Access Water | Primary Filtration, Don't Forget the First Flush!
lastID = -10128166
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Loading icon
Description: Access Water
Context Menu
Description: Primary Filtration, Don't Forget the First Flush!
Primary Filtration, Don't Forget the First Flush!
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2026-09-25 14:56:48 Chris Lewis Continuous release
  • 2026-09-11 10:00:10 Adam Phillips
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Primary Filtration, Don't Forget the First Flush!
Primary Filtration, Don't Forget the First Flush!

Primary Filtration, Don't Forget the First Flush!

Primary Filtration, Don't Forget the First Flush!

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Primary Filtration, Don't Forget the First Flush!
Primary Filtration, Don't Forget the First Flush!
Abstract
Background: The Water Pollution Control Authority (WPCA), City of Bridgeport, Connecticut is in the process of upgrading their East Side Wastewater Treatment Plant (WWTP). The East Side WWTP currently has an average daily flow of 20.8 ML/d (5.5 mgd) with a 90.8 ML/d (24 mgd) secondary treatment capacity. The WWTP utilizes traditional primary settling tanks, MLE activated sludge process, and sodium hypochlorite disinfection. WPCA's 2020 Facilities Plan recommended increasing the peak flow capacity from 151 ML/d (40 mgd) to 303 ML/d (80 mgd). This increase was recommended to enable treatment of wet weather flows that reach the plant and cost-effectively reduce overall untreated CSO volumes upstream in the collection system. Due to the tight footprint of the site, construction of conventional primary settling tanks was not feasible. Primary filtration technologies were investigated in the Facilities Plan and recommended for full-scale implementation. Primary filtration offers space savings and due to superior removal efficiency, have an added benefit of reducing the load on the downstream biological treatment system. West Side WWTP Primary Filtration Pilot: A 6-week onsite primary filtration pilot study was completed from March to May 2023 at the WPCA's larger West Side WWTP [1]. Figures 1 and 2 depict the pile cloth media filtration (PMCF) unit used during the pilot study. WWTP primary influent flow served as the influent to the pilot unit. Influent and effluent parameters were assessed to evaluate the performance of the PMCF. The unit was tested under a range of flows and loads, representative of full-scale operating conditions. Through this piloting effort, Aqua Aerobic Systems' (AASI) PCMF was identified as a promising technology for full-scale implementation at both WWTPs. During two wet weather events that occurred during that study period, Total Suspended Solids (TSS) and Biological Oxygen Demand (BOD) concentrations reached a peak of 260 mg/L and 180 mg/L respectively. As design activities progressed from the West Side WWTP to the East Side WWTP, it was initially anticipated that TSS and BOD concentrations at the two WWTPs would be comparable, as both are CSO systems, though with different tributary areas. Operators at the East Side WWTP indicated that the facility could see a sustained first flush of solids during a rain event. They described a significant influx of solids at the start of an event that could last for many hours. CDM Smith and the WPCA decided to complete a wet weather sampling program to define this phenomenon on the East Side WWTP and determine the impact it would have on the design and operation of a primary filter installation. Wet Weather 'First Flush' Profiling: Field sampling activities were completed in October 2025, to better understand when the first flush occurs during an event, and to quantify the spike loading that would occur. It was expected that the first flush would occur prior to peak flow conditions. At peak flow, solids concentrations were expected to be diluted by rainwater in the combined sewer system. An indexing sampler was set up adjacent to the primary influent channel to collect 4 sample increments into an hourly composite sample. Samples were collected from the primary influent channel on October 7, 12, and 29, 2025 during wet weather events. Sampling started prior to the predicted rainfall and ran for 24 hours, and WPCA staff recorded hourly plant flows to correlate to the sample intervals. Table 1 depicts the wet weather events that were captured during this effort. During all 3 events, a sustained 'first flush' condition was observed, where a period of elevated organic and solids loading coincided with elevated plant influent flow. Figures 3 through 8 illustrate the WWTP influent flow during these 3 storms against the influent TSS and BOD concentrations. These events lasted from 3 to 5 hours before solids concentrations diluted from the incoming stormwater. TSS concentrations peaked during all 3 events between 500-600 mg/L. This was a more substantial wet weather response, with higher solids concentrations, than were seen at the West Side WWTP. Of particular note, the results from the October 29th storm showed that the peak WWTP flow during the event (130.2 ML/d, 34.4 mgd) coincided with the peak solids loading (580 mg/L), resulting in a very high solids loading rate of 166,400 lb/d. The solids loading rate during this 'first flush' period during the October 29th storm exceeded the vendor recommendations of 10-12 lbs/ft2/day. This dictated a revision to the design concept. It had been anticipated that providing a filter system with a filter rate of 4.30 gpm/sf to handle the diluted peak flow of the new facility (303 ML/d, 80 mgd) would also have adequate capacity to meet solids loading at any interim flow and load condition. The field sampling proved that this was not true, and the first flush could be so significant that it necessitated the inclusion of additional filter units into the planned primary filter facility. Conclusion: The sampling conducted at the East Side WWTP was an invaluable tool to help the team understand the first flush response of the combined system. The results informed the solids loading rate and drove the decision to add additional filter units to the design. This first flush condition controlled the design sizing, and must be considered in any primary filtration design.
This paper was presented at WEFTEC 2026 in New Orleans, Louisiana.
Presentation time
09:30:00
10:00:00
Session time
8:30:00
10:00:00
SessionAdvanced Primary Treatment Pathways: High-rate Filtration and Sludge Process Integration 
Session locationErnest N. Morial Convention Center
TopicFacility Operations and Maintenance, Municipal Wastewater Treatment Design
TopicFacility Operations and Maintenance, Municipal Wastewater Treatment Design
Author(s)
Thompson, Daniel, Gupta, Vedansh
Author(s)D. Thompson1, V. Gupta2
Author affiliation(s)CDM Smith, 1Aqua Aerobic Systems Inc, 2
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep 2026
DOI10.2175/193864718825160331
Volume / Issue
Content sourceWEFTEC
Copyright2026
Word count8

