlternative Delivery Systems (Design-Build-Operate-Transfer), Collection Systems, Condition Assessment, Industrial Water/Wastewater/Process Water, Rehabilitation, Trenchless Technology, UV Cured-in-Place-Pipe
Author(s)
D. Rodriguez
Author(s)D. Rodriguez1
Author affiliation(s)Black & Veatch1
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Mar 2021
DOI10.2175/193864718825157702
Volume / Issue
Content sourceCollection Systems Conference
Copyright2021
Word count13

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
D. Rodriguez. Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping. Water Environment Federation, 2021. Web. 12 May. 2025. <https://www.accesswater.org?id=-10044430CITANCHOR>.
D. Rodriguez. Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping. Water Environment Federation, 2021. Accessed May 12, 2025. https://www.accesswater.org/?id=-10044430CITANCHOR.
D. Rodriguez
Inside the Fence: Assessing and Remediating 60+ Year Old Critical Plant Piping
Access Water
Water Environment Federation
March 23, 2021
May 12, 2025
https://www.accesswater.org/?id=-10044430CITANCHOR