lastID = -10082019
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned...
Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned from a Three-Year Pilot at a Pennsylvania WWTF (>1.3 wet metric tons/hr)
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2023-08-16 07:53:24 Adam Phillips
  • 2022-05-31 08:18:22 Adam Phillips
  • 2022-05-31 08:17:13 Adam Phillips
  • 2022-05-23 21:05:48 Adam Phillips Release
  • 2022-05-23 20:43:52 Adam Phillips
  • 2022-05-23 20:43:51 Adam Phillips
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned...
Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned from a Three-Year Pilot at a Pennsylvania WWTF (>1.3 wet metric tons/hr)

Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned from a Three-Year Pilot at a Pennsylvania WWTF (>1.3 wet metric tons/hr)

Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned from a Three-Year Pilot at a Pennsylvania WWTF (>1.3 wet metric tons/hr)

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned...
Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned from a Three-Year Pilot at a Pennsylvania WWTF (>1.3 wet metric tons/hr)
Abstract
Introduction
The Morrisville Biosolids Gasification Pilot Project (the Project) demonstrated that Ecoremedy's Fluid Lift Gasification technology can reliably dry and gasify industrial volumes of dewatered biosolids without bulking agents or fossil fuel. The Project garnered international interest and was lauded by industry experts during tours.

This case study explores how a public-private partnership enabled piloting of this innovative technology. After briefly reviewing design, construction, permitting, and commissioning, this presentation will summarize key accomplishments, including a summary of "lessons learned" during this historic project.

Design and Construction
The Morrisville Municipal Authority (MMA) is developing a new wastewater treatment facility (WWTF) at a nearby industrial park to replace the existing WWTF. The goal of the Project was to demonstrate Ecoremedy's FLG technology at the existing WWTF for potential inclusion at the new WWTF.

The MMA provided a greenfield site and waste supply to the Project through a pilot agreement signed in July 2018. Within one year, Ecoremedy completed design, construction, and Phase I permitting. The Project was self-financed by Ecoremedy under a Build-Own-Operate-Maintain model and operated on a tip-fee basis. Startup extended from July 2019 through February 2020, after delays from COVID-19. After commissioning, the Project operated until August 2021.

Ecoremedy completed engineering design in only three months. This was possible by leveraging decades of past success with high-ash, high-moisture manure-based feedstocks, including a week-long demonstration with composted biosolids. The Project was a 7x scale-up from past commercial projects.

A single process train was designed to operate for both Phase I loading (up to 4,536 wet metric tons/yr of undigested cake at 18-22% solids from the MMA's filter belt press) and Phase II loading (18,144 wet metric tons/yr of regional merchant capacity, with 22,680 wet metric tons/yr of total system capacity). It was designed to convert cake to three end-products without shutting down or retooling: concentrated minerals (ash fraction), carbon-rich biochar, and dried Class A product (permitted as an EPA recognized "Alternative Fuel").

The Project was housed in a single-story post and beam, metal-clad building (30 m long x 15 m wide with an eave height of 8 m) adjacent to the MMA's dewatering building. Pumping was not possible, so a receiving building was added to accept roll-off containers from MMA and cake hauled in from off-site. The building was selected for easy deconstruction due to the temporary nature of the pilot location.

Permitting
For Phase I, Ecoremedy submitted a Request for Determination of eligibility for a Permit By Rule (PBR) as a captive waste processer with de minimis air emissions. The PA Department of Environmental Protection (PA DEP) granted the PBR permit, with additional flexibility for R&D activities. Without previous biosolids gasification air data, air emissions were modeled using stack data from Ecoremedy poultry litter gasification projects. The elemental analysis of biosolids is similar to poultry litter for energy comparison.

Phase II air permitting required stack testing to validate emissions modeling as a minor source status, or potential de minimis source.

