lastID = -280898
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer...
The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer Overflow Control Program Success
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:43:26 Adam Phillips
  • 2020-03-30 20:34:45 Adam Phillips
  • 2020-03-30 20:34:44 Adam Phillips
  • 2020-03-27 15:33:39 Katherine Saltzman
  • 2020-03-27 15:33:38 Katherine Saltzman
  • 2020-03-26 22:22:57 Adam Phillips
  • 2020-02-01 04:54:42 Administrator
  • 2020-02-01 04:54:41 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer...
The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer Overflow Control Program Success

The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer Overflow Control Program Success

The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer Overflow Control Program Success

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer...
The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer Overflow Control Program Success
Abstract
Over the past 10 years, the Town of Saugus, Massachusetts (The Town) has experienced several large rain events that have caused significant sanitary sewer overflows (SSOs). Extraneous water entering the sanitary collection system has exceeded the design capacity of the sewer system, forcing the Town to pump excess wastewater directly into the Saugus River in order to protect the Town's main pumping station and its residents. An administrative consent order was issued to the Town by the Massachusetts Department of Environmental Protection (MassDEP) that required an immediate evaluation of the sewer system to assess alternatives and produce a recommended program to control sanitary sewer overflows.A SSO facilities plan evaluated several options to control SSOs. Ultimately, the study recommended comprehensive rehabilitation of nine critical sub-systems over a 10-year period at a cost of $32 million to achieve a 10-year level of control. The plan included complete comprehensive rehabilitation of the public sewer system in these sub-systems, including lining all mainline sewers, service lateral connections from the main to the first joint and lining of all manholes.Due to the extended duration of the project, it was important to ensure predicted performance of the recommended lining rehabilitation measures. To do this, a pilot program was initiated to determine if the rehabilitation products that were specified performed as expected. Post-construction warranty inspections were completed on all lined sewer pipe and manholes prior to the expiration of the contractor's 1-year warranty period to determine the integrity of each installed product and to ensure that they were providing long-term protection from infiltration and inflow.This paper will detail the findings of post-construction warranty inspections, focusing on products used, failure rates, lessons learned and benefits, specifically for long-term construction programs, where consistent, long-lasting solutions are critical to the success of a consent order driven program.
Over the past 10 years, the Town of Saugus, Massachusetts (The Town) has experienced several large rain events that have caused significant sanitary sewer overflows (SSOs). Extraneous water entering the sanitary collection system has exceeded the design capacity of the sewer system, forcing the Town to pump excess wastewater directly into the Saugus River in order to protect the Town's main...
Author(s)
Jonathan KunayPaul E. Ross
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jun, 2012
ISSN1938-6478
DOI10.2175/193864712811699780
Volume / Issue2012 / 4
Content sourceCollection Systems Conference
Copyright2012
Word count314

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer Overflow Control Program Success'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer...
The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer Overflow Control Program Success
Pricing
Non-member price: $11.50
Member price:
-280898
Get access
-280898
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer Overflow Control Program Success'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer...
The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer Overflow Control Program Success
Abstract
Over the past 10 years, the Town of Saugus, Massachusetts (The Town) has experienced several large rain events that have caused significant sanitary sewer overflows (SSOs). Extraneous water entering the sanitary collection system has exceeded the design capacity of the sewer system, forcing the Town to pump excess wastewater directly into the Saugus River in order to protect the Town's main pumping station and its residents. An administrative consent order was issued to the Town by the Massachusetts Department of Environmental Protection (MassDEP) that required an immediate evaluation of the sewer system to assess alternatives and produce a recommended program to control sanitary sewer overflows.A SSO facilities plan evaluated several options to control SSOs. Ultimately, the study recommended comprehensive rehabilitation of nine critical sub-systems over a 10-year period at a cost of $32 million to achieve a 10-year level of control. The plan included complete comprehensive rehabilitation of the public sewer system in these sub-systems, including lining all mainline sewers, service lateral connections from the main to the first joint and lining of all manholes.Due to the extended duration of the project, it was important to ensure predicted performance of the recommended lining rehabilitation measures. To do this, a pilot program was initiated to determine if the rehabilitation products that were specified performed as expected. Post-construction warranty inspections were completed on all lined sewer pipe and manholes prior to the expiration of the contractor's 1-year warranty period to determine the integrity of each installed product and to ensure that they were providing long-term protection from infiltration and inflow.This paper will detail the findings of post-construction warranty inspections, focusing on products used, failure rates, lessons learned and benefits, specifically for long-term construction programs, where consistent, long-lasting solutions are critical to the success of a consent order driven program.
Over the past 10 years, the Town of Saugus, Massachusetts (The Town) has experienced several large rain events that have caused significant sanitary sewer overflows (SSOs). Extraneous water entering the sanitary collection system has exceeded the design capacity of the sewer system, forcing the Town to pump excess wastewater directly into the Saugus River in order to protect the Town's main...
Author(s)
Jonathan KunayPaul E. Ross
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jun, 2012
ISSN1938-6478
DOI10.2175/193864712811699780
Volume / Issue2012 / 4
Content sourceCollection Systems Conference
Copyright2012
Word count314

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Jonathan Kunay# Paul E. Ross. The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer Overflow Control Program Success. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 10 Jun. 2025. <https://www.accesswater.org?id=-280898CITANCHOR>.
Jonathan Kunay# Paul E. Ross. The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer Overflow Control Program Success. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 10, 2025. https://www.accesswater.org/?id=-280898CITANCHOR.
Jonathan Kunay# Paul E. Ross
The Benefits of Post-Construction Warranty Inspections for Long-Term Sanitary Sewer Overflow Control Program Success
Access Water
Water Environment Federation
December 22, 2018
June 10, 2025
https://www.accesswater.org/?id=-280898CITANCHOR