lastID = -10102383
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New...
Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New England Case Studies
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2024-04-08 21:59:47 Adam Phillips Release
  • 2024-04-08 21:38:30 Adam Phillips
  • 2024-04-08 21:07:22 Adam Phillips
  • 2024-04-08 20:49:25 Adam Phillips
  • 2024-04-08 16:40:31 Adam Phillips
  • 2024-04-08 15:33:25 Adam Phillips
  • 2024-04-08 14:43:25 Adam Phillips
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New...
Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New England Case Studies

Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New England Case Studies

Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New England Case Studies

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New...
Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New England Case Studies
Abstract
Collection systems and treatment facilities serve as an important environmental line of defense against wastewater contamination of groundwater and coastal embayments. With more intense and frequent storm events and rising sea levels, many communities are facing an increased risk to critical wastewater infrastructure from flooding and storm damage affecting critical wastewater infrastructure (Figure 1). This presentation will use case studies for collection system infrastructure along multiple types of waterbodies to discuss flood resilience measures being evaluated and implemented in Southeastern Massachusetts. The case studies discuss collection system infrastructure along: -Complex coastal estuarine shorelines -Open ocean -Tidally influenced coastal ponds -Inland river flood plains The presentation will also focus on how these communities are incorporating accommodations for projected changes in storm intensity and frequency into flood resilience evaluation, design and construction. A brief description of each case study is summarized below. Town of Wareham, MA (complex coastal estuarine shorelines) - The Town of Wareham is a coastal community with over 54 miles of coastline. Hydraulic constrictions caused by the complex coastal estuarine system results in high anticipated flood levels, up to 21 feet above mean sea level. The Town recently completed a 'Risk and Vulnerability Assessment', which provided them with a valuable tool to quantify the anticipated costs borne to the Town and its citizens if any vulnerable pump station failed during a 100-year storm event. The assessment provided the Town with a road map and prioritization strategy on which of its many competing coastal resilience wastewater infrastructure needs to address first. Building on the findings of the Assessment, the Town has proceeded with the design of coastal resilience mitigation measures for three pump stations which were among the highest priority stations because they serve critical infrastructure (a hospital, fire department and police department). Coastal resilience measures incorporated into the design include the use of flood planks, structural reinforcement of existing structures (Figure 2), sealing potential water entry points and installation of emergency bypass connections (Figure 3). The construction of pump station bypass connections has been completed and relocation and elevation of emergency generators is in progress. Additionally, following multiple Nor'easter storms in 2018 that exceeded the regional 40-year flood stage record, the Town conducted an evaluation of the impact of anticipated increased rainfall from more frequent and intense storms on the infiltration/inflow entering its collection system. The repetitive, consecutive nature of the 2018 storms elevated the groundwater table, producing more head pressure in the gravity collection system which dramatically increased infiltration rates entering the collection system and being conveyed to the Wareham Water Pollution Control Facility. The Town has successfully constructed the retrofit measures recommended by the I/I projections evaluation (Figure 4). Town of Oak Bluffs, MA (infrastructure exposed to the open ocean) -The Town of Oak Bluffs is a coastal community on the island of Martha's Vineyard. Its three vulnerable stations serve over 90% of the Town's sewered population, including many residences and the Town's primary commercial district (Figure 5). The Town recently completed the construction of mitigation measures to increase the coastal resilience of the stations through installation of a new emergency generator on a raised platform (Figure 6) and relocation of critical pump station equipment outside of the flood zone. The Town is currently in final design of an elevated electrical building superstructure designed to withstand anticipated flood conditions, with accommodations for the impacts of climate change through its design life. Town of Chatham, MA (tidally influenced coastal pond) - The Town of Chatham is a coastal community on Cape Cod. One of the Town's wet pit/dry pit pumping stations (Mill Pond) is located at the base of a tidally influenced coastal pond; updated FEMA flood maps show that the location is vulnerable to storm surges and flood events. During the Mill Pond Pumping Station Upgrade design, multiple flood protection measures were incorporated to increase the coastal resilience of the station. These measures include the establishment of a design flood elevation for the project which incorporates anticipated effects of sea level rise, installation of hydrophilic water stops and a flood proof entry door with stop blocks to provide flood mitigation measures (Figure 7). Town of Uxbridge, MA (inland river flood plain) — The Town of Uxbridge is an inland community in Central Massachusetts. Since construction of its centralized collection system the Blackstone River flood plain maps been revised and recent storm events have indicated that the Town's largest pump station is now vulnerable to the 100 year flood storm. During one storm event water was observed entering the station's wet well through conduits and rising within a couple inches of the top of the entrance tube (Figure 8). Additionally, the existing generator room was flooded, rendering equipment in the room inoperable during the storm event. The Town has finished construction mitigation measures to increase the flood resilience of this critical infrastructure, including raising vulnerable infrastructure above flood levels (Figure 9).
This paper was presented at the WEF Collection Systems and Stormwater Conference, April 9-12, 2024.
SpeakerRudenko, Anastasia
Presentation time
14:00:00
14:30:00
Session time
13:30:00
16:45:00
SessionLocal Case Studies
Session number23
Session locationConnecticut Convention Center, Hartford, Connecticut
TopicClimate Change Adaptation, Collection Systems, Combined Sewer Overflow, Combined Sewer System, Construction, Deep Sewer Tunnel, Design Storm, Infiltration/Inflow, Precipitation Frequency, Sewer Separation, SSO Reduction, Stormwater Case Study/Application, Surface Water, Utility Management, Water Quality
TopicClimate Change Adaptation, Collection Systems, Combined Sewer Overflow, Combined Sewer System, Construction, Deep Sewer Tunnel, Design Storm, Infiltration/Inflow, Precipitation Frequency, Sewer Separation, SSO Reduction, Stormwater Case Study/Application, Surface Water, Utility Management, Water Quality
Author(s)
Rudenko, Anastasia
Author(s)A. Rudenko1, M. Drainville1
Author affiliation(s)GHD 1
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Apr 2024
DOI10.2175/193864718825159378
Volume / Issue
Content sourceCollection Systems and Stormwater Conference
Copyright2024
Word count14

