lastID = -280397
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: W12-Proceedings
Driving Energy Efficiency of MBR with a Giant LEAP Forward
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-03-31 00:59:41 Adam Phillips
  • 2020-01-31 22:11:52 Administrator
  • 2020-01-31 22:11:51 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: W12-Proceedings
Driving Energy Efficiency of MBR with a Giant LEAP Forward

Driving Energy Efficiency of MBR with a Giant LEAP Forward

Driving Energy Efficiency of MBR with a Giant LEAP Forward

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: W12-Proceedings
Driving Energy Efficiency of MBR with a Giant LEAP Forward
Abstract
The City of Riverside (City) is currently constructing the largest Membrane Bioreactor (MBR) retrofit in the United States as part of the $200 million Regional Water Quality Control Plant (RWQCP) Phase 1 expansion project. The City evaluated the total cost of MBR ownership and membrane system supplier experience and selected GE/Zenon Environmental Corporation (GE) in July of 2010 as providing the best overall value. Initially the City selected GE/Zenon to supply their “10/30 Eco-Aeration Design” system. In July 2011 at the time of the project's 100 percent design submittal, GE released the LEAPmbr system. The City had to decide if the risk of applying the new technology were acceptable. The City decided that the savings in construction cost and energy were worth the risk and delays of implementing the new system. The board approved the change in the system.
The City of Riverside (City) is currently constructing the largest Membrane Bioreactor (MBR) retrofit in the United States as part of the $200 million Regional Water Quality Control Plant (RWQCP) Phase 1 expansion project. The City evaluated the total cost of MBR ownership and membrane system supplier experience and selected GE/Zenon Environmental Corporation (GE) in July of 2010 as providing the...
Author(s)
John CiccotelliSarah MungerGary ValladaoBrad Hemken
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2012
ISSN1938-6478
DOI10.2175/193864712811708554
Volume / Issue2012 / 12
Content sourceWEFTEC
Copyright2012
Word count149

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Driving Energy Efficiency of MBR with a Giant LEAP Forward'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: W12-Proceedings
Driving Energy Efficiency of MBR with a Giant LEAP Forward
Pricing
Non-member price: $11.50
Member price:
-280397
Get access
-280397
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Driving Energy Efficiency of MBR with a Giant LEAP Forward'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: W12-Proceedings
Driving Energy Efficiency of MBR with a Giant LEAP Forward
Abstract
The City of Riverside (City) is currently constructing the largest Membrane Bioreactor (MBR) retrofit in the United States as part of the $200 million Regional Water Quality Control Plant (RWQCP) Phase 1 expansion project. The City evaluated the total cost of MBR ownership and membrane system supplier experience and selected GE/Zenon Environmental Corporation (GE) in July of 2010 as providing the best overall value. Initially the City selected GE/Zenon to supply their “10/30 Eco-Aeration Design” system. In July 2011 at the time of the project's 100 percent design submittal, GE released the LEAPmbr system. The City had to decide if the risk of applying the new technology were acceptable. The City decided that the savings in construction cost and energy were worth the risk and delays of implementing the new system. The board approved the change in the system.
The City of Riverside (City) is currently constructing the largest Membrane Bioreactor (MBR) retrofit in the United States as part of the $200 million Regional Water Quality Control Plant (RWQCP) Phase 1 expansion project. The City evaluated the total cost of MBR ownership and membrane system supplier experience and selected GE/Zenon Environmental Corporation (GE) in July of 2010 as providing the...
Author(s)
John CiccotelliSarah MungerGary ValladaoBrad Hemken
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2012
ISSN1938-6478
DOI10.2175/193864712811708554
Volume / Issue2012 / 12
Content sourceWEFTEC
Copyright2012
Word count149

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
John Ciccotelli# Sarah Munger# Gary Valladao# Brad Hemken. Driving Energy Efficiency of MBR with a Giant LEAP Forward. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 13 Sep. 2025. <https://www.accesswater.org?id=-280397CITANCHOR>.
John Ciccotelli# Sarah Munger# Gary Valladao# Brad Hemken. Driving Energy Efficiency of MBR with a Giant LEAP Forward. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed September 13, 2025. https://www.accesswater.org/?id=-280397CITANCHOR.
John Ciccotelli# Sarah Munger# Gary Valladao# Brad Hemken
Driving Energy Efficiency of MBR with a Giant LEAP Forward
Access Water
Water Environment Federation
December 22, 2018
September 13, 2025
https://www.accesswater.org/?id=-280397CITANCHOR