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Primary Filtration, Don't Forget the First Flush!'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Primary Filtration, Don't Forget the First Flush!
Primary Filtration, Don't Forget the First Flush!
Pricing
Non-member price: $11.50
Member price:
-10128166
Get access
-10128166
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Primary Filtration, Don't Forget the First Flush!'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Primary Filtration, Don't Forget the First Flush!
Primary Filtration, Don't Forget the First Flush!
Abstract
Background: The Water Pollution Control Authority (WPCA), City of Bridgeport, Connecticut is in the process of upgrading their East Side Wastewater Treatment Plant (WWTP). The East Side WWTP currently has an average daily flow of 20.8 ML/d (5.5 mgd) with a 90.8 ML/d (24 mgd) secondary treatment capacity. The WWTP utilizes traditional primary settling tanks, MLE activated sludge process, and sodium hypochlorite disinfection. WPCA's 2020 Facilities Plan recommended increasing the peak flow capacity from 151 ML/d (40 mgd) to 303 ML/d (80 mgd). This increase was recommended to enable treatment of wet weather flows that reach the plant and cost-effectively reduce overall untreated CSO volumes upstream in the collection system. Due to the tight footprint of the site, construction of conventional primary settling tanks was not feasible. Primary filtration technologies were investigated in the Facilities Plan and recommended for full-scale implementation. Primary filtration offers space savings and due to superior removal efficiency, have an added benefit of reducing the load on the downstream biological treatment system. West Side WWTP Primary Filtration Pilot: A 6-week onsite primary filtration pilot study was completed from March to May 2023 at the WPCA's larger West Side WWTP [1]. Figures 1 and 2 depict the pile cloth media filtration (PMCF) unit used during the pilot study. WWTP primary influent flow served as the influent to the pilot unit. Influent and effluent parameters were assessed to evaluate the performance of the PMCF. The unit was tested under a range of flows and loads, representative of full-scale operating conditions. Through this piloting effort, Aqua Aerobic Systems' (AASI) PCMF was identified as a promising technology for full-scale implementation at both WWTPs. During two wet weather events that occurred during that study period, Total Suspended Solids (TSS) and Biological Oxygen Demand (BOD) concentrations reached a peak of 260 mg/L and 180 mg/L respectively. As design activities progressed from the West Side WWTP to the East Side WWTP, it was initially anticipated that TSS and BOD concentrations at the two WWTPs would be comparable, as both are CSO systems, though with different tributary areas. Operators at the East Side WWTP indicated that the facility could see a sustained first flush of solids during a rain event. They described a significant influx of solids at the start of an event that could last for many hours. CDM Smith and the WPCA decided to complete a wet weather sampling program to define this phenomenon on the East Side WWTP and determine the impact it would have on the design and operation of a primary filter installation. Wet Weather 'First Flush' Profiling: Field sampling activities were completed in October 2025, to better understand when the first flush occurs during an event, and to quantify the spike loading that would occur. It was expected that the first flush would occur prior to peak flow conditions. At peak flow, solids concentrations were expected to be diluted by rainwater in the combined sewer system. An indexing sampler was