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New England Case Studies'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New...
Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New England Case Studies
Pricing
Non-member price: $11.50
Member price:
-10102383
Get access
-10102383
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New England Case Studies'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New...
Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New England Case Studies
Abstract
Collection systems and treatment facilities serve as an important environmental line of defense against wastewater contamination of groundwater and coastal embayments. With more intense and frequent storm events and rising sea levels, many communities are facing an increased risk to critical wastewater infrastructure from flooding and storm damage affecting critical wastewater infrastructure (Figure 1). This presentation will use case studies for collection system infrastructure along multiple types of waterbodies to discuss flood resilience measures being evaluated and implemented in Southeastern Massachusetts. The case studies discuss collection system infrastructure along: -Complex coastal estuarine shorelines -Open ocean -Tidally influenced coastal ponds -Inland river flood plains The presentation will also focus on how these communities are incorporating accommodations for projected changes in storm intensity and frequency into flood resilience evaluation, design and construction. A brief description of each case study is summarized below. Town of Wareham, MA (complex coastal estuarine shorelines) - The Town of Wareham is a coastal community with over 54 miles of coastline. Hydraulic constrictions caused by the complex coastal estuarine system results in high anticipated flood levels, up to 21 feet above mean sea level. The Town recently completed a 'Risk and Vulnerability Assessment', which provided them with a valuable tool to quantify the anticipated costs borne to the Town and its citizens if any vulnerable pump station failed during a 100-year storm event. The assessment provided the Town with a road map and prioritization strategy on which of its many competing coastal resilience wastewater infrastructure needs to address first. Building on the findings of the Assessment, the Town has proceeded with the design of coastal resilience mitigation measures for three pump stations which were among the highest priority stations because they serve critical infrastructure (a hospital, fire department and police department). Coastal resilience measures incorporated into the design include the use of flood planks, structural reinforcement of existing structures (Figure 2), sealing potential water entry points and installation of emergency bypass connections (Figure 3). The construction of pump station bypass connections has been completed and relocation and elevation of emergency generators is in progress. Additionally, following multiple Nor'easter storms in 2018 that exceeded the regional 40-year flood stage record, the Town conducted an evaluation of the impact of anticipated increased rainfall from more frequent and intense storms on the infiltration/inflow entering its collection system. The repetitive, consecutive nature of the 2018 storms elevated the groundwater table, producing more head pressure in the gravity collection system which dramatically increased infiltration rates entering the collection system and being conveyed to the Wareham Water Pollution Control Facility. The Town has successfully constructed the retrofit measures recommended by the I/I projections evaluation (Figure 4). Town of Oak Bluffs, MA (infrastructure exposed to the open ocean) -The Town of Oak Bluffs is a coastal community on the island of Martha's Vineyard. Its three vulnerable stations serve over 90% of the Town's sewered population, including many residences and the Town's primary commercial district (Figure 5). The Town recently