PA DEP granted a general waste permit for Phases I and II, as well as a Phase III expansion to multiple process trains (99,790 wet metric tons/yr). Following precedent from past FLG projects and similar technologies, the Project was deemed a non-incineration technology in PA, and later by the United States Environmental Protection Agency.

Operations
The Project was designed for continuous round-the-clock operation. Due to site-specific conditions and circumstances caused by COVID-19, Ecoremedy operated the facility with daily startup and shutdown on a five-day work week for two years. Automated operations were overseen by two operators per shift.

Project Results and Lessons Learned

Major successes of the Project include:
• Autothermal gasification of biosolids with temperatures across the gasifier and oxidizer ranging from 815 C - 1093 C and natural gas used only during start-up
• Fully automated biosolids drying with temperature drop across of 400 C across the dryer
• Sustained throughput of over 1.4 wet metric tons per hour with two-shift operations and daily shutdown
• Incoming PFAS levels ranged from 1 - 400 ppb per compound in pressed biosolids. 36 PFAS compounds were each reduced to non-detect (<2 ppb) in concentrated minerals after gasification.
• Non-detect odors from Ecoremedy process discharge during steady-state operations
• Consistent production of granular Class A biosolids > 90% TS with low-dust, suitable for land application and use as an EPA-recognized Alternative Fuel
• Consistent production of concentrated minerals suitable for land application or landfill
• Technology-wide determination from US EPA that FLG is not subject to the Sewage Sludge Incineration (SSI) Rule

Lessons learned include:
• Upgrades were needed for the mixer, material handling, bucket elevator, and odor control systems
• When possible, excess thermal energy recovered from the biosolids should be used to preheat the stack for plume abatement due to negative public perception of steam
• To prevent overnight freezing of a carbon filter, 24-hour operations and a condensing venturi scrubber are preferred with a targeted RH of 60%
• Direct pumping of dewatered biosolids to the mixer is preferred to avoid overworking the cake during material handling

Project Completion
On August 23, 2021, when the plant was offline for the weekend, a fire started in the receiving building. No one was injured. The fire marshal's official report ruled the cause of the fire as accidental. There was insufficient time left in the pilot agreement to rebuild and resume operations. Ecoremedy and the MMA agreed to conclude the pilot.

Next Steps and Conclusion
As a result of the Project's successes, the MMA remains interested in the potential of Ecoremedy's gasification technology to halt the rising costs and environmental hazards associated with biosolids disposal. The industrial park where the new MMA WWTF is being constructed has changed ownership and now requires the new WWTF to be completed (estimated 2026) before Ecoremedy can begin construction. At the time of this writing, Ecoremedy is evaluating project sites near Philadelphia for a regional merchant facility, with a general waste permit already granted for 99,790 wet metric tons/yr.

Knowledge gained from the Project, including the Lessons Learned above, were applied to the design of the Edmonds Project near Seattle, WA. The Edmonds Project has a design capacity of 12,927 wet metric tons/yr of dewatered biosolids, with co-gasification of all grit and screenings, and will be installed in 2022.

This paper will present the challenges overcome and advancements made by this historic project, including the operations data in the figures and tables following this abstract.
This paper was presented at the WEF Residuals and Biosolids Conference in Columbus, Ohio, May 24-27, 2022.
SpeakerMooney, Dave
Presentation time
10:00:00
Session time
11:45:00
Session number06
Session locationGreater Columbus Convention Center, Columbus, Ohio
Author(s)
D. Mooney
Author(s)D. Mooney1; B. Novak2; C. Holcomb3
Author affiliation(s)Residuals and Biosolids Speaker; 1Ecoremedy; 2Ecoremedy LLC; 3
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date May 2022
DOI10.2175/193864718825158394
Volume / Issue
Content sourceResiduals and Biosolids
Copyright2022
Word count22

