lastID = -281937
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: W13-Proceedings
Trinity River Authority of Texas Alternative Procurement Through Pre-Construction Purchasing: Is It Right For You?
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-03-31 01:49:13 Adam Phillips
  • 2020-03-31 01:49:10 Adam Phillips
  • 2020-02-01 05:51:54 Administrator
  • 2020-02-01 05:51:53 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: W13-Proceedings
Trinity River Authority of Texas Alternative Procurement Through Pre-Construction Purchasing: Is It Right For You?

Trinity River Authority of Texas Alternative Procurement Through Pre-Construction Purchasing: Is It Right For You?

Trinity River Authority of Texas Alternative Procurement Through Pre-Construction Purchasing: Is It Right For You?

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: W13-Proceedings
Trinity River Authority of Texas Alternative Procurement Through Pre-Construction Purchasing: Is It Right For You?
Abstract
By 2020, the Trinity River Authority of Texas (TRA) Central Regional Wastewater System (CRWS) plant is expected to face peak flows that are 45% greater than the current peak flow of 405 mgd. When evaluating the plant's influent facilities, it became clear that TRA could not risk long lead times and schedule delays that could result from typical design-bid-build procurement methods. AECOM recommended pre-purchasing equipment as a part of three separate, consecutive construction contracts at the influent structures of the CRWS plant.The equipment was purchased within budget and installed within aggressive timelines. These examples of pre-purchasing show how an owner can innovatively procure equipment when the timeline requires it. The most important phrase to remember is, “coordination is key”. Whether you are looking to accelerate a project schedule, minimize uncertainty that comes with traditional procurement, or have increased control of cost and equipment selection, pre-construction purchasing may be your solution.
By 2020, the Trinity River Authority of Texas (TRA) Central Regional Wastewater System (CRWS) plant is expected to face peak flows that are 45% greater than the current peak flow of 405 mgd. When evaluating the plant's influent facilities, it became clear that TRA could not risk long lead times and schedule delays that could result from typical design-bid-build procurement methods. AECOM...
Author(s)
Stefanie MasseyBill TatumHoward S. Slobodin
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Oct, 2013
ISSN1938-6478
DOI10.2175/193864713813726939
Volume / Issue2013 / 6
Content sourceWEFTEC
Copyright2013
Word count166

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Trinity River Authority of Texas Alternative Procurement Through Pre-Construction Purchasing: Is It Right For You?'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: W13-Proceedings
Trinity River Authority of Texas Alternative Procurement Through Pre-Construction Purchasing: Is It Right For You?
Pricing
Non-member price: $11.50
Member price:
-281937
Get access
-281937
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Trinity River Authority of Texas Alternative Procurement Through Pre-Construction Purchasing: Is It Right For You?'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: W13-Proceedings
Trinity River Authority of Texas Alternative Procurement Through Pre-Construction Purchasing: Is It Right For You?
Abstract
By 2020, the Trinity River Authority of Texas (TRA) Central Regional Wastewater System (CRWS) plant is expected to face peak flows that are 45% greater than the current peak flow of 405 mgd. When evaluating the plant's influent facilities, it became clear that TRA could not risk long lead times and schedule delays that could result from typical design-bid-build procurement methods. AECOM recommended pre-purchasing equipment as a part of three separate, consecutive construction contracts at the influent structures of the CRWS plant.The equipment was purchased within budget and installed within aggressive timelines. These examples of pre-purchasing show how an owner can innovatively procure equipment when the timeline requires it. The most important phrase to remember is, “coordination is key”. Whether you are looking to accelerate a project schedule, minimize uncertainty that comes with traditional procurement, or have increased control of cost and equipment selection, pre-construction purchasing may be your solution.
By 2020, the Trinity River Authority of Texas (TRA) Central Regional Wastewater System (CRWS) plant is expected to face peak flows that are 45% greater than the current peak flow of 405 mgd. When evaluating the plant's influent facilities, it became clear that TRA could not risk long lead times and schedule delays that could result from typical design-bid-build procurement methods. AECOM...
Author(s)
Stefanie MasseyBill TatumHoward S. Slobodin
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Oct, 2013
ISSN1938-6478
DOI10.2175/193864713813726939
Volume / Issue2013 / 6
Content sourceWEFTEC
Copyright2013
Word count166

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Stefanie Massey# Bill Tatum# Howard S. Slobodin. Trinity River Authority of Texas Alternative Procurement Through Pre-Construction Purchasing: Is It Right For You?. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 29 Jun. 2025. <https://www.accesswater.org?id=-281937CITANCHOR>.
Stefanie Massey# Bill Tatum# Howard S. Slobodin. Trinity River Authority of Texas Alternative Procurement Through Pre-Construction Purchasing: Is It Right For You?. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 29, 2025. https://www.accesswater.org/?id=-281937CITANCHOR.
Stefanie Massey# Bill Tatum# Howard S. Slobodin
Trinity River Authority of Texas Alternative Procurement Through Pre-Construction Purchasing: Is It Right For You?
Access Water
Water Environment Federation
December 22, 2018
June 29, 2025
https://www.accesswater.org/?id=-281937CITANCHOR