completed the construction of mitigation measures to increase the coastal resilience of the stations through installation of a new emergency generator on a raised platform (Figure 6) and relocation of critical pump station equipment outside of the flood zone. The Town is currently in final design of an elevated electrical building superstructure designed to withstand anticipated flood conditions, with accommodations for the impacts of climate change through its design life. Town of Chatham, MA (tidally influenced coastal pond) - The Town of Chatham is a coastal community on Cape Cod. One of the Town's wet pit/dry pit pumping stations (Mill Pond) is located at the base of a tidally influenced coastal pond; updated FEMA flood maps show that the location is vulnerable to storm surges and flood events. During the Mill Pond Pumping Station Upgrade design, multiple flood protection measures were incorporated to increase the coastal resilience of the station. These measures include the establishment of a design flood elevation for the project which incorporates anticipated effects of sea level rise, installation of hydrophilic water stops and a flood proof entry door with stop blocks to provide flood mitigation measures (Figure 7). Town of Uxbridge, MA (inland river flood plain) — The Town of Uxbridge is an inland community in Central Massachusetts. Since construction of its centralized collection system the Blackstone River flood plain maps been revised and recent storm events have indicated that the Town's largest pump station is now vulnerable to the 100 year flood storm. During one storm event water was observed entering the station's wet well through conduits and rising within a couple inches of the top of the entrance tube (Figure 8). Additionally, the existing generator room was flooded, rendering equipment in the room inoperable during the storm event. The Town has finished construction mitigation measures to increase the flood resilience of this critical infrastructure, including raising vulnerable infrastructure above flood levels (Figure 9).
This paper was presented at the WEF Collection Systems and Stormwater Conference, April 9-12, 2024.
SpeakerRudenko, Anastasia
Presentation time
14:00:00
14:30:00
Session time
13:30:00
16:45:00
SessionLocal Case Studies
Session number23
Session locationConnecticut Convention Center, Hartford, Connecticut
TopicClimate Change Adaptation, Collection Systems, Combined Sewer Overflow, Combined Sewer System, Construction, Deep Sewer Tunnel, Design Storm, Infiltration/Inflow, Precipitation Frequency, Sewer Separation, SSO Reduction, Stormwater Case Study/Application, Surface Water, Utility Management, Water Quality
TopicClimate Change Adaptation, Collection Systems, Combined Sewer Overflow, Combined Sewer System, Construction, Deep Sewer Tunnel, Design Storm, Infiltration/Inflow, Precipitation Frequency, Sewer Separation, SSO Reduction, Stormwater Case Study/Application, Surface Water, Utility Management, Water Quality
Author(s)
Rudenko, Anastasia
Author(s)A. Rudenko1, M. Drainville1
Author affiliation(s)GHD 1
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Apr 2024
DOI10.2175/193864718825159378
Volume / Issue
Content sourceCollection Systems and Stormwater Conference
Copyright2024
Word count14

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Rudenko, Anastasia. Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New England Case Studies. Water Environment Federation, 2024. Web. 24 Aug. 2025. <https://www.accesswater.org?id=-10102383CITANCHOR>.
Rudenko, Anastasia. Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New England Case Studies. Water Environment Federation, 2024. Accessed August 24, 2025. https://www.accesswater.org/?id=-10102383CITANCHOR.
Rudenko, Anastasia
Adapting Collection System Infrastructure to Changing Flood Vulnerabilities - New England Case Studies
Access Water
Water Environment Federation
April 11, 2024
August 24, 2025
https://www.accesswater.org/?id=-10102383CITANCHOR