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned from a Three-Year Pilot at a Pennsylvania WWTF (>1.3 wet metric tons/hr)'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned...
Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned from a Three-Year Pilot at a Pennsylvania WWTF (>1.3 wet metric tons/hr)
Pricing
Non-member price: $11.50
Member price:
-10082019
Get access
-10082019
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned from a Three-Year Pilot at a Pennsylvania WWTF (>1.3 wet metric tons/hr)'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned...
Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned from a Three-Year Pilot at a Pennsylvania WWTF (>1.3 wet metric tons/hr)
Abstract
Introduction
The Morrisville Biosolids Gasification Pilot Project (the Project) demonstrated that Ecoremedy's Fluid Lift Gasification technology can reliably dry and gasify industrial volumes of dewatered biosolids without bulking agents or fossil fuel. The Project garnered international interest and was lauded by industry experts during tours.

This case study explores how a public-private partnership enabled piloting of this innovative technology. After briefly reviewing design, construction, permitting, and commissioning, this presentation will summarize key accomplishments, including a summary of "lessons learned" during this historic project.

Design and Construction
The Morrisville Municipal Authority (MMA) is developing a new wastewater treatment facility (WWTF) at a nearby industrial park to replace the existing WWTF. The goal of the Project was to demonstrate Ecoremedy's FLG technology at the existing WWTF for potential inclusion at the new WWTF.

The MMA provided a greenfield site and waste supply to the Project through a pilot agreement signed in July 2018. Within one year, Ecoremedy completed design, construction, and Phase I permitting. The Project was self-financed by Ecoremedy under a Build-Own-Operate-Maintain model and operated on a tip-fee basis. Startup extended from July 2019 through February 2020, after delays from COVID-19. After commissioning, the Project operated until August 2021.

Ecoremedy completed engineering design in only three months. This was possible by leveraging decades of past success with high-ash, high-moisture manure-based feedstocks, including a week-long demonstration with composted biosolids. The Project was a 7x scale-up from past commercial projects.

A single process train was designed to operate for both Phase I loading (up to 4,536 wet metric tons/yr of undigested cake at 18-22% solids from the MMA's filter belt press) and Phase II loading (18,144 wet metric tons/yr of regional merchant capacity, with 22,680 wet metric tons/yr of total system capacity). It was designed to convert cake to three end-products without shutting down or retooling: concentrated minerals (ash fraction), carbon-rich biochar, and dried Class A product (permitted as an EPA recognized "Alternative Fuel").

The Project was housed in a single-story post and beam, metal-clad building (30 m long x 15 m wide with an eave height of 8 m) adjacent to the MMA's dewatering building. Pumping was not possible, so a receiving building was added to accept roll-off containers from MMA and cake hauled in from off-site. The building was selected for easy deconstruction due to the temporary nature of the pilot location.

Permitting
For Phase I, Ecoremedy submitted a Request for Determination of eligibility for a Permit By Rule (PBR) as a captive waste processer with de minimis air emissions. The PA Department of Environmental Protection (PA DEP) granted the PBR permit, with additional flexibility for R&D activities. Without previous biosolids gasification air data, air emissions were modeled using stack data from Ecoremedy poultry litter gasification projects. The elemental analysis of biosolids is similar to poultry litter for energy comparison.

Phase II air permitting required stack testing to validate emissions modeling as a minor source status, or potential de minimis source.

PA DEP granted a general waste permit for Phases I and II, as well as a Phase III expansion to multiple process trains (99,790 wet metric tons/yr). Following precedent from past FLG projects and similar technologies, the Project was deemed a non-incineration technology in PA, and later by the United States Environmental Protection Agency.

Operations
The Project was designed for continuous round-the-clock operation. Due to site-specific conditions and circumstances caused by COVID-19, Ecoremedy operated the facility with daily startup and shutdown on a five-day work week for two years. Automated operations were overseen by two operators per shift.

