lastID = -279777
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: St. Louis MSD CSO Volume Reduction Green Infrastructure Program
St. Louis MSD CSO Volume Reduction Green Infrastructure Program
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:41:22 Adam Phillips
  • 2022-05-04 21:41:21 Adam Phillips
  • 2020-03-30 23:01:11 Adam Phillips
  • 2020-03-30 23:01:10 Adam Phillips
  • 2020-03-27 15:42:52 Katherine Saltzman
  • 2020-03-27 15:42:51 Katherine Saltzman
  • 2020-03-26 22:41:11 Adam Phillips
  • 2020-03-26 22:41:10 Adam Phillips
  • 2020-02-23 15:04:02 Adam Phillips
  • 2020-02-23 15:04:01 Adam Phillips
  • 2020-02-01 04:23:02 Administrator
  • 2020-02-01 04:23:01 Administrator
  • 2020-02-01 04:23:00 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: St. Louis MSD CSO Volume Reduction Green Infrastructure Program
St. Louis MSD CSO Volume Reduction Green Infrastructure Program

St. Louis MSD CSO Volume Reduction Green Infrastructure Program

St. Louis MSD CSO Volume Reduction Green Infrastructure Program

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: St. Louis MSD CSO Volume Reduction Green Infrastructure Program
St. Louis MSD CSO Volume Reduction Green Infrastructure Program
Abstract
The Metropolitan St. Louis Sewer District (MSD) is a regional Special Sewer District that provides Wastewater and Stormwater services to the City of St. Louis and most of St. Louis County, Missouri. The service area includes a Combined Sewer System (CSS) in the City and the older portions of the County. In 2011, MSD completed a Combined Sewer Overflow Long-Term Control Plan (LTCP), which was formalized in a Consent Decree (CD) with the U.S. Environmental Protection Agency (EPA) in April, 2012. MSD’s Combined Sewer Overflow (CSO) control plan includes a $100 million CSO Volume Reduction Green Infrastructure Program in the areas of the City of St. Louis that flow toward the Mississippi River CSOs. MSD spent five years conducting a $3 million CSO Volume Reduction Green Infrastructure Pilot Program, culminating in a CD required final report completed in December 2015. The report explains what work was completed in the GI Pilot Program and the results, and outlines MSD’s plan for full implementation of the CSO Volume Reduction Green Infrastructure Program control measure. This presentation will briefly review the GI Pilot Program, with the main focus to discuss the findings of the GI Pilot Program and the plan for full-implementation of the $100 million CSO Volume Reduction Green Infrastructure Program. Included will be major components of the program, the expected reduction in CSO volume and use of an adaptive management approach to manage the CSO Volume Reduction Green Infrastructure Program through 2034.Implementation of green infrastructure for CSO volume reduction is one of many ways green infrastructure can be strategized for use in urban areas. As a separate entity from the City of St. Louis, MSD's plan highlights the important role that collaboration must have in the implementation of the CSO Volume Reduction Green Infrastructure Program. The plan for full implementation of the CSO Volume Reduction Green Infrastructure Program was developed with critical consideration of public-private partnerships, support of planned use areas and encouraging development and redevelopment in the City of St. Louis. Found to be effective in the GI Pilot Program, these same strategies are applicable to other communities planning and implementing green infrastructure programs.
The Metropolitan St. Louis Sewer District (MSD) is a regional Special Sewer District that provides Wastewater and Stormwater services to the City of St. Louis and most of St. Louis County, Missouri. The service area includes a Combined Sewer System (CSS) in the City and the older portions of the County. In 2011, MSD completed a Combined Sewer Overflow Long-Term Control Plan (LTCP), which was...
Author(s)
Melantha D NortonGary T Moore
SourceProceedings of the Water Environment Federation
SubjectResearch Article
Document typeConference Paper
PublisherWater Environment Federation
Print publication date May, 2017
ISSN1938-6478
DOI10.2175/193864717821494853
Volume / Issue2017 / 2
Content sourceCollection Systems Conference
Copyright2017
Word count364

