Access Water | Intensifying BNR with low DO and DAS: The Start-up Story
lastID = -10128256
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Loading icon
Description: Access Water
Context Menu
Description: Intensifying BNR with low DO and DAS: The Start-up Story
Intensifying BNR with low DO and DAS: The Start-up Story
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2026-09-25 14:55:44 Chris Lewis Continuous release
  • 2026-09-11 10:01:00 Adam Phillips
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Intensifying BNR with low DO and DAS: The Start-up Story
Intensifying BNR with low DO and DAS: The Start-up Story

Intensifying BNR with low DO and DAS: The Start-up Story

Intensifying BNR with low DO and DAS: The Start-up Story

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Intensifying BNR with low DO and DAS: The Start-up Story
Intensifying BNR with low DO and DAS: The Start-up Story
Abstract
ABSTRACT: This paper provides startup insights from Boulder WRRF's upgrade from MLE configuration to continuous flow densified activated sludge (DAS) with low DO without the internal mixed liquor recycle (IMLR). The DAS upgrade reduced SVI30 from 223±57 to 76±12 mL/g (66% improvement) and enabled granule formation. Profiling P release and uptake across the basins showed evidence of EBPR with potential for improved P uptake. The ongoing optimization will further fine tune the ABAC and the biological selection to improve SND and EBPR. BACKGROUND: The Boulder WRRF was recently upgraded to include hydrocyclones for physical selection and tank modifications for biological selection (without IMLR). The process changes are shown in Figure 1 and the timeline of the upgrade is shown in Table 1. Hydrocyclones were installed as a mixed liquor (ML) wasting process, with the design criteria presented in Table 2. METHODOLOGY: The densification upgrade started with installation of the hydrocyclones followed by conversion of the Z1-Z3 to anaerobic (Table 1). The hydrocyclone was operated with 20 mm and 18 mm nozzles to evaluate the impact of nozzle size on sludge settleability. To acclimate the MLSS to low DO, the aeration control in Z4 to Z8 was changed to constant low DO in May 2025 followed by ABAC in Sep 2025. Performance indicators were closely monitored using inline sensors (Figure 1) and lab analysis. Sludge samples were regularly collected to characterize the PSD, granular mass fraction, and microscopic images to study the evolution of densified sludge. RESULTS Biological selection: Figure 2 shows the selector F/M ratio during and after start-up. The F/M ratio remains above the min level required for granulation. The statistical correlation between the P uptake and the P releases was developed. P uptake was 105 percent of the P release which confirms PAO activity and EBPR occurrence, though this is below typical ratios of 1.2-1.5:1, indicating substantial opportunity for improvement. Ex-situ denitrification batch testing and P release and uptake testing are conducted to measure the specific denitrification rates and PAO activities (presented in the full paper). Settleability Improvements: The changes in sludge settleability during the densification upgrades were evaluated by comparing the SSV and SVI under different operations (Figure 3 and 4). Compared to before, SVI30 after the DAS upgrade was much lower (Figure 3). Considering the 2025 data, there was a steep decline in SVI30 from 223 ± 57 to 56 ± 10 mL/g, indicating the predominance of densified sludge with the physical selector (Figure 4). When the IMLR was turned off, the process maintained similar settleability with a higher SVI30, SSV5, and SSV30 values of 76 ± 12 mL/g, 408 mL/L, and 237 mL/L, respectively. The settleability between operations with nozzle size 20 mm and 18 mm was also compared (Figure 4). The settleability performance with both physical and biological selectors are well within the range reported for densified sludge in other studies (Regmi et al., 2025). Densification: The ML PSD was evaluated over time to track the accumulation of granular biomass (Figure 5). After DAS upgrade, there is rightward shift in particle count to include a higher percent of particles over 200 µm size indicating densification. Moreover, microscopic images of the ML and underflow show the dominant presence of dense granules (Figure 6) and the overflow wasted sludge consisiting of filamentous sludge. The full paper will delve into the change in sludge characteristics by showing the temporal changes in granule mass fraction. Outlook on continued optimization work: The plant effluent concentrations were examined to evaluate the SND and EBPR performance of the low DO process. The average effluent nitrate and TP concentrations after upgrade were 13.4 mg-N/L and 1.5 mg-P/L, respectively, exceeding the targets (10 mg/L NO3 and 1 mg/L TP). Considering P uptake and release rates across different zones, we observe an increase in PAO activity over time with different upgrades (Figure 7). While the increase in PAO inventory is encouraging, the low DO process needs fine tuning. Optimization activities will address the effluent quality issue through two lines of inquiry:
• Secondary carbon dosing: The plant has acetate dosing in the post anoxic zone. It is hypothesized that carbon dosing at the end of the process may interfere with the feast/famine cycle necessary for selecting granules capable of EBPR. Hence, the acetate dosage is minimized currently to investigate its impact on granule formation and ultimately, the effluent quality.
• Fine tuning ABAC DO set points: Comparing monthly average effluent NO3 (Figure 8), the NO3 was lower (< 10 mg-N/L) during constant low DO compared to the ABAC operation (12-14 mg-N/L). The higher NO3 values indicate that the ABAC set points are not optimal for SND. Testing of different max DO set points in a stepwise manner is underway. With the fine tuning of the DO set points, the denitrification in the process is expected to improve. Significance of study: This study delivers practical startup insights for DAS retrofits, highlighting a 6–9 month acclimation period, improved settleability, granule formation trends, and optimization of integrated low-DO/DAS systems. The paper emphasizes lessons learned, including ABAC tuning, biological selector optimization, and balancing low DO with low daily ammonia limits
This paper was presented at WEFTEC 2026 in New Orleans, Louisiana.
Presentation time
10:30:00
11:00:00
Session time
10:30:00
12:00:00
SessionDensified Activated Sludge: From Startup to Optimization
Session locationErnest N. Morial Convention Center
TopicFacility Operations and Maintenance, Municipal Wastewater Treatment Design
TopicFacility Operations and Maintenance, Municipal Wastewater Treatment Design
Author(s)
Arabi, Sara, Brown, Nathan, Sigmon, Cole, Marks, Christopher, Regmi, Pusker, Lakshminarasimman, Narasimman, Trujillo, Shelley, Janoka, Brad
Author(s)S. Arabi1, N. Brown1, C. Sigmon2, C. Marks2, P. Regmi1, N. Lakshminarasimman1, S. Trujillo, B. Janoka2
Author affiliation(s)Stantec Inc., 1Stantec Inc., 1City of Boulder, 2City of Boulder, 2Stantec Inc., 1Stantec Inc., 1City of Boulder, 2
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep 2026
DOI10.2175/193864718825160421
Volume / Issue
Content sourceWEFTEC
Copyright2026
Word count11