set up adjacent to the primary influent channel to collect 4 sample increments into an hourly composite sample. Samples were collected from the primary influent channel on October 7, 12, and 29, 2025 during wet weather events. Sampling started prior to the predicted rainfall and ran for 24 hours, and WPCA staff recorded hourly plant flows to correlate to the sample intervals. Table 1 depicts the wet weather events that were captured during this effort. During all 3 events, a sustained 'first flush' condition was observed, where a period of elevated organic and solids loading coincided with elevated plant influent flow. Figures 3 through 8 illustrate the WWTP influent flow during these 3 storms against the influent TSS and BOD concentrations. These events lasted from 3 to 5 hours before solids concentrations diluted from the incoming stormwater. TSS concentrations peaked during all 3 events between 500-600 mg/L. This was a more substantial wet weather response, with higher solids concentrations, than were seen at the West Side WWTP. Of particular note, the results from the October 29th storm showed that the peak WWTP flow during the event (130.2 ML/d, 34.4 mgd) coincided with the peak solids loading (580 mg/L), resulting in a very high solids loading rate of 166,400 lb/d. The solids loading rate during this 'first flush' period during the October 29th storm exceeded the vendor recommendations of 10-12 lbs/ft2/day. This dictated a revision to the design concept. It had been anticipated that providing a filter system with a filter rate of 4.30 gpm/sf to handle the diluted peak flow of the new facility (303 ML/d, 80 mgd) would also have adequate capacity to meet solids loading at any interim flow and load condition. The field sampling proved that this was not true, and the first flush could be so significant that it necessitated the inclusion of additional filter units into the planned primary filter facility. Conclusion: The sampling conducted at the East Side WWTP was an invaluable tool to help the team understand the first flush response of the combined system. The results informed the solids loading rate and drove the decision to add additional filter units to the design. This first flush condition controlled the design sizing, and must be considered in any primary filtration design.
This paper was presented at WEFTEC 2026 in New Orleans, Louisiana.
Presentation time
09:30:00
10:00:00
Session time
8:30:00
10:00:00
SessionAdvanced Primary Treatment Pathways: High-rate Filtration and Sludge Process Integration 
Session locationErnest N. Morial Convention Center
TopicFacility Operations and Maintenance, Municipal Wastewater Treatment Design
TopicFacility Operations and Maintenance, Municipal Wastewater Treatment Design
Author(s)
Thompson, Daniel, Gupta, Vedansh
Author(s)D. Thompson1, V. Gupta2
Author affiliation(s)CDM Smith, 1Aqua Aerobic Systems Inc, 2
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep 2026
DOI10.2175/193864718825160331
Volume / Issue
Content sourceWEFTEC
Copyright2026
Word count8

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2026 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Thompson, Daniel. Primary Filtration, Don't Forget the First Flush!. Water Environment Federation, 2026. Web. 2 Nov. 2026. <https://www.accesswater.org?id=-10128166CITANCHOR>.
Thompson, Daniel. Primary Filtration, Don't Forget the First Flush!. Water Environment Federation, 2026. Accessed November 2, 2026. https://www.accesswater.org/?id=-10128166CITANCHOR.
Thompson, Daniel
Primary Filtration, Don't Forget the First Flush!
Access Water
Water Environment Federation
September 30, 2026
November 2, 2026
https://www.accesswater.org/?id=-10128166CITANCHOR