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'St. Louis MSD CSO Volume Reduction Green Infrastructure Program'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: St. Louis MSD CSO Volume Reduction Green Infrastructure Program
St. Louis MSD CSO Volume Reduction Green Infrastructure Program
Pricing
Non-member price: $11.50
Member price:
-279777
Get access
-279777
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'St. Louis MSD CSO Volume Reduction Green Infrastructure Program'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: St. Louis MSD CSO Volume Reduction Green Infrastructure Program
St. Louis MSD CSO Volume Reduction Green Infrastructure Program
Abstract
The Metropolitan St. Louis Sewer District (MSD) is a regional Special Sewer District that provides Wastewater and Stormwater services to the City of St. Louis and most of St. Louis County, Missouri. The service area includes a Combined Sewer System (CSS) in the City and the older portions of the County. In 2011, MSD completed a Combined Sewer Overflow Long-Term Control Plan (LTCP), which was formalized in a Consent Decree (CD) with the U.S. Environmental Protection Agency (EPA) in April, 2012. MSD’s Combined Sewer Overflow (CSO) control plan includes a $100 million CSO Volume Reduction Green Infrastructure Program in the areas of the City of St. Louis that flow toward the Mississippi River CSOs. MSD spent five years conducting a $3 million CSO Volume Reduction Green Infrastructure Pilot Program, culminating in a CD required final report completed in December 2015. The report explains what work was completed in the GI Pilot Program and the results, and outlines MSD’s plan for full implementation of the CSO Volume Reduction Green Infrastructure Program control measure. This presentation will briefly review the GI Pilot Program, with the main focus to discuss the findings of the GI Pilot Program and the plan for full-implementation of the $100 million CSO Volume Reduction Green Infrastructure Program. Included will be major components of the program, the expected reduction in CSO volume and use of an adaptive management approach to manage the CSO Volume Reduction Green Infrastructure Program through 2034.Implementation of green infrastructure for CSO volume reduction is one of many ways green infrastructure can be strategized for use in urban areas. As a separate entity from the City of St. Louis, MSD's plan highlights the important role that collaboration must have in the implementation of the CSO Volume Reduction Green Infrastructure Program. The plan for full implementation of the CSO Volume Reduction Green Infrastructure Program was developed with critical consideration of public-private partnerships, support of planned use areas and encouraging development and redevelopment in the City of St. Louis. Found to be effective in the GI Pilot Program, these same strategies are applicable to other communities planning and implementing green infrastructure programs.
The Metropolitan St. Louis Sewer District (MSD) is a regional Special Sewer District that provides Wastewater and Stormwater services to the City of St. Louis and most of St. Louis County, Missouri. The service area includes a Combined Sewer System (CSS) in the City and the older portions of the County. In 2011, MSD completed a Combined Sewer Overflow Long-Term Control Plan (LTCP), which was...
Author(s)
Melantha D NortonGary T Moore
SourceProceedings of the Water Environment Federation
SubjectResearch Article
Document typeConference Paper
PublisherWater Environment Federation
Print publication date May, 2017
ISSN1938-6478
DOI10.2175/193864717821494853
Volume / Issue2017 / 2
Content sourceCollection Systems Conference
Copyright2017
Word count364

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Melantha D Norton# Gary T Moore. St. Louis MSD CSO Volume Reduction Green Infrastructure Program. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 2 Jul. 2025. <https://www.accesswater.org?id=-279777CITANCHOR>.
Melantha D Norton# Gary T Moore. St. Louis MSD CSO Volume Reduction Green Infrastructure Program. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed July 2, 2025. https://www.accesswater.org/?id=-279777CITANCHOR.
Melantha D Norton# Gary T Moore
St. Louis MSD CSO Volume Reduction Green Infrastructure Program
Access Water
Water Environment Federation
December 22, 2018
July 2, 2025
https://www.accesswater.org/?id=-279777CITANCHOR