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Intensifying BNR with low DO and DAS: The Start-up Story'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Intensifying BNR with low DO and DAS: The Start-up Story
Intensifying BNR with low DO and DAS: The Start-up Story
Pricing
Non-member price: $11.50
Member price:
-10128256
Get access
-10128256
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Intensifying BNR with low DO and DAS: The Start-up Story'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Intensifying BNR with low DO and DAS: The Start-up Story
Intensifying BNR with low DO and DAS: The Start-up Story
Abstract
ABSTRACT: This paper provides startup insights from Boulder WRRF's upgrade from MLE configuration to continuous flow densified activated sludge (DAS) with low DO without the internal mixed liquor recycle (IMLR). The DAS upgrade reduced SVI30 from 223±57 to 76±12 mL/g (66% improvement) and enabled granule formation. Profiling P release and uptake across the basins showed evidence of EBPR with potential for improved P uptake. The ongoing optimization will further fine tune the ABAC and the biological selection to improve SND and EBPR. BACKGROUND: The Boulder WRRF was recently upgraded to include hydrocyclones for physical selection and tank modifications for biological selection (without IMLR). The process changes are shown in Figure 1 and the timeline of the upgrade is shown in Table 1. Hydrocyclones were installed as a mixed liquor (ML) wasting process, with the design criteria presented in Table 2. METHODOLOGY: The densification upgrade started with installation of the hydrocyclones followed by conversion of the Z1-Z3 to anaerobic (Table 1). The hydrocyclone was operated with 20 mm and 18 mm nozzles to evaluate the impact of nozzle size on sludge settleability. To acclimate the MLSS to low DO, the aeration control in Z4 to Z8 was changed to constant low DO in May 2025 followed by ABAC in Sep 2025. Performance indicators were closely monitored using inline sensors (Figure 1) and lab analysis. Sludge samples were regularly collected to characterize the PSD, granular mass fraction, and microscopic images to study the evolution of densified sludge. RESULTS Biological selection: Figure 2 shows the selector F/M ratio during and after start-up. The F/M ratio remains above the min level required for granulation. The statistical correlation between the P uptake and the P releases was developed. P uptake was 105 percent of the P release which confirms PAO activity and EBPR occurrence, though this is below typical ratios of 1.2-1.5:1, indicating substantial opportunity for improvement. Ex-situ denitrification batch testing and P release and uptake testing are conducted to measure the specific denitrification rates and PAO activities (presented in the full paper). Settleability Improvements: The changes in sludge settleability during the densification upgrades were evaluated by comparing the SSV and SVI under different operations (Figure 3 and 4). Compared to before, SVI30 after the DAS upgrade was much lower (Figure 3). Considering the 2025 data, there was a steep decline in SVI30 from 223 ± 57 to 56 ± 10 mL/g, indicating the predominance of densified sludge with the physical selector (Figure 4). When the IMLR was turned off, the process maintained similar settleability with a higher SVI30, SSV5, and SSV30 values of 76 ± 12 mL/g, 408 mL/L, and 237 mL/L, respectively. The settleability between operations with nozzle size 20 mm and 18 mm was also compared (Figure 4). The settleability performance with both physical and biological selectors are well within the range reported for densified sludge in other studies (Regmi et al., 2025). Densification: The ML PSD was evaluated over time to track the accumulation of granular biomass (Figure 5). After DAS upgrade, there is rightward shift in