lastID = -280434
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: W12-Proceedings
Accomplishing Dual Objectives: Controlling CSO Discharges While Rebuilding Infrastructure.
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-03-31 00:54:37 Adam Phillips
  • 2020-03-31 00:54:36 Adam Phillips
  • 2020-01-31 19:06:58 Administrator
  • 2020-01-31 19:06:57 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: W12-Proceedings
Accomplishing Dual Objectives: Controlling CSO Discharges While Rebuilding Infrastructure.

Accomplishing Dual Objectives: Controlling CSO Discharges While Rebuilding Infrastructure.

Accomplishing Dual Objectives: Controlling CSO Discharges While Rebuilding Infrastructure.

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: W12-Proceedings
Accomplishing Dual Objectives: Controlling CSO Discharges While Rebuilding Infrastructure.
Abstract
Port Huron, Michigan began implementation of its CSO control program in 1997. As of 2012, the City had completed over 95% of the total program, with 32 of 33 projects completed or under construction, and with $171 million in expenditures. After considering both end of pipe controls and sewer separation, the City opted for separation. This decision was based on both the lower cost of the separation alternative and the additional benefits that would be realized in the replacement of severely deteriorated municipal infrastructure. This paper will evaluate the effectiveness of this approach to CSO control. The paper includes a discussion of the work included in the program, amount of infrastructure replacement accomplished, particular issues addressed in design to provide service to properties, implementation approaches to address private inflow sources, total costs and sources of funds, and cost savings versus an end of pipe approach. The analysis relies on original planning documents, updated planning and design documents, implementation cost data and finance data. The paper examines work included in the program, the overall impact on the condition of the City's infrastructure, and an assessment of the cost savings realized through the use of this dual purpose approach.
Port Huron, Michigan began implementation of its CSO control program in 1997. As of 2012, the City had completed over 95% of the total program, with 32 of 33 projects completed or under construction, and with $171 million in expenditures. After considering both end of pipe controls and sewer separation, the City opted for separation. This decision was based on both the lower cost of the separation...
Author(s)
Carol L. HufnagelRobert E. Clegg
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2012
ISSN1938-6478
DOI10.2175/193864712811726824
Volume / Issue2012 / 13
Content sourceWEFTEC
Copyright2012
Word count206

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Accomplishing Dual Objectives: Controlling CSO Discharges While Rebuilding Infrastructure.'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: W12-Proceedings
Accomplishing Dual Objectives: Controlling CSO Discharges While Rebuilding Infrastructure.
Pricing
Non-member price: $11.50
Member price:
-280434
Get access
-280434
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Accomplishing Dual Objectives: Controlling CSO Discharges While Rebuilding Infrastructure.'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: W12-Proceedings
Accomplishing Dual Objectives: Controlling CSO Discharges While Rebuilding Infrastructure.
Abstract
Port Huron, Michigan began implementation of its CSO control program in 1997. As of 2012, the City had completed over 95% of the total program, with 32 of 33 projects completed or under construction, and with $171 million in expenditures. After considering both end of pipe controls and sewer separation, the City opted for separation. This decision was based on both the lower cost of the separation alternative and the additional benefits that would be realized in the replacement of severely deteriorated municipal infrastructure. This paper will evaluate the effectiveness of this approach to CSO control. The paper includes a discussion of the work included in the program, amount of infrastructure replacement accomplished, particular issues addressed in design to provide service to properties, implementation approaches to address private inflow sources, total costs and sources of funds, and cost savings versus an end of pipe approach. The analysis relies on original planning documents, updated planning and design documents, implementation cost data and finance data. The paper examines work included in the program, the overall impact on the condition of the City's infrastructure, and an assessment of the cost savings realized through the use of this dual purpose approach.
Port Huron, Michigan began implementation of its CSO control program in 1997. As of 2012, the City had completed over 95% of the total program, with 32 of 33 projects completed or under construction, and with $171 million in expenditures. After considering both end of pipe controls and sewer separation, the City opted for separation. This decision was based on both the lower cost of the separation...
Author(s)
Carol L. HufnagelRobert E. Clegg
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2012
ISSN1938-6478
DOI10.2175/193864712811726824
Volume / Issue2012 / 13
Content sourceWEFTEC
Copyright2012
Word count206

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Carol L. Hufnagel# Robert E. Clegg. Accomplishing Dual Objectives: Controlling CSO Discharges While Rebuilding Infrastructure. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 5 Jun. 2025. <https://www.accesswater.org?id=-280434CITANCHOR>.
Carol L. Hufnagel# Robert E. Clegg. Accomplishing Dual Objectives: Controlling CSO Discharges While Rebuilding Infrastructure. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 5, 2025. https://www.accesswater.org/?id=-280434CITANCHOR.
Carol L. Hufnagel# Robert E. Clegg
Accomplishing Dual Objectives: Controlling CSO Discharges While Rebuilding Infrastructure.
Access Water
Water Environment Federation
December 22, 2018
June 5, 2025
https://www.accesswater.org/?id=-280434CITANCHOR