lastID = -281101
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL
Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 17:00:40 Adam Phillips
  • 2022-05-04 17:00:38 Adam Phillips
  • 2020-03-31 00:56:51 Adam Phillips
  • 2020-03-31 00:56:50 Adam Phillips
  • 2020-01-31 20:32:25 Administrator
  • 2020-01-31 20:32:24 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL
Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL

Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL

Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL
Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL
Abstract
The City of St. Petersburg, FL (City) produces an average of 41,000 wet tons per year (WTpY) of Class-B biosolids and 40,000 WTpY of yard waste. The City operates four Water Reclamation Facilities (WRFs): Albert Whitted WRF, NEWRF, NWWRF, and SWWRF. Plans are underway to decommission the Albert Whitted WRF and pump that service area's wastewater to the SWWRF for treatment. The Biosolids- and Yard-Waste-to-Energy Feasibility Study (Study) was driven by the State of Florida's “effective ban” on Class-B biosolids land application (Florida Administrative Code Chapter 62-640) and the City's desire to produce renewable power from currently under-used resources.During the feasibility study, the team (City of St. Petersburg and Brown and Caldwell staff) investigated over 35 options and determined that a 2-phase approach could save the city up to $33 million over the next 20 years. The two phases consist of:Phase 1. Consolidate all solids processing at the SWWRF through a combination of sludge forcemains and the existing collection system. Add primary clarifiers to “catch” the conveyed solids and other settleable solids at the SWWRF and upgrade the digestion at that plant to Class-A, temperature-phased, anaerobic digestion (TPAD). Digester gas would be used to fuel new engines for production of 1.2MW of power and the heat needed for Class-A digestion. Additional thickening and dewatering capacity would also be required.Phase 2. Develop a yard-waste-fueled thermal process to produce additional power; this is currently envisioned as gasification with syngas-to-internal-combustion-engine power generation. Depending on the selected thermal process and its final configuration, biosolids may also be burned in this system.The Phase 1 improvements are moving forward while the Phase 2 efforts have been deferred until certain technical and economic conditions have been met. The two phases have been coordinated so that all Phase 1 improvements will have benefit/be integrated into the Phase 2 improvements.
The City of St. Petersburg, FL (City) produces an average of 41,000 wet tons per year (WTpY) of Class-B biosolids and 40,000 WTpY of yard waste. The City operates four Water Reclamation Facilities (WRFs): Albert Whitted WRF, NEWRF, NWWRF, and SWWRF. Plans are underway to decommission the Albert Whitted WRF and pump that service area's wastewater to the SWWRF for treatment. The Biosolids- and...
Author(s)
John WillisSteve MarshallGeorge CassadyBosso Todd
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2012
ISSN1938-6478
DOI10.2175/193864712811703793
Volume / Issue2012 / 7
Content sourceWEFTEC
Copyright2012
Word count314

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL
Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL
Pricing
Non-member price: $11.50
Member price:
-281101
Get access
-281101
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL
Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL
Abstract
The City of St. Petersburg, FL (City) produces an average of 41,000 wet tons per year (WTpY) of Class-B biosolids and 40,000 WTpY of yard waste. The City operates four Water Reclamation Facilities (WRFs): Albert Whitted WRF, NEWRF, NWWRF, and SWWRF. Plans are underway to decommission the Albert Whitted WRF and pump that service area's wastewater to the SWWRF for treatment. The Biosolids- and Yard-Waste-to-Energy Feasibility Study (Study) was driven by the State of Florida's “effective ban” on Class-B biosolids land application (Florida Administrative Code Chapter 62-640) and the City's desire to produce renewable power from currently under-used resources.During the feasibility study, the team (City of St. Petersburg and Brown and Caldwell staff) investigated over 35 options and determined that a 2-phase approach could save the city up to $33 million over the next 20 years. The two phases consist of:Phase 1. Consolidate all solids processing at the SWWRF through a combination of sludge forcemains and the existing collection system. Add primary clarifiers to “catch” the conveyed solids and other settleable solids at the SWWRF and upgrade the digestion at that plant to Class-A, temperature-phased, anaerobic digestion (TPAD). Digester gas would be used to fuel new engines for production of 1.2MW of power and the heat needed for Class-A digestion. Additional thickening and dewatering capacity would also be required.Phase 2. Develop a yard-waste-fueled thermal process to produce additional power; this is currently envisioned as gasification with syngas-to-internal-combustion-engine power generation. Depending on the selected thermal process and its final configuration, biosolids may also be burned in this system.The Phase 1 improvements are moving forward while the Phase 2 efforts have been deferred until certain technical and economic conditions have been met. The two phases have been coordinated so that all Phase 1 improvements will have benefit/be integrated into the Phase 2 improvements.
The City of St. Petersburg, FL (City) produces an average of 41,000 wet tons per year (WTpY) of Class-B biosolids and 40,000 WTpY of yard waste. The City operates four Water Reclamation Facilities (WRFs): Albert Whitted WRF, NEWRF, NWWRF, and SWWRF. Plans are underway to decommission the Albert Whitted WRF and pump that service area's wastewater to the SWWRF for treatment. The Biosolids- and...
Author(s)
John WillisSteve MarshallGeorge CassadyBosso Todd
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2012
ISSN1938-6478
DOI10.2175/193864712811703793
Volume / Issue2012 / 7
Content sourceWEFTEC
Copyright2012
Word count314

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
John Willis# Steve Marshall# George Cassady# Bosso Todd. Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 5 Jun. 2025. <https://www.accesswater.org?id=-281101CITANCHOR>.
John Willis# Steve Marshall# George Cassady# Bosso Todd. Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 5, 2025. https://www.accesswater.org/?id=-281101CITANCHOR.
John Willis# Steve Marshall# George Cassady# Bosso Todd
Biosolids- and Yard-Waste-to-Energy Feasibility Study in St. Petersburg, FL
Access Water
Water Environment Federation
December 22, 2018
June 5, 2025
https://www.accesswater.org/?id=-281101CITANCHOR