lastID = -286982
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Springfield, MO: A Plant-Wide Challenge
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-02-01 04:22:27 Administrator
  • 2020-02-01 04:22:26 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Springfield, MO: A Plant-Wide Challenge

Springfield, MO: A Plant-Wide Challenge

Springfield, MO: A Plant-Wide Challenge

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Springfield, MO: A Plant-Wide Challenge
Abstract
The Springfield, MO Southwest Wastewater Treatment Plant (SWTP) is a 35 mgd facility that is composed of two separate plants: Plant 1 is a two-stage system that incorporates pure oxygen activated sludge in the first stage and biological nitrification in the second stage, while Plant 2 features a uniquely-configured biological phosphorus removal system. The influent waste stream is a challenge to treat for several reasons. Flow rates are highly variable due to excessive I/I problems, resulting in peak day: average flow ratios as high as 3.6:1. Peak flow events are also atypical in that they are often of multiple day duration. BOD and TSS loads to the plant are highly variable due to a significant industrial contribution; effluent BOD limits in the peak flow outfall are not consistently met due to an exorbitantly high soluble BOD fraction that is often observed during extreme wet weather flow events.The SWTP staff currently faces two additional challenges. The most pressing issue concerns a new effluent total phosphorus limit. Second, the Springfield population is steadily growing, requiring that the plant be expanded by about 50% within the next two decades. To address these challenges, several alternatives were examined to expand the plant and incorporate nutrient removal while staying within the bounds of a strict budget. The selected plan was to expand Plant 1 as a single stage biological nutrient removal (BNR) system with air activated sludge and increase Plant 2 capacity by adding primary and final clarifiers to the existing single stage BNR system. This combination resulted in the lowest total project cost; lowest O&M, manpower, and chemical requirements; and lowest sludge production while providing the most streamlined design. Instead of implementing this multi-million dollar capital improvement plan all at once, three phasing plans were developed to distribute the capital investment over the planning period. The selected long-term phased expansion plan allows for a reduction in current capital expenditure from about 70M to 30M by delaying construction on items that will not be needed for several years.
The Springfield, MO Southwest Wastewater Treatment Plant (SWTP) is a 35 mgd facility that is composed of two separate plants: Plant 1 is a two-stage system that incorporates pure oxygen activated sludge in the first stage and biological nitrification in the second stage, while Plant 2 features a uniquely-configured biological phosphorus removal system. The influent waste stream is a challenge to...
Author(s)
Caroline ScruggsTerry JohnsonSam WolfinbargerEd Malter
SourceProceedings of the Water Environment Federation
SubjectSession 39 - Municipal Wastewater Treatment Symposium: Nitrogen and Phosphorus Removal
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2000
ISSN1938-6478
SICI1938-6478(20000101)2000:11L.889;1-
DOI10.2175/193864700784544974
Volume / Issue2000 / 11
Content sourceWEFTEC
First / last page(s)889 - 889
Copyright2000
Word count339

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Springfield, MO: A Plant-Wide Challenge'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Springfield, MO: A Plant-Wide Challenge
Pricing
Non-member price: $11.50
Member price:
-286982
Get access
-286982
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Springfield, MO: A Plant-Wide Challenge'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Springfield, MO: A Plant-Wide Challenge
Abstract
The Springfield, MO Southwest Wastewater Treatment Plant (SWTP) is a 35 mgd facility that is composed of two separate plants: Plant 1 is a two-stage system that incorporates pure oxygen activated sludge in the first stage and biological nitrification in the second stage, while Plant 2 features a uniquely-configured biological phosphorus removal system. The influent waste stream is a challenge to treat for several reasons. Flow rates are highly variable due to excessive I/I problems, resulting in peak day: average flow ratios as high as 3.6:1. Peak flow events are also atypical in that they are often of multiple day duration. BOD and TSS loads to the plant are highly variable due to a significant industrial contribution; effluent BOD limits in the peak flow outfall are not consistently met due to an exorbitantly high soluble BOD fraction that is often observed during extreme wet weather flow events.The SWTP staff currently faces two additional challenges. The most pressing issue concerns a new effluent total phosphorus limit. Second, the Springfield population is steadily growing, requiring that the plant be expanded by about 50% within the next two decades. To address these challenges, several alternatives were examined to expand the plant and incorporate nutrient removal while staying within the bounds of a strict budget. The selected plan was to expand Plant 1 as a single stage biological nutrient removal (BNR) system with air activated sludge and increase Plant 2 capacity by adding primary and final clarifiers to the existing single stage BNR system. This combination resulted in the lowest total project cost; lowest O&M, manpower, and chemical requirements; and lowest sludge production while providing the most streamlined design. Instead of implementing this multi-million dollar capital improvement plan all at once, three phasing plans were developed to distribute the capital investment over the planning period. The selected long-term phased expansion plan allows for a reduction in current capital expenditure from about 70M to 30M by delaying construction on items that will not be needed for several years.
The Springfield, MO Southwest Wastewater Treatment Plant (SWTP) is a 35 mgd facility that is composed of two separate plants: Plant 1 is a two-stage system that incorporates pure oxygen activated sludge in the first stage and biological nitrification in the second stage, while Plant 2 features a uniquely-configured biological phosphorus removal system. The influent waste stream is a challenge to...
Author(s)
Caroline ScruggsTerry JohnsonSam WolfinbargerEd Malter
SourceProceedings of the Water Environment Federation
SubjectSession 39 - Municipal Wastewater Treatment Symposium: Nitrogen and Phosphorus Removal
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2000
ISSN1938-6478
SICI1938-6478(20000101)2000:11L.889;1-
DOI10.2175/193864700784544974
Volume / Issue2000 / 11
Content sourceWEFTEC
First / last page(s)889 - 889
Copyright2000
Word count339

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Caroline Scruggs# Terry Johnson# Sam Wolfinbarger# Ed Malter. Springfield, MO: A Plant-Wide Challenge. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 8 Oct. 2025. <https://www.accesswater.org?id=-286982CITANCHOR>.
Caroline Scruggs# Terry Johnson# Sam Wolfinbarger# Ed Malter. Springfield, MO: A Plant-Wide Challenge. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed October 8, 2025. https://www.accesswater.org/?id=-286982CITANCHOR.
Caroline Scruggs# Terry Johnson# Sam Wolfinbarger# Ed Malter
Springfield, MO: A Plant-Wide Challenge
Access Water
Water Environment Federation
December 22, 2018
October 8, 2025
https://www.accesswater.org/?id=-286982CITANCHOR