Project Results and Lessons Learned

Major successes of the Project include:
• Autothermal gasification of biosolids with temperatures across the gasifier and oxidizer ranging from 815 C - 1093 C and natural gas used only during start-up
• Fully automated biosolids drying with temperature drop across of 400 C across the dryer
• Sustained throughput of over 1.4 wet metric tons per hour with two-shift operations and daily shutdown
• Incoming PFAS levels ranged from 1 - 400 ppb per compound in pressed biosolids. 36 PFAS compounds were each reduced to non-detect (<2 ppb) in concentrated minerals after gasification.
• Non-detect odors from Ecoremedy process discharge during steady-state operations
• Consistent production of granular Class A biosolids > 90% TS with low-dust, suitable for land application and use as an EPA-recognized Alternative Fuel
• Consistent production of concentrated minerals suitable for land application or landfill
• Technology-wide determination from US EPA that FLG is not subject to the Sewage Sludge Incineration (SSI) Rule

Lessons learned include:
• Upgrades were needed for the mixer, material handling, bucket elevator, and odor control systems
• When possible, excess thermal energy recovered from the biosolids should be used to preheat the stack for plume abatement due to negative public perception of steam
• To prevent overnight freezing of a carbon filter, 24-hour operations and a condensing venturi scrubber are preferred with a targeted RH of 60%
• Direct pumping of dewatered biosolids to the mixer is preferred to avoid overworking the cake during material handling

Project Completion
On August 23, 2021, when the plant was offline for the weekend, a fire started in the receiving building. No one was injured. The fire marshal's official report ruled the cause of the fire as accidental. There was insufficient time left in the pilot agreement to rebuild and resume operations. Ecoremedy and the MMA agreed to conclude the pilot.

Next Steps and Conclusion
As a result of the Project's successes, the MMA remains interested in the potential of Ecoremedy's gasification technology to halt the rising costs and environmental hazards associated with biosolids disposal. The industrial park where the new MMA WWTF is being constructed has changed ownership and now requires the new WWTF to be completed (estimated 2026) before Ecoremedy can begin construction. At the time of this writing, Ecoremedy is evaluating project sites near Philadelphia for a regional merchant facility, with a general waste permit already granted for 99,790 wet metric tons/yr.

Knowledge gained from the Project, including the Lessons Learned above, were applied to the design of the Edmonds Project near Seattle, WA. The Edmonds Project has a design capacity of 12,927 wet metric tons/yr of dewatered biosolids, with co-gasification of all grit and screenings, and will be installed in 2022.

This paper will present the challenges overcome and advancements made by this historic project, including the operations data in the figures and tables following this abstract.
This paper was presented at the WEF Residuals and Biosolids Conference in Columbus, Ohio, May 24-27, 2022.
SpeakerMooney, Dave
Presentation time
10:00:00
Session time
11:45:00
Session number06
Session locationGreater Columbus Convention Center, Columbus, Ohio
Author(s)
D. Mooney
Author(s)D. Mooney1; B. Novak2; C. Holcomb3
Author affiliation(s)Residuals and Biosolids Speaker; 1Ecoremedy; 2Ecoremedy LLC; 3
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date May 2022
DOI10.2175/193864718825158394
Volume / Issue
Content sourceResiduals and Biosolids
Copyright2022
Word count22

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
D. Mooney. Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned from a Three-Year Pilot at a Pennsylvania WWTF (>1.3 wet metric tons/hr). Water Environment Federation, 2022. Web. 20 Jun. 2025. <https://www.accesswater.org?id=-10082019CITANCHOR>.
D. Mooney. Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned from a Three-Year Pilot at a Pennsylvania WWTF (>1.3 wet metric tons/hr). Water Environment Federation, 2022. Accessed June 20, 2025. https://www.accesswater.org/?id=-10082019CITANCHOR.
D. Mooney
Auto-Thermal Gasification and Biosolids Drying: Achievements and Lessons Learned from a Three-Year Pilot at a Pennsylvania WWTF (>1.3 wet metric tons/hr)
Access Water
Water Environment Federation
May 26, 2022
June 20, 2025
https://www.accesswater.org/?id=-10082019CITANCHOR