particle count to include a higher percent of particles over 200 µm size indicating densification. Moreover, microscopic images of the ML and underflow show the dominant presence of dense granules (Figure 6) and the overflow wasted sludge consisiting of filamentous sludge. The full paper will delve into the change in sludge characteristics by showing the temporal changes in granule mass fraction. Outlook on continued optimization work: The plant effluent concentrations were examined to evaluate the SND and EBPR performance of the low DO process. The average effluent nitrate and TP concentrations after upgrade were 13.4 mg-N/L and 1.5 mg-P/L, respectively, exceeding the targets (10 mg/L NO3 and 1 mg/L TP). Considering P uptake and release rates across different zones, we observe an increase in PAO activity over time with different upgrades (Figure 7). While the increase in PAO inventory is encouraging, the low DO process needs fine tuning. Optimization activities will address the effluent quality issue through two lines of inquiry:
• Secondary carbon dosing: The plant has acetate dosing in the post anoxic zone. It is hypothesized that carbon dosing at the end of the process may interfere with the feast/famine cycle necessary for selecting granules capable of EBPR. Hence, the acetate dosage is minimized currently to investigate its impact on granule formation and ultimately, the effluent quality.
• Fine tuning ABAC DO set points: Comparing monthly average effluent NO3 (Figure 8), the NO3 was lower (< 10 mg-N/L) during constant low DO compared to the ABAC operation (12-14 mg-N/L). The higher NO3 values indicate that the ABAC set points are not optimal for SND. Testing of different max DO set points in a stepwise manner is underway. With the fine tuning of the DO set points, the denitrification in the process is expected to improve. Significance of study: This study delivers practical startup insights for DAS retrofits, highlighting a 6–9 month acclimation period, improved settleability, granule formation trends, and optimization of integrated low-DO/DAS systems. The paper emphasizes lessons learned, including ABAC tuning, biological selector optimization, and balancing low DO with low daily ammonia limits
This paper was presented at WEFTEC 2026 in New Orleans, Louisiana.
Presentation time
10:30:00
11:00:00
Session time
10:30:00
12:00:00
SessionDensified Activated Sludge: From Startup to Optimization
Session locationErnest N. Morial Convention Center
TopicFacility Operations and Maintenance, Municipal Wastewater Treatment Design
TopicFacility Operations and Maintenance, Municipal Wastewater Treatment Design
Author(s)
Arabi, Sara, Brown, Nathan, Sigmon, Cole, Marks, Christopher, Regmi, Pusker, Lakshminarasimman, Narasimman, Trujillo, Shelley, Janoka, Brad
Author(s)S. Arabi1, N. Brown1, C. Sigmon2, C. Marks2, P. Regmi1, N. Lakshminarasimman1, S. Trujillo, B. Janoka2
Author affiliation(s)Stantec Inc., 1Stantec Inc., 1City of Boulder, 2City of Boulder, 2Stantec Inc., 1Stantec Inc., 1City of Boulder, 2
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep 2026
DOI10.2175/193864718825160421
Volume / Issue
Content sourceWEFTEC
Copyright2026
Word count11

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2026 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Arabi, Sara. Intensifying BNR with low DO and DAS: The Start-up Story. Water Environment Federation, 2026. Web. 1 Nov. 2026. <https://www.accesswater.org?id=-10128256CITANCHOR>.
Arabi, Sara. Intensifying BNR with low DO and DAS: The Start-up Story. Water Environment Federation, 2026. Accessed November 1, 2026. https://www.accesswater.org/?id=-10128256CITANCHOR.
Arabi, Sara
Intensifying BNR with low DO and DAS: The Start-up Story
Access Water
Water Environment Federation
September 30, 2026
November 1, 2026
https://www.accesswater.org/?id=-10128256CITANCHOR